2016 PROPOSED BUDGET: PUBLIC WORKS OCTOBER 06, 2015 STEVE LENISZEWSKI, PE, PUBLIC WORKS DIRECTOR.

Slides:



Advertisements
Similar presentations
TOWN OF ORONO FY2014 Draft Municipal Budget Presentation June 10, 2013.
Advertisements

Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
June 26 th, 2010 Presentation to the Cavendish Community Ratepayers Association Inc.
Township of Galway Cavendish and Harvey 2009 Budget.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
CITY OF MERIDIAN FY08 BUDGET HEARING Mayor – Tammy de Weerd Council President – Joe Borton Council Vice President – Charlie Rountree Council – Keith Bird.
City of Houston City Council Budget Workshop FY12 Budget Presentation Department of Solid Waste Management Harry J. Hayes, Director June 7, 2011 Mayor.
Accounting Details We show transfers as a separate line below personnel, operating expense, and capital outlay so true cost of the department before transfer.
TOWN OF MONTREAT FISCAL YEAR Annual Budget Public Hearing and Presentation to the Board of Commissioners June 13, 2013.
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
2007 Borough Budget Budget Introduction Public Forum Public Hearing, possible adoption.
FY 2012 Budget Workshop #2 July 27, Richard J. Lemack Town Administrator July 27, 2011 Town Council Budget Workshop Introduction.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
2014 Budget Department Presentations Infrastructure Funding Options.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
1 City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 13, 2009 General Fund Capital Improvement Program.
Town of Lantana Budget Workshop July 27, :30 PM TOWN OF LANTANA 2009/10BUDGETWORKSHOP.
City of West Linn Fiscal Year 2009 Budget Tuesday.
Mid-Biennial Budget Modifications Budget Modifications Mid-Biennium Review Includes Changes to 2008 Only Requirements for Changes – Significant.
DEPARTMENT OF PUBLIC SAFETY PARKING SERVICES STUDENT FEE USAGE UPDATE OCTOBER 2014.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
GROWTH MANAGEMENT FY Budget Worksession July 17, 2007.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
BUDGET Compliance With Levy Limits. You are the next contestant on The Price is not Right Cost Controls from Madison have caused major problems.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption April 27, 2015.
Public Works 1 FY 2013 Sources and Uses. Public Works 2 FY 2013 Sources and Uses.
CITY OF MONROE FISCAL YEAR BUDGET PRESENTATION EDWARD SELL, FINANCE DIRECTOR.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
City of Centralia, WA 2015 Budget Second Budget Amendment Ordinance Second Reading August 10, 2015 There are NO CHANGES since Ordinance First Reading on.
2016 Revenue projections and 2016 Proposed Budget SEPTEMBER 29, 2015.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
FISCAL YEAR 2016 BUDGET City of Lockport, Illinois.
Recommended May 12, Budget Presentation Peer comparisons Decision filters  Strategic Plan  Budget Development Guidelines General Fund Revenues/Expenditures.
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
City of Joliet 2016 Proposed Budget November 30, 2015.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Budget Study Sessions ENVIRONMENTAL & UTILITY SERVICES Proposed Operating Budget OUTCOMES: -Reliable Utility Infrastructure -Healthy.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
2014 Budget Expenditures City of Knoxville, Iowa Presentation by Harold Stewart, City Manager Monday, February 11, 2013.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Department of Public Works FY 2015 Operating Budget May 19, 2014.
City of South Gate FY Proposed Budget. Breakdown of General Fund Reserves Category Reserves Results Reserves Reallocation.
1 Budget Presentation Fiscal Year 2011 May 10, 2010.
AUGUST 8, 2016 PROPOSED BUDGET WORKSHOP Proposed Budget.
Budget City of Palm Coast, Florida City Council Work Session August 12, 2008.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
PUBLIC WORKS 2017 PRELIMINARY BUDGET
Public Works/Municipal Utilities Department
City of Delavan 2017 Budget.
Budget Overview: Public Works Department
FY 2017 Recommended Capital Plan
Elizabeth City Council
Commission Workshop 3 Budget Presentation
FY2019 Proposed Budget Open House
Presentation transcript:

2016 PROPOSED BUDGET: PUBLIC WORKS OCTOBER 06, 2015 STEVE LENISZEWSKI, PE, PUBLIC WORKS DIRECTOR

Oct. 6, 2015 Proposed Budget Discussion 2 BARS Numbers for Public Works Funds Public Works: 2016 Proposal  Building  Parks  Engineering  101 Streets O & M  106 Big Rock Park  304 / 305 REET  307 Streets Capital  308 Parks  401 Water O & M  402 Sewer O & M  404 Storm O & M  407 Water Capital  408 Sewer Capital  409 Storm Capital  501 Equipment  503 Buildings

Oct. 6, 2015 Proposed Budget Discussion 3 What our Community Expects & Currently Receives Public Works: 2016 Proposal General Services  24/7 operations  Approachable & efficient service  Efficient and safe roadway network, good pavement and sidewalks  Great parks: clean, tidy, high functioning, usable, visible  Improved Communication (Facebook & Website)  Support of Events  Walkable community  Weather related services (snow, floods, natural disasters) Utilities  24/7 operations  Clean storm water and control flooding  Environmental stewardship  Safe & reliable drinking water  Toilets flush, sinks work

Summary FTE’s 6,715 Population 2,324 Housing Units Public Works Notable Service Comparison (5 year) FTE’s (-19%) 7,345 Population (+9.4%) 2,595 Housing Units (+11.7%) Budget Considerations Made Return previously reduced (0.5 FTE) Project Manager (PM) to full time within departmental budgets (General Fund and Utilities) as workload has increased and other PM is 80% dedicated to Main Street reconstruction project (Same FTE allocation to the General Fund as 2015). Dedicate appropriate amount of staff to capital funds. Staff turnover (-3 / 17, ↓ 17%) for 2015 Oct. 6, 2015 Proposed Budget Discussion

5 Public Works: 2016 Summary of Capital Projects Public Works: 2016 Proposal $8,365,000Main Street – Valley to Big Rock (306, construction) $1,700,000Big Rock Park Reconstruction, Recreation Conservation Office (RCO) Grant, (308, engineering & construction) $1,200,000Waste Water Treatment Trains, LEAP Air conversion (402) $650,000Water Various Capital Projects (407) $71,000Sewer Equipment (402) $45,000Entryway Monument Signs (304 / 305) $10,000Boy Scout/Park Projects (305) $12,041,000TOTAL[$2,500,000 TOTAL for 2015]

Oct. 6, 2015 Proposed Budget Discussion 6 Public Works Program Highlights: General Operations Public Works: 2016 Proposal Building ($162,147, ↓11% ) (Page 9 & 11)  Permit center, building inspections, community assistance  Facilitate Development: New business process (helping determine if TI’s or permits are required). Customer service; answering many types of questions.  Estimating 33 new residential construction units for  Manage emergent situations for structures. ($XX,XXX, ↓↑) = (Budget amount, percent increase↑ or decrease ↓relative to 2015 adopted budget)

Oct. 6, 2015 Proposed Budget Discussion 7 Public Works Program Highlights: General Operations Public Works: 2016 Proposal ($XX,XXX, ↓↑) = (Budget amount, percent increase↑ or decrease ↓relative to 2015 adopted budget) Parks ($245,242, ↑22%) (↑ 7.4 adj. ) (Page 13 & 18)  Maintain 17 parks facilities the Community uses and enjoys.  Mow, weed, weed eat, safety checks, repairs, clean and maintain restrooms.  200% increase in R&M budget for increase repairs related to vandalism ($3,480→7,280)  (adj.) = 2015 budget = $201,259 $29k expenditure is recognized in this department and is for Planning to buy land from Duvall Village

Oct. 6, 2015 Proposed Budget Discussion 8 Public Works Program Highlights: General Operations Public Works: 2016 Proposal Engineering ($219,130, ↑ 21% ) (↑ 3% adj. ) (Page 16 & 25)  Development review and inspections / monitoring, city project support, grant & loan applications, project delivery, program support.  Completed in-house GIS inventory for comp plan  Awarded $6,359,615 grants for 2014/2015  (adj.)= 2015 budget = $181,523 +$12k for expenses for Coe Clemons Grant from prior years ($22,914 in expenses, grant receipted in 2013 to GF) +$10k increase development need (pass-through) +$10k Traffic related to comp plan change → Complete and finalize traffic modelling, Traffic Impact Program (TIP) project list, Transportation Element, and Transportation Plan to support and implement the City Council selected EIS Alternative for the 2015 Comprehensive Plan Update process (nearly complete). ($XX,XXX, ↓↑) = (Budget amount, percent increase↑ or decrease ↓relative to 2015 adopted budget)

Oct. 6, 2015 Proposed Budget Discussion 9 Public Works Program Highlights: General Operations Public Works: 2016 Proposal 101 Streets O & M ($546k, ↓14%) (Page 24 & 36)  Roadway maintenance: Debris removal, trash, Pavement Management, landscape maintenance for roadways (bulbs, islands, parking lots, 3 rd Ave pathway, shoulders, striping), street sweeping.  No revenue from General Fund  No revenue from REET ($XX,XXX, ↓↑) = (Budget amount, percent increase↑ or decrease ↓relative to 2015 adopted budget) 106 Big Rock Park ($84k, ↓10%) (Page 30 & 40)  Increased use in 2015 w/ baseball  In 2015 we added maintaining all fields to duties in lieu of contracted services assistance.  Numbers could change relative to the ballfield project: Less water Additional revenue with increase use Equipment purchase for turf Additional service providers may be needed for turf

Oct. 6, 2015 Proposed Budget Discussion 10 Public Works Program Highlights: Capital Public Works: 2016 Proposal 304 REET ($35k used with $508 EFB ) (Page 47 & 45)  Entryway Monument Signs  Part of Big Rock Ballfields?? 305 REET ($45k used with $315k EFB) (Page 52 & 48)  Entryway Monument Signs  Eagle Scout projects  Part of Big Rock Ballfields?? 306 Main Street ($8.5 M used with $535k EFB) (Page 57 & 51)  Main Street Reconstruction (Valley to Big Rock) 307 Streets Capital ($500k) (Page 62 & 54)  $500k transfer to 306 fund for Main Street Reconstruction 308 Parks ($1.7M) (Page 67 & 57)  Big Rock Ballfields Turf Reconstruction Project

Oct. 6, 2015 Proposed Budget Discussion 11 Public Works Program Highlights: Utilities Public Works: 2016 Proposal 401 Water* ($1.924 M used with $2.5M EFB) (Page 72 & 62) 407 Water ($677 k used) (Page 90 & 73)  General operations and SPU water purchases.  Meter reading & monitoring  System maintenance, repairs, replacement  Water quality monitoring  2.2MG tank engineering & construction (mixing, Cathodic Protection, coating, seismic work)  485 zone abandonment -EFB = Ending Fund Balance & includes required reserves -*All restricted reserve amounts met

Oct. 6, 2015 Proposed Budget Discussion 12 Public Works Program Highlights: Utilities Public Works: 2016 Proposal 402 Sewer* ($2.5 M with $1.36 M EFB) (Page 78 & 65) 408 Sewer ($75k, $717k EFB) (Page 94 & 74)  General operations, system upkeep, effluent monitoring, etc.  24/7 lift station monitoring & repair  Building repair [roof, siding]  Mixers, Blowers, Gates, & Pump Replacements  Treatment Trains [LEAP to air]  408 expenditure may go to 402 (Inflow and Infiltration) -EFB = Ending Fund Balance & includes required reserves -*All restricted reserve amounts met

Oct. 6, 2015 Proposed Budget Discussion 13 Public Works Program Highlights: Utilities Public Works: 2016 Proposal 404 Storm* (Funding: $943k, $435 k EFB) (Page 86 & 69) 409 Storm (Funding: $90k) (Page 99 & 76)  National Pollutant Discharge Elimination System (NPDES) Education Monitoring Outreach Reporting  System maintenance and upkeep  Ponds, vaults, detention systems  Review CIP program & financial  Parkwood pond retrofit (grant) -EFB = Ending Fund Balance & includes required reserves -*All restricted reserve amounts met

Oct. 6, 2015 Proposed Budget Discussion 14 Public Works Program Highlights: Other Citywide Funds Public Works: 2016 Proposal 501 Equipment* (Funding: $217,273 in uses) (Page 110 & 81)  Maintenance of PW vehicles / equipment and purchases  ≈$95k PW  Large Equipment programmed: Used Dump Truck (1988 bought used & looks like 1978) 503 Buildings (Funding: $86,593 in uses) (Page 122 & 85)  Continue maintenance and upkeep of all facilities  ≈$51k PW & Parks Buildings *All restricted reserve amounts met