Design-Build Construction Phase 4 Parking Structure VA Medical Center - San Juan, PR Solicitation #VA 101-11-RP-0132 Project No. 672-085-D Pre-Proposal.

Slides:



Advertisements
Similar presentations
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Advertisements

Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/Contract Number – IFB FQ13092/ER September 3, :00 PM JGB 4B-01 Purchase.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Marcy Mealy Procurement Specialist CDBG Program
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Pre-Proposal Conference
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
Occupational Safety, Industrial Hygiene and Medical Services; Pre-Solicitation Conference NNA J-SJC October 6, 2004.
Welcome to the Johnson Space Center Financial and Business Management Services Virtual Industry Day 1.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Jeffrey B. Birch, Acting Director Equal Employment Opportunity Responsibilities of Federal Procurement Officers: An Update 2015, February 18.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
US Army Corps of Engineers BUILDING STRONG ® Networking & Teaming Conference Fort Bliss Replacement Hospital Projects Jim Bales & John Rodgers Fort Worth.
Pre-Proposal Conference NASA Langley Research Center October 26, 2009.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
“Reading Solicitations” Florida SBDC at FGCU Helping Businesses Grow & Succeed “Doing Business with the Government” State Designated as Florida’s Principal.
International Space Station (ISS) Mission and Program Integration Contract (MAPI) White Paper December 20, 2011.
UPGRADE RUNWAY & ELECTRICAL VAULT PRE-PROPOSAL CONFERENCE 12 July WG/LGC SELFRIDGE ANG BASE MI.
Business Inclusion and Development Program Overview Business Development and Procurement Services Budget, Finance and Audit Committee Monday October 5,
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
Submitting a Quality Offer On the GSA Language Schedule GSA Federal Supply Service.
Technical Services for Aerospace Systems Modeling and Simulation Pre-Proposal Conference/Site Visit RFP DXG.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
PRE-SOLICITATION CONFERENCE FOR FRACTIONAL AIRCRAFT OWNERSHIP DEMONSTRATION PROGRAM DECEMBER 18, 2001 DRFQ
Environmental Services Pre-Solicitation Conference NNA J-WLT April 23, 2004.
Washington Street Boat Landing Pergola Restoration Design-Build Project Design-Build RFQ – Pre-Submittal Meeting Jeff Lundstrom, SDOT Project Manager February.
PreProposal Conference VA R-0123 Project # J Research and Veterinary Medical Unit (VMU) VA Palo Alto Health Care System Palo Alto, CA.
IAS Pre-proposal Conference NOVEMBER 2, 2011 Pre-proposal Conference NOVEMBER 2, 2011 Tahoma NATIONAL CEMETERY PHASE 2 DEVELOPMENT KENT, WASHINGTON Project.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
PreProposal Conference Building 209 Seismic Upgrade and Renovations VA Greater Los Angeles Healthcare System, West Los Angeles Medical Center, Los Angeles,
PreProposal Conference V R-0153 Welcome Office of Construction/Facilities Management (CFM) Acquisition Support Western Region Vallejo, CA Contracting.
IAS Pre-proposal Conference December 10, 2012 Pre-proposal Conference December 10, 2012 San Antonio bldg 1 & 4 Renovation san antonio, tx Project no: San.
October 2, 2015 REQUEST FOR PROPOSAL (RFP) 7012 ADMINISTRATIVE SERVICES ORGANIZATION COUNTY OF SAN DIEGO, HEALTH AND HUMAN SERVICES AGENCY PRE-PROPOSAL.
Federal Acquisition Service U.S. General Services Administration Area Facility Operation Specialist (aFOS) 88 th Regional Support Command Pre-Bid Meeting.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Department of Veterans Affairs Network Contracting Office (NCO) 21 Repair Building 1A Data Cables Pre-Proposal Conference and Site Walk Construction Request.
PRE-PROPOSAL CONFERENCE COMMUNITY LIVING CENTER CULTURE AND SAFETY IMPROVEMENTS VA R-0961 PROJECT: 654-CA-317 MAGNITUDE: $5 - $10 Mil 8/27/2012.
Vera Konstantinova, Procurement Contracting Officer September 8, 2015 REQUEST FOR PROPOSAL (RFP) 7045 INDEPENDENT LIVING ASSOCIATION PROJECT COUNTY OF.
Vera Konstantinova, Procurement Contracting Officer July 16, 2015 REQUEST FOR PROPOSAL (RFP) 6922 IN-HOME OUTREACH TEAMS AND ASSISTED OUTPATIENT TREATMENT.
Pre-Proposal Conference VA R-0059A Building 101 Mental Health Services – Phase 1, Parking Structure and Main Entry Drive VA Puget Sound Healthcare.
Pre-Proposal Conference VA R-0053 Correction of Seismic Deficiencies B100 Nursing Tower and Community Living Center VA Puget Sound Healthcare System,
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Procurement & Strategic Sourcing
Pre-Proposal Conference for three separate solicitations
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Skyway Insight© Webinar
REPAIR FALL PROTECTION PROJECT
Procurement & Strategic Sourcing Charter Bus Transportation Services
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Procurement & Strategic Sourcing
Washington Metropolitan Area Transit Authority (WMATA)
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Washington Metropolitan Area Transit Authority (WMATA)
Procurement & Strategic Sourcing
Presentation transcript:

Design-Build Construction Phase 4 Parking Structure VA Medical Center - San Juan, PR Solicitation #VA RP-0132 Project No D Pre-Proposal Conference October 19, 2011

Agenda u Opening Remarks u New Acquisition – RFP VA RP-0132 u Submission Requirements u Milestones u Project Scope & Overview u Questions & Answer Session u Site Visit

Pre-Proposal Conference INTRODUCTIONS u VA Representatives - VA CFM – Diane Campbell, Contracting Officer - VA CFM – William Picking, Jr., Project Executive u Architect of Record - N.K. Bhandari, Architecture & Engineering, P.C. – James Resig, P.E.

Pre-Proposal Conference Our discussion of each section shown on the agenda will be brief and generally will highlight those areas of importance as you prepare for your offer. I would like to make clear that anything said should not be interpreted as a change to the solicitation/contract documents as posted. If a statement is made that is inconsistent with the solicitation requirements, you should not submit your proposal based on the statements. Submit based on the posted/written solicitation and all amendments.

Pre-Proposal Conference NEW ACQUISITION REQUIREMENTS VA RP Pre-Solicitation Notice - September 13, RFP ( 100% Small Business Set-Aside) – September 28, 2011 Federal, State and Local Taxes (FAR Clause ) - Is the Responsibility of the Contractor Amendment 1 issued 10/10/2011 Amendment 2 will be issued following today’s meeting to include updated RFI Log and Presentation Slides and Sign-In Sheets

NEW ACQUISITION REQUIREMENTS CLIN BASE BID ITEM 1 - GENERAL CONSTRUCTION CLIN BASE BID ITEM 2 - PHYSICAL SECURITY CLIN ADD ALTERNATE #1 - ADD SUICIDE DETERRENT GRILLES IN ALL OPENINGS CLIN ADD ALTERNATE #2 - PHOTO VOLTAIC ARRAY CLIN ADD ALTERNATE #3 - VEGETATED “GREEN” WALLS CLIN ADD ALTERNATE #4 - SUICIDE DETERRENT GRILLES AND STAINLESS STEEL MESH SCREENING CLIN ADD ALTERNATE #5 - PARKING SPACE COUNTERS: GENERAL AT ALL LEVELS AND ACCESSIBLE SPACES AT LEVELS 1 AND 4 CLIN ADD ALTERNATE #6 - ELEVATORS 1 & 2 Pre-Proposal Conference

NEW ACQUISITION REQUIREMENTS Cost Range - Between $20,000,000 - $50,000,000 RFP Due Date - November 15, 2011 Bid Bond / Bid Guarantee (SF24) - 20 percent of the offer price but shall not exceed $3,000,000

Pre-Proposal Conference NEW ACQUISITION REQUIREMENTS Annual Representation and Certification - At Central Contractor Registration (CCR) - At - Must be in CCR prior to award Davis Bacon Act (Applies) Buy American Act (Applies)

Pre-Proposal Conference NEW ACQUISITION REQUIREMENTS Completion Time Calendar Days after Notice to Proceed Bonds (within 10 calendar days after award) Liquidated Damages - $1,950 each calendar day of delay OSHA & VA Requirement (Construction Safety Course) - Competent Person (supervisor) 30 hours - All other employees 10 hours

Pre-Proposal Conference NEW ACQUISITION REQUIREMENTS Insurance - General Liability required prior to commencing work Questions & Answers (RFS’s) - Questions Due: October 27, Answers Due: November 3, Diane Campbell at Copy William Picking, Jr. at and James Resig at - The subject line to read “VA San Juan Parking Structure Phase 4

Pre-Proposal Conference NEW ACQUISITION REQUIREMENTS Office of Small and Disadvantaged Business Utilization (OSDBU) Washington, DC - POC – Mark Taylor

Pre-Proposal Conference  This procurement is a 100% Set-Aside for Small Business competition.  A public bid opening will not occur. This is a request for proposals and not a sealed bid.  LIMITATIONS ON SUBCONTRACTING (DEC 1996) : Performance of work by the prime contractor is at least 15%.  Commence work within 10 days of the Notice to Proceed.

Tentative Schedule Request for proposal issuedSeptember 28, 2011 Pre-proposal conferenceOctober 19, 2011 Proposal submittedNovember 15, 2011 Contract awardJanuary 25, 2012 Notice to proceedFebruary 25, 2012 Construction completion/final inspection/ custody receipt TBD (485 Calendar Days from NTP) All Dates are estimates only and subject to change.

Pre-Proposal Conference Proposals shall be in two parts: (1) Technical proposals - Significantly more important than cost. - will consist of three factors (listed in descending order of importance): 1. Past Performance 2. Construction Management: 3. Schedule

Pre-Proposal Conference (2) Cost proposals Volume II shall consist of the signed SF-1442, Price (continuation price page 4) acknowledgment of amendments, Representations and Certifications, and bid guarantee. Cost Proposal will be reviewed for its acceptability and price reasonableness. VA may award without discussions. Provide your best technical and cost proposals for the initial submission because VA may award without discussion.

Pre-Proposal Conference Review Clauses and Provisions: Clauses apply to post-award actions and Provisions apply to Pre-award actions. Proposal Deliver Date and Time: November 15, 2011 at 2:00 EST, unless date and time are changed by amendment. Proposal deliver location is specified within the solicitation. Please sign all amendment forms and acknowledge the amendments on the bid. Check at for amendments BEFORE submitting your proposal.

Pre-Proposal Conference Offerors are cautioned that their offers may be considered non-responsive if they include any qualifications, including but not limited to price escalation reservations. Equal Opportunity: The contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. Licenses/Permits: Contractor is fully responsible for any and all required licenses and permits to complete this project. Partnering is voluntary but highly encouraged. Cost will be split between contractor and government. The goal is to build professional work relationships geared toward successful project completion by promoting mutual benefits.

Pre-Proposal Conference Project Background/Scope CFM Project Executive William Picking, Jr. A/E Project Manager James Resig, PE

Pre-Proposal Conference RFP/AE Consultants: N.K. BHANDARI, Architecture & Engineering, P.C., - Architecture & Civil Engineering Carl Walker Inc. - Parking Consultant & Structural Engineering RAM-TECH Engineers, P.C. - Mechanical, Plumbing, Fire Protection & Electrical Engineering

RFP/AE Consultants: NIKA Technologies, Inc. - Security Engineering Lammers Associates - Vertical Transport Consultant Klein Engineering - Traffic Engineering Pre-Proposal Conference

Project Scope New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico  New Parking Structure – 1 st phase of 2-phase program  Phase 4: Approximately 741 Parking Spaces in Structure; 68 surface parking spaces outside of structure  Phase 5 will add 678 more parking spaces  Pedestrian Skywalk connecting to the first floor of the hospital  SCI patient access and parking accommodations  Vehicular Access from Casia Street  Maintain access to existing Admin Lots ‘D’ & ‘E’  Maintain access to existing loading dock area  Access to New Bed Tower for emergency, service, & patients  Interface with all existing and proposed infrastructure  Accommodate potential future projects

Site Constraints New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico CONCRETE CHANNEL FEMA 100-YEAR FLOOD PLAIN TREN URBANO ACCESS ROAD EXISTING HOSPITAL BUILDING CASIA STREET PR-21 MAINTAIN MINIMUM 2.5M SETBACK FROM ELEVATED TRAM RAIL TREN URBANO ELEVATED RAIL NEW PARKING STRUCTURE

Site Constraints New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico EXISTING ENTRANCE ROAD FOR LOADING DOCK AND ADMIN BUILDING ACCESS ADMIN BUILDING LOADING DOCK EXISTING HOSPITAL BUILDING CASIA STREET TREN URBANO ACCESS ROAD PR-21 ELEVATED RAIL TREN URBANO NEW PARKING STRUCTURE

Site Constraints New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico ACCESS TO UPPER AND LOWER LEVELS OF ELECT. DIST. BUILDING AND ELECT. CONDUITS IN THE ELECTRICAL DIST. IMPROVEMENTS PROJECT (IN BIDDING PROCESS) NEW GENERATORS (INSTALLED) LOADING DOCK ELECTRICAL CONDUITS NEW ADMIN. BUILDING (UNDER CONSTRUCTION) EXISTING HOSPITAL BUILDING CASIA STREET TREN URBANO ACCESS ROAD PR-21 NEW PARKING STRUCTURE

Parking Structure Footprint New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico NEW ADMIN. BUILDING (UNDER CONSTRUCTION) LOADING DOCK FOOT PRINT LEVELS 1-3 OVERHANG OF LEVELS 4-7 NEW HAZARDOUS MATERIALS STORAGE BUILDING (PHASE 5) EXISTING HOSPITAL BUILDING CASIA STREET TREN URBANO ACCESS ROAD PR-21 NEW PARKING STRUCTURE

Physical Security New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico LOADING DOCK EXISTING HOSPITAL BUILDING CASIA STREET TREN URBANO ACCESS ROAD PR-21 NEW PARKING STRUCTURE Electrical Distribution Generators 3 & 4 to be removed Generators Oxygen Tanks ADMIN BUILDING New Hazardous Materials Storage Building Mission Critical Facility

Site Access: Off-Site Improvements New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico NEW ADMIN. BUILDING (UNDER CONSTRUCTION) NEW BED TOWER SERVICE ROUTE EX. ADMIN & LOADING DOCK ACCESS ROUTE PROPOSED OFFSITE ROAD IMPROVEMENTS CASIA STREET TREN URBANO ACCESS ROAD PR-21 RIGHT TURN LANE IN DEDICATED LEFT TURN LANE IN DEDICATED LEFT AND RIGHT TURN LANES OUT PROPOSED OFFSITE ROAD IMPROVEMENTS DEDICATED LEFT AND RIGHT TURN LANES ON TO CASIA STREET Endorsement received from Authority for Proposed Off-site Improvements NEW EMERGENCY/ SERVICE ENTRANCE

New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico View Looking North – Phases 4 & 5

New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico View Looking Northeast – Phase 4

New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico View Looking Northeast – Phase 5

New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico View Looking Northeast – Phases 4 & 5

Animation New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico

Exterior Façade Concept New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico West Elevation

New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico Discussion

New Parking Structure, Phase 4 & Phase 5, VA San Juan, Puerto Rico Site Visit