Presentation to the Multnomah County Board of Commissioners October 28, 2010.

Slides:



Advertisements
Similar presentations
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Advertisements

22 AUGUST 2013 WORKING WITH ENERGY IN CHINA 1 Working with energy in China Mogens Heering, Senior VP, COWI CMC Zhang Penghao, Market Director, COWI China.
2 Turner Senior Leadership Team Meeting November 2009: New Businesses, Surety & Finance 2 Turner Sustainable Construction Group Project Overview $111.
Children First! ENCINITAS UNION SCHOOL DISTRICT Children First! CAPITAL FACILITIES AND TECHNOLOGY PROJECT LIST.
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
1 Green Collar Jobs in the Housing Sector Green Affordable Housing Forum Metropolitan Washington Council of Governments Howard Ways, AICP DC Office of.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
Overview of Property Assessed Clean Energy (PACE) Program San Antonio Office of Environmental Policy December 16, 2009.
City of Scottsdale Senior Center at Granite Reef
City/University Projects Fund Calendar Year 2012 Budget Request.
Campus Energy Efficiency Fund PERC Fall Conference and Annual Meeting Climate Change Panel Joyce Ferris October 29, 2013.
Some general information about the County-level Judiciary and the role of the Clerk of District Court.
LEED CERTIFICATION IN THE RETAIL ENVIRONMENT Maggie Benson and Isabelle Bouthillier Project By:
Sustainable solutions to large scale architecture, urban planning and design
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Austin Neighborhood Council Civil & Family Courthouse April 22,
The Greening of the Rooftop Module 10 Green Roofing & Public Policy Regulations & Incentives.
Panama Bartholomy Advisor to Chairman Douglas California Energy Commission Clean Energy Workforce Training Program.
Kären Haley Director, Office of Sustainability City of Indianapolis Great Lakes Regional Pollution Prevention Roundtable/ Region 7 Conference June 4, 2009.
Planning for a Vibrant Community. Introduction Planning is a process that involves: –Assessing current conditions; envisioning a desired future; charting.
4/07/09 Briefing to Senate & House Committees on Labor American Recovery and Reinvestment Act of 2009 STATE ENERGY SECTOR PARTNERSHIP AND JOB TRAINING.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
2008/09 Recommended Budget Washtenaw County Board of Commissioners September 2007.
Green Project Reserve (GPR) of the “American Recovery and Reinvestment Act (ARRA) of 2009” What does it mean for PA?
Presented By: Matt Bell Partner, Viridian. Buildings and the Environment Buildings account for 36% of greenhouse gas emissions Buildings account for 72%
8th Mid-Atlantic Regional Planning Roundtable Arlington, VA March 30, 2012 PlanMaryland Maryland Department of Planning.
1 Impact Fees in Virginia Virginia Municipal League Annual Conference October 15, 2007 Jeffrey S. Gore Hefty & Wiley, P.C.
Leadership Asheville Gary Jackson City Manager Public Leadership and Delivering Better Service to Citizens for Less Money.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
ORLANDO SCIENCE CENTER GREEN BUILDING INITIATIVE $3,000,000 Installed New HVAC System Cooling Towers New Roof Solar Panel Systems Solar Film Lighting Retrofit.
Land Use Study for the Community of Winchester July 9, 2012.
APEC Low Carbon Model Town Project Phase1 Tianjin Yujiapu Feasibility Study 1 APEC LCMT Project Feasibility Study Phase 1 Tianjin YUJIAPU Low-Carbon CBD.
Community Resource Committee Report to City Council January 15, 2015.
Green Universities and Colleges Subcommittee March 16, 2011.
COLLIN COUNTY A County Government and Transportation Overview Ruben E. Delgado, PE Director of Engineering A County Government and Transportation Overview.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
2011 Broward Municipal Green Initiatives Survey Results GHG Mitigation Energy 2/3 of Broward’s reporting municipalities have implemented incentives or.
Court Facilities Funding Public Hearing August 25, 2009.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Presentation to the Orange County Board of County Commissioners Chief Judge Belvin Perry, Jr. February 22, 2011.
TBWG Montreal, Quebec October 23, 2013 Greening of the Border Update A Land Port for the 21 st Century Van Buren, Maine.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
This project/contract is funded in whole or in part by funds made available through the American Recovery and Reinvestment Act.
ITTS Freight in the Southeast Conference Charlotte, North Carolina February 9, 2011.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
County Facilities Impact Fee Exemption Board of County Commissioners Public Hearing April 7, 2009 Board of County Commissioners Public Hearing April 7,
Oregon Youth Authority Meeting the Challenge through Collaboration and Partnerships Oregon´s juvenile justice system is composed of a network of local.
Higher Achievement for Each and Every Student Proposed FY Capital Improvement Plan: Investing in our Students Alexandria City Public Schools.
IDEM Update Air and Waste Management Meeting December 10, 2015 Carol S. Comer, Commissioner Indiana Department of Environmental Management.
Civic Center/City Hall Public Information Meeting March 20, 2007.
The importance of process in high performance building design.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
AMERICAN PUBLIC UNIVERSITY SYSTEM A 21 st Century University in an 18 th Century Town Dr. John Hough Vice President, Community College Relations & Outreach.
LeadingAge Achieving Green Savings and Sustainability Session 171.
Avondale City Center & American Sports Centers Amendment No. 2 Sports Facility Construction City Council January 4, 2010.
Feasibility Study Phase1 Tianjin YUJIAPU Low-Carbon CBD
NEFCO Energy Efficiency and District Heating Projects in Ukraine
College Park Elementary School & Turnbull Learning Center
Draft Transportation Element September 6, 2017
21st Century School Buildings Plan
Status Report on Rochester’s DMC Transportation Plan
2/3 20% 71% Half 54% Over Half 45% 14% Introduction GHG Mitigation
JASPER COUNTY PHASE 2 JUDICIAL SYSTEM AND JAIL EXPANSION PROJECT
Presentation transcript:

Presentation to the Multnomah County Board of Commissioners October 28, 2010

 East County is the fastest growing area of Multnomah County  Oregon State Statute requires provision of court services to citizens East of 122 nd Avenue in Gresham  Targeted services include:  District Attorney  Court Services ▪ Misdemeanors through trial and sentencing ▪ Violations – mostly traffic ▪ Small Claims along with Pre-Trial Mediation ▪ Ex Parte Hearings ▪ Domestic Relations Self-Help Center ▪ East County Document filing  Reduces commuting to the over-taxed downtown Courthouse  Provides an anchor development in the Rockwood Community  Provides the County with a secure and efficient Data Center that meets industry standards

October 1, 2009 approved the updated FAC - 1 and authorized Facilities to proceed through Schematic Design at a cost not to exceed $800,000 January 1, 2010 affirmed exemption to use a CM/GC method for project construction April 22, 2010 Board approved $1.8 million in funding for the development of constructions documents August 26, 2010 approved the FAC - 1 Project plan to incorporate the Multnomah County Office of Information Technology’s Data Center into the project and established a county wide Recovery Zone

 Identity: Facility will reflect prominence and importance of providing due process to Multnomah County citizens east of 122 nd while reflecting fiscal responsibility to the taxpayers.  Operations: Use of durable, sensible materials and systems, focused on low long-term operational cost, and a functional, efficient facility that is easy to maintain.  Longevity: The facility is intended to last at least 80 years, and designed to accommodate future growth of three additional courtrooms.  Sustainability: The project team is working toward the goal to achieve a LEED Gold rating, meet the Architecture 2030 Challenge, and will incorporate the 1.5% Solar program.  Minority Involvement: The County is seeking high levels of participation from M/W/ESB businesses and organizations.

 Selected Howard S. Wright Constructors (HSW) for Preconstruction services and completion of Schematic Design Cost Estimates  Developed an M/W/ESB contracting approved by County Purchasing  Effectively incorporating a new County Data Center into the project  Completing abatement and deconstruction of Rockwood Lanes and KFC  Incorporating a geothermal ground source open loop heat pump  Obtained Type III Land Use approval from the City of Gresham  In partnership with County and City of Portland, incorporated the “Clean Diesel” Pilot Program  Coordinating with Regional Arts and Cultural Council for public art program  Focusing on LEED Gold and Architectural 2030 Challenge  Established County as a Recovery Zone as outlined in the American Recovery and Reinvestment Act  Completed 80% Construction Documents and cost estimates

1.Public Lobby 2.Traffic Courtroom 3.Court Administration 4.Core 5.Storage 6.Court Security 7.Bicycle Storage / Locker 8.Court Child Care

1.Public Lobby 2.Civil Courtroom 3.Jury Rooms 4.Core

1.Public Lobby 2.District Attorney - SED 3.District Attorney - CSD 4.Judicial Suite 5.Core

 LEED Gold at 65 Points  Recycle 90% - 95% of Deconstructed Buildings  Architecture 2030 Challenge with Ground Source Heat Pump  Incorporate 1.5% Solar program with photovoltaic array on roof  Incorporate Eco - Roof to maximize solar utilization  Harvest grey water for building use  Installation of “Take Back the Tap” water fountains in building  Native Vegetation to reduce long term irrigation needs  On-Site Stormwater Management with Infiltration Planters  “Clean Diesel” Program for Off - Road Machine Retrofits  Smart Building System – Lighting, Ventilation and Access  Radiant Floor Slab  Data Center Heat Recovery  PGE Dispatchable Power

 Achieves economy of scale thru incorporation into project  Located in a secure building to reduce risk to County data operations  Maximizes efficiency through consolidation of Courts IT equipment with Data Center

Summary of Estimated Operating Costs

Approve the Construction and Financing of the East County Courthouse