Experience with the commissioning and operation of the new CERN Digital LLRF family M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada,

Slides:



Advertisements
Similar presentations
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Advertisements

Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Feedback and Beam Control Section (FB) Activities and Highlights 2014 Outlook Wolfgang Hofle FB Section at 2014 RF Group Meeting - December
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
PSB DSP Based Low Level RF Operational Experience. April 2015 M.E. Angoletta, A. Blas, A. Butterworth, A. Findlay, S. Hancock, M. Jaussi, J.Molendijk,
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Project X Overview Dave McGinnis October 12, 2007.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
PSB Finemet upgrade: overview, preliminary results & planning LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada (RF/FB, RF/CS)
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
RF system & magnetic PU ELENA review meeting CERN, November 2015 M.E. Angoletta, S. Hancock, M. Haase, M. Jaussi, A. Jones, J. Molendijk, M. Paoluzzi,
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Coupled bunch instabilities in the CERN PS
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
CERN LEIR Low Level RF Maria Elena Angoletta AB/RF CERN, Geneva on behalf of the LEIR LLRF team Invited Talk 55 LLRF05: Workshop on Low Level RF CERN,
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
DLLRF: existing & possible applications M. E. Angoletta, M. Jaussi, J. Molendijk, J. Sanchez-Quesada CERN, BE/RF Finemet ® Review, September 2015.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Digital Receiver and Modulator Architecture for Multi-harmonic RF Finemet Operation 03/11/2015 LLRF15: Digital Receiver and Modulator Architecture for.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
RF acceleration and transverse damper systems
Challenges of Dual Harmonic RF Systems
PS status 10 August – 17 August 2017
Jorge Sánchez-Quesada BE-RF-FB
Alternative/complementary Possibilities
Injectors BLM system: PS Ring installation at EYETS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Longitudinal beam parameters and stability
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
The ELENA BPM System. Status and Plans.
Acknowledgments: LIU-PT members and deputies, H. Bartosik
PSB rf manipulations PSB cavities
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
PSB Injection scheme in the Linac 4 era
New AD Production Beam in the PSB
Beam dynamics requirements after LS2
DEMONSTRATION OF TRIPLE BUNCH SPLITTING IN THE CERN PS
PSB magnetic cycle 900 ms MeV to 2 GeV
Maria ELENA Angoletta for the RF team
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Experience with the commissioning and operation of the new CERN Digital LLRF family M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada, J. Simonin (CERN), C. Schmitzer‎ (MedAustron) LLRF Workshop, Shanghai, 3-6 November 2015

Outline 1.DLLRF overview 2.PSB LLRF commissioning & operation 3.PSB Finemet ® tests and planning 4.MedAustron and medical machines 5.Conclusions & outlook Additional slides

DLLRF overview  It is the 2 nd generation Digital LLRF family for CERN’s small machines (Meyrin site) →  Developed within the framework of the LHC injector upgrade project (→ symbol), will apply to non LHC injectors, too.  Hardware/firmware mostly described by J. (Lake Tahoe). →  In 2014 it was successfully deployed at CERN’s PSB (4 rings) and on the medical machine MedAustron → next sections. →  Used by RF group for LLRF + diagnostics (future ELENA machine). Adopted by CERN Beam Instrumentation (BI) group for orbit, Schottky & intensity measurement systems. (→ additional slides.) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 1

H /w family: roadmap to other CERN machines WhenWhatGroup 2015 LEIR DLLRF upgradeRF Discussions about possible PS LLRF upgrade.RF 2016 AD orbit systemBI ELENA LLRF + long. diagnostics from magnetic PUs (baseline) RF ELENA orbit systemBI ELENA long. diagnostics from distributed TPU (study)BI LEIR Schottky systemBI 2017 (?)LEIR orbit (if approved)BI >= 2017AD LLRF + long. diagnostics (when manpower allows)RF Isolde LLRF (it might not take place)RF >= LS2PSB operation with Finemet ® HLRFRF M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 2

Main characteristics of current implementation  Direct RF sampling, baseband I,Q processing  Double-tagged clock for system-wide phase synchronisation. Can be distributed over fiber.  Modular:  System clocked proportionally to f REV (tracking) with “gear change” (i.e. change of MDDS harmonic) to cope with large frequency swing. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 3 NB: this might change as we’re considering going to a fixed clocking scheme (future improvement when manpower allows).  VXS crate, fast intercomms between boards  3 types of daughtercards (functionally: MDDS, DDC, SDDS) in FMC format. Two can be hosted on a FMC-carrier board.  2 FPGAs (Main + FMC) + 1 DSP hosted on FMC carrier board.  Several boards typically interacts to make a LLRF system.

Outline 1.DLLRF overview 2.PSB LLRF commissioning & operation 3.PSB Finemet tests and planning 4.MedAustron and medical machines 5.Conclusions & outlook Additional slides

PSB overview: the machine  Proton accelerator, LHC injector + experimental areas. 4 rings superimposed. Cycle duration: 1.2 s  Varied RF gymnastics & cavities combinations  Varied intensities (10 9 to per ring)  Upgrades after Long Shutdown 2 (LS2): Current PSB cycle parameters. PSB machine schematic view  Injection from Linac4 (T E = 160 MeV, f REV,I = 1 MHz)  2GeV (f REV,E ~ 1.82 MHz) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 4

PSB overview: beams and DLLRF  One DLLRF system per ring (independent). → Additional slides for LLRF operation during typical PSB cycle  DLLRF sampling period = 10 µs (baseband processing).  “Ring 0” LLRF: additional DLLRF system connected to PSB Ring 4.  Controls Ring 4 beam in PPM with Ring 4 DLLRF.  Used to validate new implementations and for machine studies.  Used for Finemet ® R&D in (→ see part 3 of this talk). M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 5

PSB HLRF ferrite layout and characteristics DLLRF R = 25 m C04 (all rings) C16 (all rings) C02 (R2+R4) C02 (R1+R3) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 6

PSB LLRF picture Ring 0 Ring 4 Ring 3 Ring 2 Ring 1 M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 7

PSB LLRF operational layout (one ring) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 8

PSB DLLRF commissioning & operation  PSB restarted after 15 months shutdown on June 2 nd 2014 with DLLRF as THE operational LLRF.  LLRF team worked 7/7 for 3 weeks to commission the system.  Beam captured, accelerated (phase + radial loop) & synchronised on Ring 3 by Thu June 5 th. All rings setup (h =1, basic integration in controls infrastructure) by Sun June 8 th.  More beams and features commissioned during the summer (ex: splitting in August 2014). M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 9

PSB DLLRF commissioning & operation– cont’d  Lack of manpower: integration in controls infrastructure lag behind actual implementation in low-level part. “the beam never lies”  Sometimes malfunctioning after system firmware update (“the beam never lies”). If problem cannot be solved quickly, we revert to previous version (< 30 min operation).  Operators can setup the LLRF & optimise beams: overall very satisfied.  System flexibility triggered new functional requirements (ex: C16 blowup) that will be deployed soon. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 10  DLLRF reliability:  DLLRF rings 1-4 operate successfully 24/7 since June 2014 (excluded Christmas stop, 15 Dec 2014 – 2 Feb 2015).  July 2015: problem on ring 4 DLLRF (giga-bit links h/w fault on a board). Degradation over time, difficult to point clearly to LLRF as culprit. 2 days downtime for DLLRF ring 4, could be replaced by DLLRF Ring 0 → no downtime to machine due to LLRF.  Short-term malfunctioning due to loose/broken cables (bad quality in stores).

Performance with respect to previous LLRF Fully PPM, all settings can be archived & copied between rings/users. Shot to shot reproducibility greatly improved Drifts in parameters requiring adjustment all but eliminated (was daily intervention with previous LLRF). Synchro at extraction much more reproducible and smooth. A huge number of signals are available on CERN standard signal observation system (virtual scopes and samplers). Beam blowup with C16 more flexible & powerful (→ additional slides), less voltage needed. A big investment but it has paid off. Training:  LLRF stand-by service people still to be fully trained on new system  Operators: basic training done, enough for simple setting up, signal observation and debugging. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 11

Future work on the PSB operational system  Integration with the new interlock system  Rings synchronisation at injection M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 12 Short-term (2016) Medium term (depends on manpower)  New requirements to be developed & deployed after the Xmas technical stop.  New interface with the Btrain (white rabbit-based) to be deployed and tested in  Preparation for Linac4 injection:  Improved FPGA-DSP data transfer using DMA.  Clocking scheme implemented with fixed sampling clock Long long term: 3rd generation LLRF. Ex: FPGA with embedded processor (Xilinx ZYNQ SoC FPGA family to replace Main FPGA + DSP).

Beam results:  Bunch to bucket. transfer to PS machine  Several algorithms available & switchable in PPM fashion.  Typically: frequency steering to beating frequency (100 Hz) then synchro phase loop closed.  Excellent synchro quality. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 13 Beam extracted Beam-to-extraction reference phase, after reaching the beating frequency. Green trace: new algorithm White trace: previous algorithm Synchro phase loop closed Waterfall plot of the last 35 ms before extraction (new algorithm implementation). The synchro phase loop closure causes no disturbance to the beam.

Beam examples: hollow bunches (studies) Hollow bunch in the PSB towards the end of acceleration. Picture & MDs from A. Oeftiger & S. Hancock  Hollow (flat-topped) bunches generated in the PSB to gain space charge margin by reducing the bunch peak current.  Important for the PS (i.e. next machine) which has transverse space charge limitations at injection for the beams foreseen for HL-LHC.  Generated via beam phase loop modulation to shake particles out of centre. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 14  C16 blowup to smooth-up distribution.

Outline 1.DLLRF overview 2.PSB LLRF commissioning & operation 3.PSB Finemet ® tests and planning 4.MedAustron and medical machines 5.Conclusions & outlook Additional slides

Finemet ® studies in PSB  Reliability run  Operation as h=1, h=2, h=1+2. Beam blowup as C16 (h=10).  Simulations to study longitudinal emittance and future beams. Extensive MD plan carried out in  Aim: validate replacement of ferrite-based HLRF with Finemet ® -based.  10 Finemet ® cells (7 kV) installed in PSB Ring 4 → J. Molendijk’s talk “Digital Receiver & Modulator Architecture for Multi-harmonic RF Finemet Operation”, this workshop.  Simulations showed Finemet ® validity also for higher-intensity beams.  International review (September 2015). Outcome: after LS2 Finemet ® will replace ALL PSB ferrite-based systems (C02/C04/ C16). M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 15 NB: no way back (ferrite cavities will be removed)

Future PSB HLRF layout  Finemet will be in sections now allocated to C02 and C04.  Multi-harmonic operation until ~ h = 18  Total voltage available: 24 kV Finemet ® M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 16

DLLRF - Finemet ® operation in  Feedback loops (I/Q coordinates) in LLRF to compensate beam loading.  Currently operational harmonics h=1,2,3,5. Four additional harmonics under commissioning.  h=1 & h=2 controlled with voltage programs. Phase also controlled by phase function and rotations.  All other harmonics servoed to 0 V.  Operation of Finemet ® as C16 (beam blowup) validated as well.  Protection against HLRF overdrive.  DLLRF controls gap relay in PPM. Gap open Gap closed Intensity [E10] B field [G]  Ring 0 DLLRF controls Finemet HLRF in PPM with normal operation. → additional slides for Ring0 DLLRF layout. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 17

Operation experience  DLLRF ring 0 operated ISOLDE beam reliability run (July 2015 onwards), LHC-type beams & several MD cycles.  Flexible and powerful system, integrated in controls infrastructure.  LEIR (since 2005) and MedAustron experience with Finemet ® control helped the development. Also, useful previous tests (2012) with LEIR-style hardware to control Finemet ® in the PSB.  Operators can switch between Ring 4 DLLRF (ferrite HLRF only) and Ring 0 DLLRF (ferrite + Finemet ® ) autonomously. They can also switch ON/OFF Finemet HLRF.  Beam performances (beam intensity & characteristics) similar to what is obtained with ferrite cavities. → Additional slides for beam and servoloop results. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 18

Results: beam loading suppression Servoloops OFF. 920E10 protons extracted.Servoloops ON. 960E10 protons extracted.  Finemet ® as h=1 with/without 1,2,3,5 for ISOLDE.  h=1 servoed to 7.2 kV; other harmonics servoed to 0.  > 900 E10 protons accelerated in both cases → strong beam loading. Vertical scale for h=2,3,5: 10 V/div Vertical scale for h=2,3,5: 200 V/div B field M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 19

Servoloop future improvements  Several improvements already planned  Servoloops implemented in FPGA to obtain lower group delay + larger BW (target BW = 80 kHz).  Additional harmonics. The final solution will use multi-harmonic LO sources scheme → J. Molendijk’s talk “Digital Receiver and Modulator Architecture for Multi-harmonic RF Finemet Operation”, this workshop  Feedforward compensation table of Finemet ® transfer function to increase phase margin (hence available gain).  Now we’re running with only four, non-optimised cavity servoloops (8 kHz single-sided BW, ~36 dB loop gain) …and still performance with beam is satisfactory ! 960E10 protons accelerated with Finemet as h=1 Intensity [E10] Bfield [G] M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 20

Outline 1.DLLRF overview 2.PSB LLRF commissioning & operation 3.PSB Finemet tests and planning 4.MedAustron and medical machines 5.Conclusions & outlook Additional slides

MedAustron (MA): the synchrotron  Ion-therapy & research centre in Wiener-Neustadt (Austria)  Proton & Carbon ion therapy, clinical + non-clinical research  Treatment of first patient expected in → Additional slides for currently achieved milestones.  Protons: ≤ 1 · / pulse  Carbon ions : ≤ 4 · 10 8 / pulse  Rep. rate: 0.5 s)  Synchrotron circumference = m MedAustron synchrotron parameters. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 21

M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 22  Collaboration with CERN on both HLRF (Finemet ® ) and LLRF.  MA LLRF:  CERN experts have contributed to the definition of the LLRF functional specs and controls integration.  Common development: MedAustron staff contributed to the system development and hardware tests.  2008 – 2013: (some) MA staff (offices + labs).  Same h/w and similar firmware + s/w as for PSB DLLRF.  → See spare slides for MA LLRF layout.  H/w modules designed specifically by CERN specialists for MA LLRF: Btrain + Tune Kicker interfacing.  Collaboration now completed. CERN - MedAustron collaboration

MA LLRF validation & commissioning M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 23  MA control system targeted at operation, not commissioning: some parameters were not meant to be changed.  Btrain system did not work, hence pre-calculated B-train played with the LLRF embedded function generator was used.  Rapid turnover of MA staff (especially controls integration specialists) slowed down system integration. Knowledge transferred is then lost!  Not yet finalised full system documentation from CERN (manpower limitation).  Other technical “teething troubles” …  Initial & partial system validation done on the MedAustron Finemet ®  LLRF team travelled to Austria several times for in-situ intervention.  Remote sessions carried out from CERN on MA LLRF system, with the collaboration and agreement of MA staff.  Initial slow because:

MA LLRF validation & commissioning – cont’d M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 24  Processing share between DSP and FPGA very useful, especially for future system upgrade (if required)  Many features developed for the PSB or for lab development very useful for MA, too. For instance:  Btrain generation from FPGA algorithm OR from embedded function.  Fixed frequency operation before moving to standard Btrain-driven frequency program.  FPGA: comms, function generation, housekeeping. It does not change once finalised and debugged.  DSP (C language): beam & cavity loops. Can be customised by MA staff.  For some beam results → additional slides

Medical machines & CERN Knowledge Transfer (KT)  CERN Knowledge Transfer: CERN’s technical expertise & innovative technologies are available for scientific/commercial purposes through various technology transfer opportunities →  : collaboration with CNAO (Centro Nazionale for Adronterapia, Pavia, Italy)  : collaboration with MA (design/development/commissioning of MA LLRF) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 25  CERN can provide the existing LLRF technology that was developed in common with MA, independently of MedAustron.  Future medical machines very much interested in Finemet HLRF.  LLRF needed, too!  Experience in LLRF for medical RF group :  Finemet ® -based HLRF companion (but could work with other HLRF, too).  In 2016 CERN RF group will apply for a KT project funding to develop a simplified & optimised DLLRF for medical accelerators.

Conclusions and outlook  A new DLLRF family for small machines  Very flexible and powerful, will be used also for diagnostics by RF+BI.  DLLRF successfully commissioned in 4 rings of PSB. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 26  DLLRF essential to operate PSB Finemet ® HLRF. Successful MDs have lead to decision of replacing all ferrite cavities in the PSB with Finemet ® ones.  DLLRF successfully commissioned in medical synchrotron MedAustron.  Experience with medical machines within CERN RF group.  CERN will make available to medical machines existing DLLRF and possibly (depending on KT funding) a new simplified&optimised version. Very aggressive planning for the next years + limited manpowerBUT great enthusiasm, interest for new developments & team spirit will grant successful deployment(s).

Additional slides M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

PSB-style DLLRF: not only LLRF applications!  Evolution of LEIR DLLRF (1 st generation), deployed in  H/w family aimed at LLRF applications for Meyrin synchrotrons  Project started in  Includes LHC experience.  PSB-style DLLRF is 2 nd generation DLLRF system.  Modular & flexible system: initially aimed at LLRF only, it has been adopted by BI for diagnostics applications. Ex: AD orbit, to be deployed in early M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

ELENA: the (future) decelerator ELENA ring parametersELENA location within the AD ring AD ring ELENA ring ELENA cycle – qualitative view  Further decelerates AD pbars.  To be constructed in AD hall.  Ring commissioning:  Connection to AD + beam physics: M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

ELENA: the (future) decelerator ELENA layout  RF workpackage includes:  LLRF: new DLLRF family. Frequency program, beam phase/radial loops. Injection & extraction synchronisation loops. Cavity servoloop. Multi-harmonic system.  HLRF: Finemet based, max Vp = 500 V. Operational: 25 mV to 100 V.  Longitudinal diagnostics (ultra-low-noise beam transformer + processing) LLRF Finemet cavity Ring beam transformer (HF + LF) Extraction line beam transformers (LF) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

ELENA: LLRF + long. diag. system (baseline) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

Longitudinal bunched processing  Intensity from Fourier analysis of RF harmonics (AD-style method). Bunch-shape dependence. New bunched-beam digital signal processing.  New method will integrate over bunch shape & subtract the baseline. RF: ELENA longitudinal diagnostics processing Bunched beam Bunched beam: intensity Debunched beam Debunched beam: intensity, dp/p and from Schottky signals analysis Debunched beam processing  Windowing & FFT averaging. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

BI: ELENA orbit + long. diag. system (study) Beam orbit and distributed electrostatic PU system for longitudinal parameters measurement.  Innovative idea: add Σ signal from orbit transverse PUs to obtain a wide-BW distributed electrostatic PU.  Digital acquisition + processing with LLRF h/w.  Risk of head ampli saturation + very innovative processing: not baseline system for ELENA (… yet, but it could become such in the future). M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

PSB: typical LLRF cycle operation Actionctime Beam capture (Bdot ≠0)275 Phase loop ON275.5 Radial loop ON276 Bunch splitting(if required)765 Extr. synchro loop ON780 C04 phase servoingall cycles C16 long. blowup (ffwd) ~200 ms window (1) (1) (2)(2) (3)(3) (4) (4) (5) (5) M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 2

PSB: C16 beam blowup M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

PSB Ring 0 LLRF layout ( ) Under commissioning Servoloops at h =1,2,3,5 currently operational

M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 Results: cavity servoloop step response Red trace: voltage reference for h=1 Yellow trace: detected  Step f REV (0.5 MHz, 1 MHz, 1.5 MHz) for various step amplitudes and PID gains.  Measured loop BW ~ 8 kHz for gain used in operation.  More servoloop results → additional slides Response to a 1 kV step in voltage reference for h=1 and fixed f REV = 1 MHz. Green trace: Finemet ® driving signal from DLLRF 2 sampling periods delay

M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 Results: cavity servoloop normalised response  Fixed f REV : 0.5 MHz, 1 MHz, 1.5 MHz. Servoloop harmonics: 1,2,3,5.  Network analyser (NA) excites the HLRF by sweeping the band around each considered harmonic.  Gap return input to NA and transfer function measured.  Servoloop PID settings are those used operationally. ~ -36 dB reduction in cavity impedance (system gain) 3 dB BW: ~ 16 kHz (double sided) Non-optimum phase margin

M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15 PSB Finemet results: Finemet as h=1+2  ISOLDE beams operationally have the maximum intensity available, hence generate the maximum beam loading in the cavities.  Voltages: 3.5 kV on both harmonics of the Finemet®, 4.5 kV on both C02 & C04 and 0.6kV on C16.  We ramp Finemet® H=2 down to zero on the extraction FT but keep 2.5kV on C04 to stop it from dropping out.  It was possible to get E10 accelerated and to get similar longitudinal to the operational beam.

PSB Finemet results: beam loading suppression < 60 V detected with servoloops h=1,3,5. Error on Finemet ® shaping voltage < 80 VFinemet driving signal Finemet ® detected voltage  Finemet ® as h=2 with servoloops ON as used operationally for ISOLDE reliability run. Typical beam intensities ≥ 800 E10 protons. M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15

MedAustron main milestones (so far)  26 May ‘14: first capture  20 Oct ‘14: first extraction to MeV  6 Nov ‘14: 10E8 protons extracted to MeV  4 August 2015: phase jump extraction scheme successfully validated MedAustron synchrotron Irradiation Room 3 (IR3) MedAustron complex

MA LLRF system layout M. E. Angoletta “Commissioning & operation of the new CERN DLLRF family” LLRF15