SITE PREPARATION.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Log Rules. Tree versus Log Volumes Trees contain sections that resemble different geometric solids. Trying to fit one rule to approximate the entire tree.
Ground-Supported Slabs • Exterior Flatwork
Sandbagging Techniques
Double digging Double digging is a type of tillage, done by hand. The purpose is to loosen the soil so that water and roots can penetrate deeply. Equipment.
Framing Agriculture Structures
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
3-D Figures Surface Area and Volume
BCT 104 Construction Math Stair Calculations. Stair Codes Important Residential Stair Codes 1. The maximum stair riser is 8". The minimum is 4". 2. The.
LANDSCAPE WALLS. Raised bed Prevent erosion LANDSCAPE WALLS Level planting areas.
Installing Fences and Walls Ms. Gripshover Landscaping Unit 19.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Planning, Laying Out, and Tooling Concrete Block
Foundation Systems.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Gable, Gambrel, and Shed Roofs
PPT Installing Dry Stack Stone 1 PPT PROCEDURES TO INSTALL DRY STASCK STONE.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Course Estimating Square Roots 4-6 Estimating Square Roots Course 3 Warm Up Warm Up Problem of the Day Problem of the Day Lesson Presentation Lesson.
Area/Perimeter Of Combined or Partial Shapes
Tiffany Victorian assembly instructions By Laser Dollhouse Designs.
CONSTRUCTING A FIVE CABIN LATRINE
 stone work  Masonry is the building of structures from individual units laid in and bound together by mortar; the term masonry can also refer to the.
Emily Reverman.  In this portfolio, you will see how to develop formulas for the area of different shapes (rectangle, parallelogram, trapezoid, and a.
You will learn to solve problems that involve the perimeters and areas of rectangles and parallelograms.
How to build raised garden beds for small space gardening How to build a raised garden bed, which tools, material and skills needed. How much does it cost.
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
Constructing Homes and Other Buildings
Perimeter, Circumference, and Area BIG IDEA: MEASUREMENT ESSENTIAL UNDERSTANDINGS: Perimeter, circumference, and area are different ways of measuring the.
Area (geometry) the amount of space within a closed shape; the number of square units needed to cover a figure.
Calculations On completion of this unit the Learner should be able to demonstrate an understanding of: The formula used to calculate: Areas Volumes Ratios.
Intro to Concrete 18.0 & 19.0 Class notes.
Rain Gardens Credits- All images in this presentation are from the following manual: Rain Gardens- A How-to Manual for Homeowners Your Personal Contribution.
Step 1: Prepare the surface The floor should be clean, dry, flat and sound. The floor should be free from oily/waxy or curing compounds.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Geometry for the Landscape Adapted from: Chapter 2 Math for Horticulture by Mary Ann Boor From foukeffa.org Written by Cara Hutchins Kowal GA Ag Ed Curriculum.
How much wood is in that tree? How much is that tree worth?
Preparing Foundations for Cylinders & ASME Tanks
TechConnect Concrete TechConnect Concrete Math. Place Values.
How do you remember what to do?. Perimeter Add all sides of a figure. Think of the lower case t as a + sign. Easily confused with area. Look at the word.
How to Calculate Landscape Estimates and Quotes 2.01 Apply procedures to perform calculations used in estimates and quotes.
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
1 Home Gardening and Nutrition Training Material GROW FOOD AT HOME Homestead gardening for food security in Lesotho.
Area and Perimeter.
How to Build a Divider Wall By Charysse Roberson.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
 Step 1: Digging the Hole  First dig yourself a good hole. I had a look at pond liners that were available first and knew that I could get one that.
Surface Area If you remove the surface from a three-dimensional figure and lay it out flat, the pattern you make is called a net. Nets allow you to see.
1 Measures MENU Perimeter Main MENU Area of rectangle Area of rectangle questions Area of compound rectangles Area of comp rects questions Areas of borders.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
HOW TO BUILD PATIOS AND WALKWAYS It’s easier than you think!
August 2008 Preparing the Planting Site Developed by: Dr. Teri Hamlin Georgia Department of Education.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Retaining Wall Construction Building A Timber Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
BUILDING CONSTRUCTION
Planning and Placing Concrete
Estimating Square Roots
Knowledge of quantities / calculating areas
ESTIMATING EARTHWORK Prof Awad S. Hanna.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Presentation transcript:

Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education

Purpose To level a steep slope Enclose an area for a decorative garden Elevate Beds A block retaining wall can dress up the landscape.

Equipment Needed Tools – Chisel Chisel – 3 lb. sledgehammer 3 lb. sledgehammer – Torpedo level Torpedo level – Line blocks – Mason's line Mason's line – Line level Line level – Flat-pointed shovel Flat-pointed shovel – Hand tamper Materials – Retaining wall blocks – Porous plastic landscape fabric – Gravel (optional)

Advantages Concrete Interlocking Blocks Most concrete blocks interlock and require no mortar. If you make mistakes or change your mind about the location or shape of your wall, just dismantle it and start over. Each block has a lip that locks it to the previous row.

Uses Terraces with low walls Using a system of terraces, you can create a pleasant, stepped slope that is safer than a single, tall wall.

How These Block Systems Work Mortarless systems have a lip on the bottom rear side to lock the blocks together and create a step effect When the cavity behind the wall is filled with soil, the blocks are pushed forward, strengthening the joints between the lips and the underlying blocks

How many do I need? Determine the height and width of the wall. Calculate the square footage of the wall by multiplying the estimated length by the estimated height (which should include the base course) of the wall. Example: 25' L x 2' H = 50 sq/ft. number of blocks you need depends on the pattern you choose and the square footage of the wall above grade.

How many do I need? Number of blocks needed depends on the pattern you choose and the square footage of the wall above grade – Example : Each block covers approximately 1/3 of a sq/ft (.33), therefore, for 50 sq/ft you will need approximately 152 blocks. (50 divided by.33 sq/ft per block)

Getting Started When figuring how many blocks you'll need for your wall, remember that curves require more blocks than straight runs.

How many blocks do I need for a curve? The number of blocks needed will depend on the style of block used and the size of the curve. – The formula to calculate the number of blocks needed for a specific curve is: (2 x 3.14 x radius of curve) divided by the width of block. The radius needs to be measured in inches (number of feet x 12"). Example: One course of a 10' diameter tree ring. Radius is 5' x 12" = 60".

Getting Started To accurately cut a block, score a line around it with a 3 1/2" brick chisel and a 3 lb. sledgehammer. Place the cutting edge of the chisel in the center of the score line and strike the chisel sharply with the sledgehammer. Use a brick chisel to score and cut your block.

Dig the Trench Measure out your prospective wall, using stakes and string to mark off the key points, or use a garden hose to mark off its perimeter. Starting at the lowest point, use a flat- pointed shovel to dig a trench for the foundation course. The dimensions of the trench will vary depending on the size of your block, but the foundation course should be below ground level. Tamp the trench with a hand tamper to compact the underlying soil.

Sloping Property If your property slopes, you may have to dig your foundation trench in a series of steps equal to the height of the blocks. As you continue with construction, build up the lower sections with block until the stepped areas accept successive courses of blocks in a level and seamless wall.

Lay the Courses Set the first block in place. Check for level. If the block isn't level, tap it with the butt end of your sledgehammer to adjust it. Check the level of the foundation course before you start the second course.

Lay the Courses If your property is relatively flat, continue laying the foundation course, making sure that all blocks are level with each other and below ground. If not, use the stepped approach mentioned in previous slide.

Lay the Courses After the entire foundation course is installed, set one block in position at each end of the foundation course. The lip of each block should fit against the back of the foundation course block. Use a pair of line blocks and a line level to make sure that the first and last blocks are level with each other. If they are not, adjust the retaining wall blocks until the foundation course is completely level.

Lay the Courses Cut one block in half for the start of the second course. – This will ensure that the first and second courses are staggered. – Set the rest of the second course blocks in place and then fill the trench around the foundation course with soil. – Continue placing the blocks, making sure each course is staggered over the previous one.

Fill the Cavity To prevent the soil from seeping through the spaces between the blocks, line the cavity behind the wall with porous, plastic landscape fabric.

Fill the Cavity Start at the base of the cavity and unroll the fabric until it overlaps the top course of block. Cut the fabric and continue along the length of the wall until the entire cavity is lined.

Completing the Job Fill the cavity. – If the wall is 2 1/2' or higher, fill the area closest to the block with gravel. You should have gravel to a width of about 6" from the block. The rest of the cavity can be filled with soil. This will facilitate drainage. Trim the excess landscape fabric. You can top off the terraces with decorative stone or mulch.