건설사업의 성과평가 (미국 CII 벤치마킹 사례중심으로).

Slides:



Advertisements
Similar presentations
An Introduction to the Construction Industry Institute January 20, 2009.
Advertisements

COAA Industry Benchmarking What gets measured, gets improved! “When you’re average, you’re just as close to the bottom as you are to the top.”
Improving Your Innovation Potential Using the Innovation Maturity Model 2009 CII Annual Conference Reno, Nevada.
Presented to The Laborers Employers Cooperation & Education Trust May 9, 2006 ~ Cincinnati, OH.
Align Corporation Building success for our clients. Introducing Align Corporation.
1 “Beginning in 1999 [John] Mathis and others at CII began taking detailed looks at 38 projects with construction values of $50 million to $600 million.
CA Economy and Environment The Role of Manufacturing Industrial Council of Contra Costa March 18, 2015 Dorothy Rothrock President, CMTA.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Benchmarking at Saudi Aramco
8/15/ Facilitating Economic Growth in Cuba Shared Visions for Cuba-US Relations Conference Austin, Texas January 29-30, 2009 Manuel A. Garcia, P.E.
CII – CMAA Best Practices – Best Practitioners Wayne A. Crew Director, CII CMAA 2010 Owner’s Forum Atlanta, GA May 4, 2010.
Project Definition Rating Index (PDRI) Revisited
Benchmarking: The Journey to Improvement Dave Hile Watkins Engineers and Constructors Dave Hile Watkins Engineers and Constructors Benchmarking & Metrics.
Aker Kvaerner, Inc. CII Benchmarking and Metrics Aker Kvaerner Data Name of presenter: M. Coy Campbell, P.E. Date: 10 June 03.
PIP: Working in Harmony to Change Industry Steve Franke Shell Chemical Company Process Industry Practices 2000 CII Annual Conference Nashville,
CPI Conference 2001 Education Tools and How to Access Them Education Committee Chris Hyvonen Kiewit Chris Hyvonen Kiewit.
FIATECH CII Annual Conference Nashville, Tennessee Bill Brubaker NASA Washington, D.C.
Engineering Productivity Measurement Research Team Engineering Productivity Measurement Research Team Bob Shoemaker BE&K Bob Shoemaker BE&K CPI Conference.
The Construction Industry Institute (CII) Wayne A. Crew, Director Construction Industry Institute Saudi Arabia October 6, 2010.
Making Zero Field Rework A Reality Workshop
T. Michael Toole, PhD, PE Dept. of Civil & Environmental Engineering Bucknell University John Gambatese, PhD, PE School of Civil and.
Project Team 191: Lean Principles in Construction.
COAA Industry Benchmarking If you are not keeping score you are just practicing “
32 nd National Energy & Environmental Conference September 19, 2005 Benchmarking the Engineering & Construction Industry.
Benchmarking the Value of Best Practices CPI Conference September 30, 2002 Austin, Texas.
Project Delivery and Contract Strategy (PDCS) Project Delivery and Contract Strategy Research Team Project Delivery and Contract Strategy Research Team.
Forecasting and Minimizing Field Rework Effects of Field Rework Research Team 2000 CII Annual Conference Nashville, Tennessee Jim Atkinson U.S. Steel Effects.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
What is the Owner’s Role in Project Success? Debra Nauta-Rodriguez Smithsonian Institution.
“Taking Project Performance to the Next Level” Dick Jessop Ontario Power Generation CII Implementation Strategy Committee 2000 CII Annual Conference Nashville,
Multiple Partnering Consortium A Case Study Greg Holthouse, Fru-Con Dwayne Wilson, Fluor A Case Study Greg Holthouse, Fru-Con Dwayne Wilson, Fluor CPI.
CPI Conference 2001 Executing Small Projects Research Team Gareth Williams Bechtel Gareth Williams Bechtel Executing Small Capital Projects Executing.
DOE ASSET MANAGEMENT PLAN
RT 201 Proudly Presents: Leadership in a Knowledge Era.
Great Taste, Less Filling PDRI Small Industrial Projects (PDRI-SIP)
CII Director’s Remarks Wayne A. Crew, P.E., CII. NCCER – Scramble for Skills Sponsors Cianbro CMLA (Construction Market Labor Analyzer) Fluor Hargrove.
Critical Factors for Commissioning/Startup Success
Benchmarking in the Information Technology Age Dave Hile Cherne Contracting Corporation CII Benchmarking & Metrics Committee 2000 CII Annual Conference.
CII RT204 THEOWNERSROLETHEOWNERSROLE RT 204 The Owner’s Role in Project Success 2005 Jim Vicknair – WorleyParsons.
2015 CII Annual Conference August 3-5 Boston, Massachusetts Art MarkmanNoé SáenzStephen Mulva Univ. of Texas / HDOBurns & McDonnellUniv. of Texas / CII.
Hans VanWinkle CII Director Austin Renaissance Hotel Austin, Texas September 11-13, 2005 CPI Conference Leadership of Tomorrow: Bridging the Gap.
1. Stephen R. Thomas Candace L. Macken Tae Hwan Chung Inho Kim Construction Industry Institute Funded by NIST 2.
Industry-Specific Metrics The Case for Tailored, Transparent Metrics Benchmarking & Metrics Committee July 27, 2006.
CII Benchmarking and Metrics Implementation Session Don’t Gamble with Your Project’s Performance Harold Helland, Abbott Bob Herrington, Jacobs Stephen.
Don’t Gamble with Your Project’s Performance Benchmarking and Metrics Committee 2009 CII Annual Conference Danny Scott (BE&K, a KBR Company)
CII Annual Conference San Diego, California July 25-27, 2006 Committee Presentation Benchmarking & Metrics Committee Industry Demands Clear Measurements:
2011 Annual Conference Chicago Driving Predictable Business Outcomes in a Dynamic Global Market Opening Comments Noé Hernández-Sáenz (Moderator) Burns.
Ken Eickmann Director Construction Industry Institute
Engineering Productivity Measurement
Benchmarking the Value of Best Practices
Commissioning & Startup
e-Commerce Applications
Capital Projects Supply Chain Management
Cabot Inkjet Colorants Safety, Health & Environment Overview
Delivering on the Vision of FIAPP
Quantifying the Cumulative Impact of Change Orders
Project Delivery and Contract Strategy (PDCS)
Benchmarking: The Journey to Improvement
Fully Integrated and Automated Project Processes – The Vision
CII’s Performance Assessment Campaign
Multiple Partnering Consortium
Evaluating Onsite Design Project Team
Benchmarking & Metrics Committee
The Role of Construction in Homeland Security
Forecasting and Minimizing Field Rework
Benchmarking as a Best Practice
Noé Hernández-Sáenz Burns & McDonnell Engineering
Education Tools and How to Access Them
Chemical Engineering Honors Overview
Reliable Plant Services LLC
Presentation transcript:

건설사업의 성과평가 (미국 CII 벤치마킹 사례중심으로)

발표순서 건설성과 측정 및 벤치마킹의 필요성 미국 CII 벤치마킹 성공사례 국내 도입을 위한 제언 CII 조직 및 역사 소개 벤치마킹 데이터베이스 성과측정지표(metrics) 및 best practices 분석결과 국내 도입을 위한 제언

발표순서 건설성과 측정 및 벤치마킹의 필요성 미국 CII 벤치마킹 성공사례 국내 도입을 위한 제언 CII 조직 및 역사 소개 벤치마킹 데이터베이스 성과측정지표(metrics) 및 best practices 분석결과 국내 도입을 위한 제언

성과? Performance? 500억 이상 공공공사 사후평가제도 기획예산처의 재정사업 자율평가 미국 PART(Program assessment rating tool) SOC 재정사업 사후평가(국토연구원) 국가 R&D 성과평가(연세대, KISTEP) Performance based contract(미국의 조달방법)

Performance Measure? 학 생 건설관리자 공 부 기술/관리기법 개발 건설사업 수행 시 험 성 적 성과측정 석 차 학 생 건설관리자 공 부 기술/관리기법 개발 건설사업 수행 시 험 성 적 성과측정 석 차 경쟁자와 비교 취약점 파악 및 개선 개선여부 불투명

Benchmarking? Benchmarking - a systematic process of measuring one’s performance against recognized leaders for the purpose of determining best practices that lead to superior performance when adopted and utilized 왜 비교가 필요한가? 남자 100m 국내 기록: 10.34초 남자 100m 세계 기록: 9.78초

발표순서 미국 CII 벤치마킹 성공사례 건설성과 측정 및 벤치마킹의 필요성 국내 도입을 위한 제언 CII 조직 및 역사 소개 벤치마킹 데이터베이스 성과측정지표(metrics) 및 best practices 분석결과 국내 도입을 위한 제언

Construction Industry Institute A consortium of leading owners, contractors, suppliers, and academia that is interested in improving the constructed project and the capital investment process.

CII History Established 1983 Response to need for construction research as recommended by the BRT’s CICE initiateve 22 founding members Hosted by UT Austin

CII Owner Members 3M Abbott Labs Air Products & Chemicals Allegheny Energy Supply Anheuser-Busch Aramco Services BP America Bovis Lend Lease CITGO Cargill Celanese ChevronTexaco Colectric Partners ConocoPhillips Dofasco Dow Chemical DuPont Eastman Chemical ExxonMobil GSA General Motors GlaxoSmithKline Intel International Paper Eli Lilly and Company Marathon Oil NASA NAVFAC Ontario Power Petrobras Pfizer Praxair Procter & Gamble Rohm and Haas Shell Oil Smithsonian Institution Solutia Southern Company Sunoco TVA U.S. Air Force Research Lab U.S. Army Corps of Engineers U.S. Dept. of Commerce/NIST U.S. Dept. of Energy U.S. Dept. of Health & Human Serv. U.S. Dept. of State U.S. Steel Weyerhaeuser Company

CII Contractor Members ABB Lummus Global ALSTOM Power AZCO Inc. BE&K BMW Constructors Baker Concrete Bechtel Group Black & Veatch Burns & McDonnell Burns and Roe Butler Manufacturing CCC Group CDI Engineering CH2M HILL CSA Group Chicago Bridge & Iron Day & Zimmermann Dick Corporation Dillingham Construction Holdings Eichleay Engineers & Constructors Emerson Process Management Fluor Daniel Foster Wheeler USA Graycor Fru-Con Construction Hatch Associates Hilti Honeywell International Jacobs J. A. Jones Johnson Controls Kellogg Brown & Root Kiewit Construction Kværner M. A. Mortenson PSEG Parsons Energy & Chemicals Primavera Systems Rust Constructors S&B Shaw Group Siemens Westinghouse Stevens Painton Structural Group Technip USA Turner Construction Walbridge Aldinger Washington Group Williams Group Zachry Construction Zurich North America

Universities Active in CII Research Arizona State Auburn Cal-Berkeley Cincinnati Clemson Colorado-Boulder Florida Georgia Tech Kentucky North Dakota State Oregon State Polytechnic Purdue San Diego State Stanford Texas Texas A&M Virginia Tech Washington Wisconsin-Madison

CII Organization Board of Advisors Executive Committee Strategic Planning Committee Research Teams Implementation Teams Education Teams Analysis Team Product Review Board Marketing Deployment Board Development Board Research Implementation Support Benchmarking Globalization Breakthrough Research Committee Implementation Strategy Committee Education Committee Benchmarking & Metrics Committee Globalization Committee Forums Breakthrough Strategy Committee Questionnaire Team Communications Team Productivity Metrics Team Small Projects Team

Benchmarking & Metrics Program Objectives: Establish common definitions. Establish metric norms. Determine the value of best practices. Provide member companies a basis for self-analysis.

Benchmarking & Metrics Database Number of Projects in Database 1251 projects Worth > $60 billion Domestic 996 International 255

Benchmarking & Metrics Database Domestic 996 International 255 Contractor 550 Owner 701 120 60 343 178 53 45 48 404 50 100 150 200 250 300 350 400 450 Buildings Heavy Industrial Infrastructure Light Industrial Industry Group Number of Projects 68 162 191 217 62 158 139 109 82 <= $5MM $5MM – $15MM $15MM – $50MM $50MM – $100MM > $100MM Cost Category

What do we measure? Performance Practice Metrics Use Statistical Analyses Cost Performance Schedule Performance Safety Performance Change Performance Rework Performance Const. Productivity Eng. Productivity Pre-Project Planning Constructability Project Change Mgmt. Automation/Integration Tech. Team Building Safety Practice Planning for Startup Materials Mgmt. Quality Mgmt. Alignment Design Effectiveness Value of Best Practices

Performance Metrics Current Metrics Cost Metric Schedule Safety Changes Rework Construction & Engineering Productivity Current Metrics 75th Percentile 50th Percentile 25th Percentile Mean Median Category (n = 20 ) Metric Respondent: Cost Category : Project Type : Location: Industry Group: Project Nature: -0.15 -0.10 -0.05 0.00 0.05 0.10 0.15 Number of projects Better

CII Benchmarking Metrics Cost Performance Metrics Cost Growth Actual Total Project Cost - Initial Predicted Project Cost Initial Predicted Project Cost Delta Cost Growth | Cost Growth | Budget Factor Actual Total Project Cost Initial Predicted Project Cost + Approved Changes Delta Budget Factor | 1- Budget Factor | Phase Cost Growth Actual Phase Cost - Initial Predicted Phase Cost Initial Predicted Phase Cost Phase Cost Factor Actual Phase Cost Actual Total Project Cost

Cost Performance Metrics

Cost Growth Comparison

Schedule Performance Schedule Growth Delta Schedule Growth Actual Total Proj Duration - Initial Predicted Proj Duration Initial Predicted Proj Duration Delta Schedule Growth | Schedule Growth | Schedule Factor Actual Total Proj Duration Initial Predicted Proj Duration + Approved Changes Delta Schedule Factor | 1- Schedule Factor | Phase Schedule Growth Actual Phase Duration - Initial Predicted Phase Duration Initial Predicted Phase Duration Phase Schedule Factor Actual Phase Duration Actual Total Proj Duration

Schedule Performance Metrics

Schedule Growth Comparison

Safety Performance RIR LWCIR Total Number of Recordable Cases x 200,000 Total Site Work-Hours LWCIR Total Number of Lost Workday Cases x 200,000 Total Site Work-Hours

Actual Total Project Cost Change Performance Change Cost Factor Total Cost of Changes Actual Total Project Cost

Total Field Rework Factor Rework Performance Total Field Rework Factor Total Direct Cost of Field Rework Actual Construction Phase Cost

Construction Productivity Engineering Productivity Productivity Metrics Construction Productivity Engineering Productivity Concrete Structural Steel Piping Instrumentation Equipment Electrical Insulation Examples Work-hours / CY Installed Design Hours / CY Designed

Performance Metrics(web ver.)

Cost Growth by Project Size

Budget Factor by Project Nature

Recordable Incidence Rate by Project Size

Practice Use Metrics Current Practices Other Tools Metric Zero Accidents Techniques Team Building Constructability Pre-Project Planning Automation/Integration Tech Project Change Mgmt Materials Management Planning for Start-up Quality Management Alignment Percent Design Complete Metric Respondent: Cost Category : Project Type : Location: Industry Group: Project Nature: Number of projects Category (n = 20 ) 25th Percentile Mean Median 75th Percentile 2 4 6 10 8 Practice Use Better Current Practices Other Tools Full PDRI

Practice Use Metrics (web ver.)

Safety Practice Use by Project Size

Team Building Use by Project Size

Value of Best Practices Practice Use Performance Correlations Value of Practice Use

Improvement Potential Better Performance Metric (Scale Metric Dependent) Average Performance Improvement Low Use High Use Practice Use Metric 0 1 2 3 4 5 6 7 8 9 10 Better

Cost Benefits (Contractor) 8% N=62 N=60 N=65 N=58 Respondent: Contractors (D&C) Cost Category: Greater than $5MM Project Type: All Database: Global Industry: Heavy Industry Project Nature: All Project Budget Factor vs. Pra ctice Use Index By Practice Use Index Actual Total Project Cost Initial Predicted Project Cost + Approved Changes Project Budget Factor=

Project Schedule Growth vs. Schedule Reductions Respondent: Owners Cost Category: Greater than $5MM Project Type: All Database: Global Industry: Heavy Industry Project Nature: All Project Schedule Growth vs. Practice Use Index 5% N=60 N=55 N=65 N=57 By Practice Use Index

Safety benefit 64% Zero Accident Tech. Practice Use vs. Respondent: Owners Cost Category: Greater than $5MM Project Type: All Database: Global Industry: Heavy Industry Project Nature: All Zero Accident Tech. Practice Use vs. Recordable Incidence Rate Zero Accident Techniques Practice Use 64% Improvement Total Number of Recordable Cases x 200,000 Total Site Work Recordable Incidence Rate (RIR)=

Practice Use Categorization Respondent Type : Owners Industry Group : Heavy Industry

보고서 및 활용 Reports; 활 용; Annual Data Report Key Report Safety Report Value of Best Practices Summary Report 활 용; 시설물 계획 공사 초기단계 성과예측 적정 수준의 공사관리 노력

발표순서 국내 도입을 위한 제언 건설성과 측정 및 벤치마킹의 필요성 미국 CII 벤치마킹 성공사례 CII 조직 및 역사 소개 벤치마킹 데이터베이스 성과측정지표(metrics) 및 best practices 분석결과 국내 도입을 위한 제언

Barriers 필요성에 대한 공감대 결여 데이터의 정확성 데이터 비밀 보장 (Code of Conduct) 불합리한 제도 (장기계속공사 등) 장기지속적인 모니터링 불가능

Recommendations 발주기관과 계약자의 공감대 형성 건기법 ‘사후평가’ 개선 및 활용 지속적인 제도 개선 건설성과 평가기관의 설립 및 운영 입찰시 업체 성과평가의 고려(performance based contract)

What gets measured, gets improved! Thank you. Any Questions?