Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.

Slides:



Advertisements
Similar presentations
City of Oakland: Road Diet Experience
Advertisements

There is traffic lights about 150 feet from this intersection. When this light is Red, the traffic backs up and blocks the intersection on Darwell Ave.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
CHARLENE FITZGERALD APRIL 3, 2012 ROADS AND STREETS Yuma Metropolitan Planning Organization.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
April 6, 2015 I-4 Ultimate Project Overview. Agenda Overview of I-4 Ultimate How to stay informed Studies and communication Responses to questions provided.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk.
Noise analysis- operations 6 ft. panel on west side of guide way 4 ft. panel on east side of guide way.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
Metro Gold Line Eastside Extension Four Quadrant Gate Feasibility Study Summary.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
South Bellevue Operational Noise Mitigation Types of barriersTypes of barriers Heights and locations Heights and locations City of Bellevue Light Rail.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
McKellar Park Information Session
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Exposition Light Rail Phase 2 - Recommendation for Alternative Siting of Maintenance Facility within the City of Santa Monica.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Indian Hill Grade Separation City Council Meeting February 23, 2016.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Environmental Impact Report (EIR) Update May 2, 2016.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Public Conference December
Joint Police & Streets Committee
Providence Saint John’s Health Center Phase II Project
Light Rail Enhancement Project
CFT Gateway Center ( E. Foothill Blvd
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Board of Trustees Meeting
Southwest LRT METRO Green Line Extension
City Council Meeting July 23, 2018
Draft Fiscal Year Bus Service Plan
Presentation transcript:

Indian Hill Boulevard Grade Separation Proposal, January 25, 2016

Proposal – Grade Separate Indian Hill To improve the project for the long-term, the Foothill Gold Line Construction Authority is discussing an option to grade-separate Gold Line trains over Indian Hill Blvd., rather than build the crossing at street level (at-grade) as currently approved –The Construction Authority is seeking input from the City of Claremont on this option, which would be further reviewed as part of an addendum to the certified Final Environmental Impact Report and considered for inclusion in the cost of the overall project budget

Proposal – Grade Separate Indian Hill If approved for inclusion in the cost of the overall project budget by the Construction Authority board of directors, the cost to design and build a grade-separated crossing would be paid for by the Construction Authority as part of the Foothill Gold Line project –The Construction Authority will work closely with the City of Claremont on the architectural and aesthetic design for the bridge and abutment walls (Photo: Santa Anita Ave Grade Separation, Arcadia)

Indian Hill Blvd Gate-Down Time Metrolink and freight trains cross Indian Hill Blvd at street level, and will continue to do so even after the Gold Line trains begin operating: –Currently, Metrolink trains cross Indian Hill Blvd. on average every 15 minutes during peak periods and twice an hour during off-peak periods –Freight trains cross Indian Hill Blvd twice a day (once in each direction) –Each time a Metrolink or freight train crosses Indian Hill Blvd, the gates are down for several minutes If built at-grade, Gold Line trains would add minutes of gate-down time every hour on Indian Hill. (Note: This gate-down time is at 10-minute headways. Cumulative gate-down time would increase if Metro increases train frequency in the future)

Benefits of a Separated Crossing Traffic: A grade-separated crossing will allow Gold Line trains to cross Indian Hill Blvd. without the need to stop traffic: –If built as currently approved, the gate-down time for the Gold Line trains would be about minutes every hour, causing about a minute delay for traffic each time a train crosses (cumulative gate down time would increase if train frequency increases in the future) –The Gold Line gate-down time would be in addition to that experienced with Metrolink and freight trains Noise: A grade-separated crossing would not require bells and lights to be activated when a Gold Line train is approaching, reducing potential noise from those warning devices for residential and business neighbors of the intersection

Benefits of a Separated Crossing (cont.) Direct Access to Station from College Ave: A grade-separated crossing would require the Gold Line Station to be moved closer to College Avenue, allowing direct access to the station from both Harvard Avenue and College Avenue Visual: Effects from the station to the plaza of the city’s historic Santa Fe depot would likely be reduced (Approx. station location, with grade separation at Indian Hill Blvd.)

Impacts of a Grade Separated Crossing Short-Term Construction Impacts: Building a grade-separated crossing will likely have short-term construction impacts beyond what would occur for an at-grade crossing Visual/Aesthetic: The visual look of the area would be permanently changed, and some views may be diminished due to the anticipated height of the structure and abutment walls (approximately 30 feet at the tallest). New shadows will be created - In coordination with the city, all potential impacts will be evaluated as part of an addendum to the certified Final Environmental Impact Report

Design to be Decided with City –A grade-separated structure would be approximately 25 feet tall from the ground to the top of rail, providing at least 16.5 feet of clearance under the bridge –Abutment walls, on either side of Indian Hill Blvd., would be built to support the structure. The walls would start approximately 900 feet to the west of Indian Hill Blvd. and 700 feet to the east, gradually getting taller as the walls approach the bridge –At their tallest, the abutment walls will be approximately 30 feet tall If approved, the bridge structure and its associated abutment walls will be concrete, allowing for flexibility of design The Construction Authority will work closely with the city on the aesthetic and architectural design for the bridge and walls:

3-D Visualization – looking south on Indian Hill This is a visualization of the bridge concept, and does not represent a final design

3-D Visualization – looking North on Indian Hill This is a visualization of the bridge concept, and does not represent a final design

Decision-Making Process The Construction Authority board of directors is the decision-making body and is looking for input from the Claremont City Council –If the council decides in favor of the grade-separated crossing, the Construction Authority will evaluate the project change using an addendum to the Final EIR in the next few months and will consider including the overall cost into the project budget –If the council decides against the grade-separated crossing, the project will be designed and built as currently approved; no additional analysis is needed

Example: Santa Anita Ave Grade Separation

Stay Connected: foothillgoldline.org iwillride.org