Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Project Planning: Assembling a Mortenson “Integrated Work Plan”
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Lightweight Forming System and Roofs for Concrete Floors.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Heavy Concrete Construction Formwork
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Subpart R Steel Erection
Skyscraper Construction
Civil Engineering & Architecture 2.3 Residential Design.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Beam and Slab. Site cast that is cast into forms on site. Typically used for storage facilities, and libraries because it can withstands heavy loads with.
Floor Systems and Foundation Support
Basic Building Construction
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
CONSTRUCTING A FIVE CABIN LATRINE
2001 Winter Presentation. Site Location Site View.
Constructing Homes and Other Buildings
ASSIGNMENT Begin on page 197 “The Foundation”.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
Fire and Emergency Services Company Officer — Lesson 17 Fire and Emergency Services Company Officer, 4 th Edition Chapter 17 — Preincident Planning.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Reading Structural Drawings
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Finishing the Building
Roof and Ceiling Framing
Construction Drawing Occupational Safety and Fundamentals
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Chapter 43 Common Commercial Construction Materials.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Chapter 23: Structural Drafting
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
POS K1a recognize and classify structural forms and materials used in construction (identify examples of frame structures, such as goal posts and girder.
BUILDING CONSTRUCTION
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
Drafting 2 (Arch) Quiz Review #5
Introduction to Building Trades Denver High School.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Leads Institute of Technology & Engineering
Warm-up 9/20/16 What is the underlayment called below the shingles?
THIS IS JEOPARDY.
Foundations of Technology Construction
APPLICATIONS OF TECHNOLOGY
Shop Orientation and Procedures
Unit 6.05 and 6.06-Learning about blueprints
(Refer to Chapter 2 of the textbook)
Construction Technology
CONSTRUCTION MASTERS BONUS BONUS
BUILDING CONSTRUCTION 1
Objective 6.02 part 1: Recognize components of construction
NFPA 600, INDUSTRIAL FIRE BRIGADE Module : 11 BUILDING CONSTRUCTION.
Wrangle Hill Elementary School New Castle, DE
Commercial Construction Projects
Building Construction I Sofia Sebastian 1
1 Semester Project Design A Multi Story Office Building
Foundations of Technology Construction
Masonry Bearing Walls.
Commercial Structural Framing Systems
Presentation transcript:

Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements FebruarySeptemberJanuary Climate, conditions, engineering, design, business, architecture, cost, schedule

Task Overview – Design Ideas 2 Architectural Concept Architects and Designers think through the design process with hand and computer drawn sketches. Construction managers Are often involved Early in design to ensure project will Meet budget and time Requirements

Architects, Engineers and Construction Managers– Construction Drawings 3 Use both electronic and paper copies in the field

Construction Drawings 4

3D Computer Drawings for Design and Building 5 Used to determine cost, schedule, methods, impacts to environment.

6 Project Cost Schedule by Construction Managers

7 Project Schedule Developed by Construction Managers

Teams Assembly and Roles Assignment 8 Cost Estimator/ CM Responsible ensuring that the project is within the owner’s budget. Project Manager/ CM Responsible for ensuring project is built within construction time frame. Safety Director/ CM Responsible for the safety of the construction process. Architect Responsible for the aesthetics and usability of the building. Project Engineer/ CM Responsible for the stability and durability of the building. Five important roles in a construction project. These individuals work together throughout the project. Design Engineering Money Safety Time

You Have 20 Minutes 9 TASK A Meet with Client to learn about budget and time targets. Develop a building construction plan Choose one option for each construction/design activity (1-7) – Foundation, Main Layout, Exterior Closure, Interior, Roofing, Mechanical, Electrical Each option is marked with a color label indicating which “Important Role” should guide the decision. Tape the card for the option you select to your presentation board. Give to Time and Cost Team Members after they return from their meeting. TASK B Evaluate options selected by your Safety, Design, and Engineering Teammates. Add up total cost and time. Meet with Client to learn about budget and time targets. TASK C Can our building be built? Meet together as a group (all team members) to determine if it is possible to use the options you picked and remain within the budget and time constraints. What do you need to change to stay within the budget and time constraints? Design Engineering Money Safety Time

1.1 FOUNDATION - SOG Cost: $60K Duration: 10 days Slab-on-grade foundations are created by filling a mold set directly on the ground with concrete. This type of foundation rests directly on the surface of the site. On sandy soil this type of foundation might become unstable shifting with the loose sand. This type of foundation is easy and safe to construct because it doesn’t involve deep digging or construction at dangerous heights. 10 Engineering Safety

1.2 FOUNDATION – Raft Footing Cost: $70K Duration: 12 days A raft foundation is similar to a slab on grade foundation except that it has the added benefit of being dug deeper into the supporting soil. The added depth increases stability on loose soils, but increases safety risks as it involves the use of more heavy machinery. 11 Engineering Safety

1.3 FOUNDATION – Deep Foundation Cost: $100K Duration: 15 days This type of foundation has deep foundation walls to support the building above. This type of foundation prevents the back and forth movement of sand based soil better supporting the building. However, it is complex to construct requiring digging and construction at heights. Because it requires deep digging water may be encountered further complicating construction. 12 Engineering Safety

2-1 MAIN LAYOUT: Center Cost: $100K Duration: 16 days Boat Stacking and Common Area Mechanical Toilet Equipment Kitchen Office 13 Locating the boat/stacking + common area in the center of the building reduces the number of interior walls needed. Fewer interior walls to build equals reduced costs. Design

2-2 MAIN LAYOUT: Corner Cost: $120K Duration: 20 days Boat Stacking and Common Area Mechanical Toilet Equipment KitchenOffice 14 Locating the boat/stacking + common area off of the corner of the building requires construction of an extra hallway and partition wall next to the toilet area, resulting in increased costs. Design

3-1 EXTERIOR CLOSURE: CMU Cost: $80K Duration: 15 days CMU = Concrete Masonry Unit Concrete block, when reinforced with concrete columns and tie beams, is a very common building material for the exterior and interior load-bearing walls of buildings, and is often called "concrete block structure" (CBS) construction. Concrete block does not require the use of large cranes to lower materials into place. This allows workers to construct from stable scaffolding and avoid the risk of falls or having objects fall onto them. 15 Safety

3.2 EXTERIOR CLOSURE – Steel Frame Cost: $90K Duration: 12 days Steel Frame Construction consists of heavy steel members being lowered into place and welded to secure. This type of construction requires cranes to help lift materials into place and has a higher risk of construction injury due to materials falling. 16 Safety

3-3 EXTERIOR CLOSURE: Wood Frame Cost: $100K Duration: 10 days Wood frame construction consists of the securing of wood members with nails to create a stable wall, floor, and roof assembly. Unlike steel members which come to the site prefabricated. Wood walls, etc., have to be constructed onsite with the workers building at significant heights. 17 Safety

4.1 INTERIOR – Gypsum Wall Panels Cost: $50K Duration: 8 days 18 Engineering Safety Gypsum wall panels are used to cover the structural members and create finished interior walls. Gypsum panels are easy to cut into custom sizes but do not last as long as cement wall boards. They are easy to hang and have a low safety risk.

4.2 INTERIOR – Cement Board Cost: $35K Duration: 11 days 19 Engineering Safety Cement board wall panels are very durable but hard to trim. The process of trimming these boards can result in hazardous flying board chips and heavy cement dust.

5.1 ROOFING – Metal Decking Cost: $40K Duration: 7 days 20 Design Metal decking allows for the creation of large expansive flat roofs.

5.2 ROOFING – Concrete Beams/Slabs Cost: $64K Duration: 12 days 21 Design Concrete roof decks are excellent for large open flat roof areas that the designer wants to turn into a roof deck for mechanical systems and other uses such as decks.

5-3 ROOFING: Wood Trusses Cost: $84K Duration: 9 days 22 Design Wood trusses are excellent for creating large open spaces with soaring ceilings.

6-1 MECHANICAL – Exposed Ventilation Cost: $45K Duration: 6 days 23 Space ventilated by both natural and mechanical systems, resulting in reduced ventilation system costs and utility costs over the life of the building. Mechanical duct work is left exposed and may result in a cluttered ceiling appearance. Design

6-2 MECHANICAL: Enclosed Ventilation Cost: $52K Duration: 4 days 24 Ducts and ventilation system pieces are hidden in the wall structure. Ventilation is provided through hot and cool air pumped through ducts by a mechanical ventilation system. Windows are not used for ventilation. System provides a cleaner appearance in the space. Design

7-1 ELECTRICAL: Solar Power Photovoltaic Cost: $100K Duration: 8 days Solar power is also called photovoltaic power. This technology involves the application of solar cells to the building. These cells produce energy by converting sunlight, including sun ultra violet radiation, directly into electricity. This type of power is useful for buildings placed on sites were it is hard to connect up to the city power grid like a beach setting, but may be significantly more expensive. 25 Engineering

7-2 ELECTRICAL: Traditional System Cost: $50K Installation time: 3 days 26 Engineering Traditional electrical system connects building wiring up to the city power grid. City power is typically drawn from large power plants. This is a low maintenance choice because it doesn’t require upkeep of a on site power source.

You Have 20 Minutes 27 TASK A Meet with Client to learn about budget and time targets. Develop a building construction plan Choose one option for each construction/design activity (1-7) Each option is marked with a color label indicating which “Important Role” should guide the decision. Tape the card for the option you select to your presentation board. Give to Time and Cost Team Members after they return from their meeting. TASK B Evaluate options selected by your Safety, Design, and Engineering Teammates. Add up total cost and time. Meet with Client to learn about budget and time targets. TASK C Can our building be built? Meet together as a group (all team members) to determine if it is possible to use the options you picked and remain within the budget and time constraints. What do you need to change to stay within the budget and time constraints? Design Engineering Money Safety Time

You Have 20 Minutes 28 TASK A Meet with Client to learn about budget and time targets. Develop a building construction plan Choose one option for each construction/design activity (1-7) Each option is marked with a color label indicating which “Important Role” should guide the decision. Tape the card for the option you select to your presentation board. Give to Time and Cost Team Members after they return from their meeting. TASK B Evaluate options selected by your Safety, Design, and Engineering Teammates. Add up total cost and time. Meet with Client to learn about budget and time targets. TASK C Can our building be built? Meet together as a group (all team members) to determine if it is possible to use the options you picked and remain within the budget and time constraints. What do you need to change to stay within the budget and time constraints? Design Engineering Money Safety Time

Budget and Time Constraints Foundation 2. Main Layout 3. Exterior Enclosure 5. Roofing 4. Interior Construction 6. Mechanical 7. Electrical Maximum Budget for Building $410K Maximum Time for Construction of Building 58 Days

Discussion 30 Have a feel for what Construction Managers do? What type of jobs do Construction Managers have? What types of skills are needed for the Construction Manager?