Indian Hill Grade Separation City Council Meeting February 23, 2016.

Slides:



Advertisements
Similar presentations
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Advertisements

California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Dec. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Metro Gold Line Eastside Extension Four Quadrant Gate Feasibility Study Summary.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
McKellar Park Information Session
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Planning & Community Development Department Lower Hastings Ranch Moratorium Extension City Council January 25, 2016.
Exposition Light Rail Phase 2 - Recommendation for Alternative Siting of Maintenance Facility within the City of Santa Monica.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
Planning Commission Study Session: Preferred Plan July 23, 2015.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Tower 55 Rail Reliever Study Fort Worth City Council Briefing June 8, 2010.
Planning Commission Work Session February 19, 2015.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
Railroad Quiet Zone (RRQZ) And Crossing Safety Improvement Project.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Zoning Code Amendment: Neighborhood District Overlay Zone
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Town Road Improvement Project Plan
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Northwest Area Mobility Study FasTracks Monitoring Committee
Four Winds Condominium Association August 2, 2017
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
The Oakton Condominium Association September 12, 2017
Civic Center Sports Field Study Session & Quarterly Update
Measure A Financial Oversight Committee August 7, 2013
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
Southwest LRT METRO Green Line Extension
Durham and Orange Transit Plan Funding Needs
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
Harbour Island Force Main Replacement
White Flint North Entrance Feasibility Study
I Street Bridge Replacement Project
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

Indian Hill Grade Separation City Council Meeting February 23, 2016

Indian Hill Grade Separation For many years, City staff has been working with the Construction Authority on the Claremont section of the Gold Line extension from Glendora to Montclair. The 12.3-mile, six-station Foothill Gold Line light rail extension from Glendora to Montclair was environmentally cleared under CEQA by way of the Final EIR and is now undergoing advanced conceptual engineering as the project is prepared to break ground.

Indian Hill Grade Separation As part of the engineering phase currently underway, the Construction Authority has identified several potential changes to the previously approved project. – One of those changes is the potential to build a bridge for the Gold Line light rail tracks over Indian Hill Boulevard.

Indian Hill Grade Separation Public Input Process In mid December, Gold Line approached staff to discuss the Grade Separation Proposal at Indian Hill Blvd. Staff discussed the public outreach process. Due to the holidays, staff scheduled Gold Line to present the proposal to the City Council at its first meeting in January. – At the January 12, 2016 Council Meeting, Gold Line presented the proposal. – On January 25, 2016 City held a community meeting – On January 27, staff presented an overview to Architectural Commission – On February 3, Gold Line presented to the Village Marketing Group – Notice of the proposal was included in the City Manager Weekly Update, Claremont Courier, Chamber of Commerce State of the City, and City website

Indian Hill Grade Separation Public Input Process The Authority has asked for the City Council’s feedback on whether to pursue and evaluate the grade separation proposal by late February in order for the Construction Authority’s engineering team to continue with the necessary studies and include in the CEQA addendum document. The CEQA addendum to the Final EIR would go to the Construction Authority Board of Directors for consideration in March (April at the latest). The Construction Authority is working to get the Gold Line extension project to a point in 2017 for its first design-build procurement, assuming funding becomes available in 2017 following the November 2016 sales tax ballot measure.

Indian Hill Grade Separation Structure The Construction Authority is proposing the Gold Line light rail tracks be placed on a bridge structure that would pass over Indian Hill Boulevard in the railroad easement south of First Street. The Metrolink and freight tracks would remain at street level to the south of the bridge within the easement.

Indian Hill Grade Separation Structure Bridge Construction – Abutment walls would start approximately 900 feet to the west of Indian Hill Blvd. and 700 feet to the east, gradually getting taller as the walls approach the bridge. – At their tallest, the walls will be approximately 30 feet tall. The light rail power system would rise another 16 feet above the top of the bridge. The bridge would provide at least 16.5 feet of clearance under the bridge.

Indian Hill Grade Separation Structure (Conceptual rendering)

Indian Hill Grade Separation Structure Video model of bridge a2a837a

Traffic Impact The Foothill Gold Line Construction Authority is proposing the grade separation as a means of reducing traffic wait times on Indian Hill Boulevard caused by crossings from Metrolink, freight, and Gold Line trains. – A grade-separated crossing would allow Gold Line trains to cross Indian Hill Boulevard without stopping traffic. – Gold Line trains are expected to run on 10-minute headways in each direction, so one light rail train will cross the street every five minutes on average.

Traffic Impacts The City hired a traffic consultant to study and analyze the current train crossing wait times from Metrolink and freight trains. The consultant compiled the information into a report and provided the report to the City’s Engineering staff for review.

Results of current conditions and model of 2023 conditions

The first task of the study (completed by Advantec Consulting Engineers) was to evaluate the existing conditions on Indian Hill Blvd. related to the Metrolink and Freight train crossings. As part of the consultant’s study, video footage was recorded over a 48-hour period to verify the gate down times, and the resulting traffic queues (amount of traffic backed up from the railroad tracks) and the traffic delays.

Current Conditions: Metrolink and Freight Study shows a total of 38 train crossings occurred during the day, from approximately 4:30 am to 10:30 pm (36 Metrolink, 2 Freight). Average 4 trains per hour during peak hours Average gate down time = 1 minute, 45 seconds Maximum gate down time = 3 minutes Total Gate Down time ranges from 7 minutes to 12 minutes per hour.

Future Conditions: 2023 Gold Line Gold Line trains expected to run on 10 minute intervals in each direction. One light rail train will cross the street every five minutes on average, for a total of 12 trains per hour. Gate down time per train is estimated at approximately 55 seconds per train crossing. Total Gate down time for Gold Line (at grade) will be approximately 11 minutes per hour. Total Gate Down time Gold Line above grade Gold Line at Grade 7 to 12 minutes 18 to 23 minutes

Graph Representation: Number of Train Crossings

Traffic Queues and Delays Traffic consultant completed a simulation model to measure the impacts of the combined Metrolink and Gold Line crossings on Indian Hill Boulevard. The model measured the resulting traffic queues and traffic delays for three scenarios: o 2016 current conditions o 2023 Metrolink and Gold Line (above grade) o 2023 Metrolink and Gold Line at Grade

Model Demonstration

2016 PM Peak Max Queue Traffic Queues for Current Conditions Metrolink only PM Peak (3:00 pm to 6:00 pm)

2016 PM Peak Max Queue 2023 PM Peak Max Queue w/o Gold Line Traffic Queues for 2023 Metrolink + Gold Line above Grade PM Peak (3:00 pm to 6:00 pm)

2016 PM Peak Max Queue 2023 PM Peak Max Queue w/o Gold Line 2023 PM Peak Max Queue with Gold Line Traffic Queues for 2023 Metrolink + Gold Line at Grade PM Peak (3:00 pm to 6:00 pm)

2016 PM Peak Max Queue 2023 PM Peak Max Queue w/o Gold Line 2023 PM Peak Max Queue with Gold Line Max Delay 7 min, 6 sec Max Delay 9 min, 30 sec Traffic Delays for Current Conditions Metrolink only PM Peak (3:00 pm to 6:00 pm)

2016 PM Peak Max Queue 2023 PM Peak Max Queue w/o Gold Line 2023 PM Peak Max Queue with Gold Line Max Delay 7 min, 24 sec Max Delay 10 Minutes Max Delay 7 min, 6 sec Max Delay 9 min, 30 sec Traffic Delays for 2023 Metrolink + Gold Line above Grade PM Peak (3:00 pm to 6:00 pm)

2016 PM Peak Max Queue 2023 PM Peak Max Queue w/o Gold Line 2023 PM Peak Max Queue with Gold Line Max Delay 7 min, 24 sec Max Delay 10 Minutes Max Delay 7 min, 6 sec Max Delay 9 min, 30 sec Max Delay 13 min, 18 sec Max Delay 9 min, 36 sec Traffic Delays for 2023 Metrolink + Gold Line at Grade PM Peak (3:00 pm to 6:00 pm)

Average Delays experienced throughout the day

Additional Reasons for Grade Separation In addition to reducing traffic impacts, a grade- separated crossing would provide long term benefits for noise reduction, station access and access to the historic depot. A grade-separated crossing would not require bells and lights to be activated when a Gold Line train is approaching, reducing potential noise from those warning devices. Additionally, a grade-separated crossing would require the Claremont Gold Line Station to be moved closer to College Avenue, allowing direct access to the station from both Harvard Avenue and College Avenue, and reducing visual effects from the station to the City’s historic Santa Fe depot. Gold Line is also proposing a center platform for loading and unloading passengers should the grade separation move forward.

Public Concerns At Community Meetings, several residents asked for information on an underpass or tunnel – Both concepts were given a preliminary review by the Gold Line engineers and the concepts were deemed financially unfeasible by the Construction Authority. According to the Construction Authority, both concepts would double if not triple the cost of the Claremont section of the line. The City would have to pay for the cost to tunnel or underground. – The undergrounding would result in the closure of First Street and affect surrounding properties that are adjacent to Indian Hill Boulevard. Furthermore, tunneling the light rail would significantly impact structural integrity of the buildings on either side of the easement. – The Construction Authority is not pursuing either option due to the construction impacts to adjacent streets and properties as well as the cost.

Public Concerns Residents also expressed a concern that the proposed bridge would change the character of the Village area. – Some views would be diminished due to the anticipated height of the structure and abutment walls. Residents gave input on the design of the bridge and requested consideration be given to widening the opening under the bridge, creating wider pedestrian walkways, using landscaping under the bridge to separate pedestrians from traffic, and enhancing the walls with artwork. Many residents asked for a redesign of the bridge to more closely reflect the character of Claremont.

Environmental Review If the City decides to keep the crossing at-grade, no additional environmental analysis is needed and the project will be designed and built as currently approved. Should the City decide to express support for exploring the concept of the grade-separation bridge option, the Construction Authority would environmentally analyze the project refinement and would include it in the addendum to the Final EIR and present it to the Construction Authority Board of Directors for possible inclusion in the project.

Next Steps If the City supports the grade separation concept…. The design of the bridge would be developed later with input from the community and reviewed by the Planning and Architectural Commissions and City Council. – The City would have an additional year (February 2017) to review a design concept. – Input on the design of the bridge would be limited to the look of the bridge and aesthetic details. – Additional cost over the $23 Million set aside by Gold Line for the bridge construction would be the City’s responsibility. If after Commission and community review, no design is acceptable, the City may revert back to the at-grade option.

Recommendation Based on conversations with the community as well as Gold Line Authority since the publication of tonight’s agenda, staff is proposing a revised recommendation: Staff recommends the City Council express support for the Construction Authority to evaluate under CEQA a grade separation at Indian Hill Boulevard, and direct staff to work with the Construction Authority to prepare a design concept for review by the City's Architectural Commission, Planning Commission, and City Council. The City’s commissions and ultimately the City Council will have until February 2017 to review and compare the conceptual design to an at grade option and revert back to an at grade crossing should a suitable design not be developed.