U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update March 2009.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Belt Line Project Cost Update May 27, Belt Line – Project Overview Undergrounding of aerial utilities – electrical and telecom Two Phases – Marsh.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Spotsylvania County Public-Private Transportation Act Spotsylvania County Infrastructure, LLC (SCI) June 2008.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
mydocs-presentations-2011PAPAMWF-EricaRevisions
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT A HISTORY: 1999 – TO PRESENT.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
THE I-75 DAYTON RECONSTRUCTION
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Four Winds Condominium Association August 2, 2017
The I-465 West Leg Reconstruction Project
DICKINSON AVENUE RECONSTRUCTION
The Oakton Condominium Association September 12, 2017
US26: Cornelius Pass Rd -185th Ave
Highway 169 Bridge Replacement & Pavement Resurfacing
Redesignation of I-95 and I-295
Contract 60X10 Informational Meeting Weber I-55
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Presentation transcript:

U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011

U.S. Route 202 – Section 300 Project Limits U.S. ROUTE 30 TO NORTH VALLEY ROAD

U.S. Route 202 – Section 300 Construction Sections Section 3IT: Intelligent Transportation System Installation (June June 2008) Section 310: 3 Overhead Bridge Replacements & 2 Intersection Improvements (March May 2009) Section 311: 3 Overhead Bridge Replacements (Feb Aug. 2010) Section 320: US 202 Mainline Widening and Reconstruction North of PA 401 (March 2011 – June 2014) Section 330: US 202 Mainline Widening and Reconstruction South of PA 401 (Early 2013 – Late 2015)

U.S. Route 202, Section 3IT Project Summary Started June 2005 Completed June 2008 Construction Cost $14.7 million Highways: US 202, US 30, PA 100 Fiber Optic Cable CCTV Cameras/Poles (33) Dynamic Message Signs (20) Roadside Incident Detectors (61) Travel Time Display (Began Nov. 2008) PennDOT Traffic Management Center Video Wall

Intelligent Transportation System Detectors, Message Signs & Cameras

U.S. Route 202, Section 310 Project Summary Started March 2007 Completed May 2009 Construction Cost $20 million Replaced Mill Lane, Church Road and Swedesford Road bridges over US 202 Widened PA 401 (Conestoga Road) Improved PA 401/Phoenixville Pike Intersection Improved Swedesford Road/ Phoenixville Pike/Planebrook Road Intersection Built storm water management sites Stream Stabilization & Restoration Wetland Mitigation/Replacement

Church Road Bridge

U.S. Route 202, Section 311 Project Summary Started February 2008 Completed August 2010 Construction Cost $25.1 million Replaced Swedesford Road, PA 29 and Cedar Hollow Road bridges over US 202 Elevated abandoned railroad bridge over US 202 ( Bridge to be repainted under Section 320 contract )

PA 29 Bridge (Morehall Road)

U.S. Route 202 Construction Section 320 SECTION 320 NORTHERN MAINLINE WIDENING (VALLEY CREEK BRIDGE TO NORTH VALLEY ROAD); NB COLLECTOR- DISTRIBUTOR ROAD AT PA 29 INTERCHANGE; US 202 BRIDGES over VALLEY CREEK & NORTH VALLEY ROAD

U.S. Route 202, Section 320 Project Summary Bid Opening December 9, 2010 Apparent Low Bid $105,415,093 ($115.9 including construction inspection) Apparent Low Bidder (Contractor) Richard E. Pierson Construction Company, Inc. Anticipated Notice To Proceed March 2011 Estimated Completion Date June 2014

U.S. Route 202, Section 320 Project Summary Widen Four Miles of US 202 to 3 Lanes in Each Direction Build Two-Mile Long NB Collector-Distributor Road at PA 29 Interchange Rehabilitate & Widen Bridges over Valley Creek & North Valley Road Install Concrete Glare Screen Barrier to Separate NB & SB Travel Lanes Erect 16 Sign Structures Erect 10 Design-Build Sound Barrier Walls Construct 3 Design-Build Retaining Walls Install 9 Storm Water Management Basins Install 10 Storm Water Mitigation Areas

FUTURE NB U.S. ROUTE 202 UNDER SWEDESFORD ROAD

U.S. Route 202, Section 320 Construction Staging Overview 5 Stages of Construction Maintain 2 Lanes of Traffic in Each Direction on US 202 During Peak Travel Hours (No Restrictions Weekdays 5 a.m. to 10 p.m.; Weekends 10 a.m. to Midnight) Nighttime Lane Restrictions Temporary Off-Peak Ramp Closures at various stages of construction (NB Ramps in 2012; SB Ramps in 2013) North Valley Road to Remain Open Tow Truck Assistance During Construction

U.S. Route 202, Section 320 Stage 1 Construction Rebuild Outside SB US 202 Shoulder at Night (Weeknights 10 pm to 5 am; Weekends Midnight to 10 am) Maintain 1 SB Travel Lane During Overnight Work Hours Install Concrete Barrier on Outside SB Shoulder Install Drainage Cross Pipes under US 202 Stage 1 Construction – Spring 2011 SouthboundNorthbound SouthboundNorthbound

U.S. Route 202, Section 320 Stage 2 Construction Shift SB US 202 Traffic to Reconstructed Outside Shoulder & Travel Lane Install Concrete Glare Screen Barrier on SB 202 for Stage 3 Widen SB US feet into Median to Accommodate future NB Travel Lanes Begin Rehabilitation/Widening of Bridges over Valley Creek & North Valley Road Stage 2 Construction – Mid-Spring to Fall 2011 SouthboundNorthbound SouthboundNorthbound

U.S. Route 202, Section 320 Stage 3 Construction Shift 2 NB Lanes over to SB Side of US 202 Four 12-Foot Wide Lanes on SB US 202 Rebuild NB US 202, Bridges & Ramps Build NB US 202 Collector/Distributor Road at PA 29 Interchange Stage 3 Construction – Fall 2011 to Late 2012 SouthboundNorthbound SouthboundNorthbound

U.S. Route 202, Section 320 Stage 4 Construction Shift All Traffic over to Rebuilt Side of NB US 202 Four 12-foot Wide Lanes on Widened NB US 202 & Collector/Distributor Road Reconstruct SB US 202 Mainline, Bridges & Ramps Stage 4 Construction – Late 2012 to Late 2013 SouthboundNorthbound SouthboundNorthbound

U.S. Route 202, Section 320 Stage 5 Construction Move 2 SB Lanes Over to Rebuilt SB Side of US 202 Two 12-foot Wide Lanes on NB and SB US 202 Reconstruct Center Median and Concrete Shoulders Stage 5 Construction – Early 2014 to June 2014 SouthboundNorthbound SouthboundNorthbound

U.S. Route 202, Section 320 Cross Section US 202 with NB Collector/Distributor Lanes at PA 29 Interchange US 202 in 6-Lane Area

U.S. Route 202 Section 320 ITS ITS coverage on US 202, US 30 and PA 100 First Travel Time System in PA

U.S. Route 202 Section 320 ITS Intelligent Transportation System Deployments Closed Circuit TV Camera 1 location Vehicle Detection System 19 locations Travel Time Systems 22 locations Communication System 9 hubs

U.S. Route 202 Section 320 ITS Travel Time System Expand existing system onto I-76, I-476, US 202, I-95 Travel Times updated every 20 seconds and displayed on Dynamic Message Signs Covers US 202 from Matlack Street to I-76; US 30 from US 202 to US 322; PA 100 from US 202 to PA Turnpike Greater accuracy and reliability with tag reader technology Includes tag reader cabinet & overhead lane components Travel Time System based on TRANSCOM architecture that is used on I-76 and on highways in N.Y., N.J. and Conn.

U.S. Route 202 Construction Section 330 SECTION 330 SOUTHERN MAINLINE (US 30 TO VALLEY CREEK BRIDGE) – 2.5 Miles MAINLINE BRIDGES: US 202 over AMTRAK, PLANEBROOK ROAD, CHESTER VALLEY TRAIL, PA 401

Section 330 – Project Summary Widen 2.5 Miles of US 202 to Three Lanes in Each Direction Replace Bridges over Chester Valley Trail and PA 401 Widen Bridge over Planebrook Road Resurface Bridges over Amtrak Install Concrete Glare Screen Barrier to Separate NB & SB Travel Lanes Erect 4 Sign Structures Erect 12 Design-Build Sound Barrier Walls Construct 5 Storm Water Management Basins Upgrade Existing ITS Fiber Optic Cable

Section Project Summary Estimated Construction Cost $82.7M Road, Bridge and Sound Wall Design Acquire 7 Parcels of Property Environmental Permit Submission Mid-2011 Anticipated Final Construction Plan Submission June 2012

Section 330 – Project Summary Advertise Construction Plans August 2012 Anticipated Construction Bid Opening October 2012 Expected Construction Start Early 2013 Expected Construction Finish Late 2015

Congestion Mitigation Program

U.S. Route 202 Section 300 Congestion Mitigation Program TMACC and GVFTMA Marketing Campaigns Guide to Commuter Options Brochure Supplemental SEPTA Bus & Rail Services Beeline Bus Route Cruise Line Shuttle Exton Station Parking Expansion Chester Valley Trail Construct Park & Ride Lot at US 30/US 322 Interchange (Caln Township)

U.S. Route 202, Section 300 Overall Project Costs DESIGN Preliminary$12.0 M Final$19.0 M* Utility / ROW$ 6.4 M* CONSTRUCTION Section 3IT$14.7 M Section 310$20.0 M Section 311$25.1 M Section 320$115.9 M** Section 330$82.7 M* Total Estimated Project Cost$295.8 M Total Cost Spent to Date$ 90.6 M * Current estimate ** Apparent low bid plus construction inspection costs

For More Information Project Website

Questions? U.S. Route 202, Section 300