Monroe County Canal Restoration Demonstration Project Updates BOCC Canal Restoration Workshop April 11, 2016.

Slides:



Advertisements
Similar presentations
Carmel River Lagoon Update A presentation to the Carmel Point and Lagoon Preservation Association Monterey Peninsula Water Management District Status of.
Advertisements

WATER QUALITY MONITORING Demonstration of Remediation Methods Florida Keys Canals Henry O. Briceño Florida International University Southeast Environmental.
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Paradise Preserved: Springs Protection In Wakulla County.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Florida Water Forum Everglades Restoration June 3, 2011.
Forest Practices Code Transition Roads With Ron Davis Chief Engineer, MOF.
Municipal Regional Stormwater NPDES Permit Overview of Requirements, Recommended Changes, and Assistance Needed March 12, 2009.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Update on Canal Restoration Demonstration Projects Water Quality Protection Program August 14, 2014.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Utility Extension Project
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Fairview Township, York County May 28, 2015
Public Sector Energy Management Satish Kumar, Ph.D. Lawrence Berkeley National Laboratory Public Sector Energy Management Workshop Mumbai, India September.
SEA RAY BOATS, FLAGLER MARINE CENTER ECONOMIC DEVELOPMENT INCENTIVES.
Pershing Hill Elementary School Burn Pit Stockpile Removal Project 1.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
Monroe County Canal Restoration Updates Prepared by Wendy Blondin, AMEC.
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
March 9, 2015 Budget Work Session – Revenues. FY2016 Revenue Projections.
FLOOD MITIGATION Hampton Roads MICHAEL VERNON Director of Business Development.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Ordinance Temporarily Reducing Impact Fees Board of County Commissioners Public Hearing May 10, 2011.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Monroe County Canal Management Master Plan Phase 1 Summary Report.
Workshop 2 – Administrative Structure Recycled Water Feasibility Study Rancho Murieta Community Services District January 8, 2008.
Capital Improvements Element (CIE) Annual Update Adoption Public Hearing April 5, 2011.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
FY Budget Worksession Parks & Recreation Division July 13, 2015.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
2004 Tributary Strategies: Assessment of Implementation Options Steve Bieber Water Resources Program Presented at: COG Chesapeake Bay Policy Committee.
FY11 Budget Presentation 1 May SWEETWATER SPRINGS WATER DISTRICT Review of the FY10 (Current Year) Budget No Big Surprises (Well, Filter Rehabilitations)
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Dredged Material Beneficial Uses/Alafia Banks, Whiskey Stump Key and McKay Bay Dredge Holes August 12, 2004 Presentation to ABM.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Urban Forest for Clean Air Demonstration Project a status report February 21, 2008.
Napa County User Fee Study Board of Supervisors: Final Report Presentation May 12, 2009.
Update on Canal Restoration Demonstration Projects and Related Issues July 15, 2014 Prepared by AMEC Environment & Infrastructure, Inc.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
1975 EPA Study  Extensive construction in 1950s -1970s  Poor canal flushing results in “stagnation, putrification, and excessive nutrient enrichment.
Mandatory Connection 1 st Information Meeting. Review project Explain mandatory connection process via Frequently Asked Questions Answer questions Supply.
Monroe County’s Participation in the FWC Pilot Program for Anchoring & Mooring Stakeholder Workshops June 7-9, 2011.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1% Sales Tax Commission Board Meeting June 3, 2015.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Heritage Park Area Construction Update July 28, 2015
FY 2017/18 General Budget Workshop
Competitive Sites and Redevelopment Programs
Draft FY11 Budget Presentation
Little Rapids Habitat Restoration St
Southeast Environmental Research Center
Silt entering Dunlap Lake on Sunday, May 15, 2016, from Friday’s rain
Monroe County BOCC Special Meeting on Canals November 14, 2016
Radioactive Materials Section Update
Washoe County Board of Adjustment
Southern Maine Dredge Feasibility Study:
Presentation transcript:

Monroe County Canal Restoration Demonstration Project Updates BOCC Canal Restoration Workshop April 11, 2016

2 Canal Management Master Plan 1. Comprehensive County-wide mapping of residential canals and creation of a database 2. County-wide water quality assessment of residential canals which included dissolved oxygen measurements 3. Developed water qualify classifications 4. Prioritized canals based on need for water quality improvement 5. Identified potential restoration technologies for each canal DID NOT DEVELOP CONCEPTUAL DESIGNS, COSTS OR SCHEDULE FOR IMPLEMENTATION Good171 Fair180 Poor131 Water Quality Classifications

3

4 1. Restoration consisted of placing 900 Truckloads of clean fill (26,000 cy) to raise canal bottom from -35 feet Mean Low Water (MLW) to -7.7 feet MLW 2. Project started March 5, 2015 and completed July 3, Benefits: DO readings were below the standard 98% of the time before the restoration but after they were above the standard 100% of the time; return of sea life, revegetation of canal bottom

5 BeforeAfter

6

7 Culvert Installation Project Tropical Bay Estates, Big Pine Key Update on Canal #277 Culvert Installation Project Tropical Bay Estates, Big Pine Key

8

9 Other Demonstration Project Updates

10 Summary of $5 Million Demonstration Project Budget ProjectsCommittedIn Process  Demo Selection, Homeowner Approvals, Design, Permit, Construction Engineering Inspections $ 874,947  Backfilling Project – Sexton Cove, Key Largo $ 1,360,000  Culvert Installation – Geiger Mobile Homes, Geiger Key ($100,000 additional paid by DEP) $ 121,000  Organic Removal – Drs. Arm & Ave J, Big Pine Key $ 1,901,804  Culvert Installation – Tropical Bay, Big Pine Key (BPK) ($50,000 additional to be paid by DEP) $ 373,957  Air Curtains w/2 years O&M – Drs. Arm & Atlantic Estates, BPK $ 303,084  Monroe County Permitting Fees$ 28,222  Pumping System w/O&M – Eden Pines, BPK (estimated) On Hold  Culvert Installation – Boca Chica Ocean Shores, Geiger Key On Hold TOTAL COMMITTED: $4,963,014 BUDGET REMAINING: $36,986

11 Questions? Picture courtesy of Michael Blondin