INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.

Slides:



Advertisements
Similar presentations
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Advertisements

Common FUI Portal FUI IG Meeting Ofgem, 30 th September 2011.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
© OECD/IEA 2010 Energy Policies of the Czech Republic 2010 In-depth Review Energy Policies of the Czech Republic 2010 In-depth Review Prague, 7 October.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
© Copyright 2006 EFET The importance of common intra-day markets and balance settlement methods Hartmuth Fenn 2nd Northern Europe Electricity Miniforum.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Energy Agency of the Republic of Serbia
FUI Stakeholder Group 4 th July 2008 Congestion Management.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
RMC Regional Market Coordination RMC Regional Market Coordination RMC Regional Market Coordination CWE Capacity Allocation Service Company CASC Presentation.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
BritNed Investing in interconnection capacity Damian Bach France-UK-Ireland Stakeholder Group meeting 4 th July 2008, Sellindge, Kent.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
All Island Single Electricity Market IWFA Update Laura Brien
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
East West Interconnector Access Rules 11 th March 2011.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
FUI Stakeholder Meeting BritNed presentation Jan-Paul Dijckmans & Jonathan Maughan 4 November 2009.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
FUI Stakeholder Group 4 th November 2009 Congestion Management.
Market Coupling and Ways Forward Lene Sonne Vice President, Market
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Moyle & East West Access Rules Approval
Long-Term Auctions & Capacity FUI Coordination Proposals
Regulators’ update on Congestion Management and Balancing
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Unicorn Systems NL 20 November 2018 Miroslav Hašek, Managing Director.
Presentation transcript:

INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems

2 ▪ Copyright © 2009 Unicorn Systems AGENDA > Unicorn Systems & Damas > FUI Coordination > CEE Coordination > Vision for Integration > Q/A

3 ▪ Copyright © 2009 Unicorn Systems UNICORN SYSTEMS > Largest software house in the Czech Republic > 20 years of experience with ICT > 10 years of experience with TSOs > Market Management System (Damas) in 7 TSOs and ICOs > Coordinated auctions in CEE since 2005 (e-Trace) > Engaged in market coupling in CWE (ECP, EPP projects) > TSO Security Cooperation (11 TSOs, CTDS-System) > Strong technological background > 100+ team ready in TSO business domain

4 ▪ Copyright © 2009 Unicorn Systems DAMAS PLATFORM > Complex market management system for TSO / ICO > Comprehensive support of trading processes of TSO’s and other market players > Currently 6 installations in Europe in live operation > BritNed installation is being launched

5 ▪ Copyright © 2009 Unicorn Systems DAMAS IN FUI REGION > DC Interconnector UK – France (IFA) > Damas implementation for NGIL and RTE > Complex solution – system, infrastructure, hosting, support > Go-live 09/2009 > DC Interconnector UK – The Netherlands > Damas implementation for BritNed > DC Interconnector East – West and Moyle Interconnector > Damas implementation has started for EirGrid > Unification of rules on both interconnectors

6 ▪ Copyright © 2009 Unicorn Systems FUI COORDINATION > Coordination/harmonisation of capacity management on FUI interconnectors may bring advantages > Further integration necessary > Advantages of coordination > Same auction and settlement rules > Same auction products and timing > One portal for customer registration process and data publishing > Synchronized trades across more interconnectors (e.g. linked bids) > Publishing of market data aggregated for FUI region > Coordination will encourage trading and competition to the electricity market > Requested by EU requirements / initiatives

7 ▪ Copyright © 2009 Unicorn Systems CEE COORDINATION > Coordinated NTC-based capacity auctions and scheduling in CEE region > Multilateral coordination, harmonized rules > Linked bids, block bids > Central scheduling > Coordinated flow-based intraday market > Central credit management > Settlement, invoicing > e-Trace (Damas) > Common IT platform > Go-live 04/2005 > Central Alocation Office > Next steps: > Coordinated flow-based auctions > Source-sink scheduling > or Market Coupling

VISION FOR INTEGRATION

9 ▪ Copyright © 2009 Unicorn Systems POSSIBLE OPTIONS > Option 1 – Common Integrated Portal (CIP) > Each ICO has own IT solution > Full support of specifics on each IC > CIP used for unification and harmonization > Feasible and efficient in short- and mid-term perspective > Option 2 – One common auction system for FUI region > Promotion of one existing explicit auction systems or procurement of brand new system > Common auction rules expected > Independent auction office might be established

10 ▪ Copyright © 2009 Unicorn Systems RECOMMENDED SOLUTION

11 ▪ Copyright © 2009 Unicorn Systems COMMON INTEGRATED PORTAL

12 ▪ Copyright © 2009 Unicorn Systems COMPATIBILITY > Recommended solution compliant with EU legislature > EU Regulation 714/2009, EU Directive 2003/54/EC > Congestion Management Guidelines > Third Energy Package > Damas compatible with established industrial standards > ENTSO-E > ECAN v4r0, ESS v3r3, EPD,... > SO-SO Implementation Guide > Energy Data Exchange Standard > Unicorn is IT provider for the Energy Communication Platform (ECP) > Data reporting to ENTSO-E Transparency Platform

13 ▪ Copyright © 2009 Unicorn Systems FUTURE MARKET INTEGRATION > The aim of the EU commission is a single European market > Market coupling is a method for an efficient allocation of cross-border capacity > More efficient use of the power system in the region > Convergence or equalization of prices > Improvement of security of supply > Tight cooperation among TSOs and power exchanges > CIP can coexist and be compatible with FUI/NWe intergration and MC introduction

14 ▪ Copyright © 2009 Unicorn Systems TIMESCALES > First stage feasible in 4-6 months: > Depending on complexity > Unicorn‘s added value

Q/A

Copyright © 2009 Unicorn Systems