1 Larry Pope, Senior Mechanical Engineer BC Hydro, Vancouver, Canada BC Hydro’s Reliability Evolution.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Condition Monitoring Roles in Asset Reliability and Regulatory Compliance Dave Haerle, Los Angeles Department of Water and Power Scott Kunze, DataSplice.
PSE&G Condition-Based Maintenance
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Rethinking Asset Lifecycle Management Andy Chatha President ARC Advisory Group Technology People Information Processes.
Traci L. Bender Nebraska Public Power District APPA Business & Financial Conference September 15, 2009 Risk Analysis.
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
The Experience Factory May 2004 Leonardo Vaccaro.
Ed Gray, PE Public Service Electric and Gas
INDUSTRIAL & SYSTEMS ENGINEERING
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting February 8, 2008.
Capability Maturity Model
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
Computerised Maintenance Management Systems
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Environmental Impact Assessment (EIA): Overview
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
BC Injury Prevention Strategy Working Paper for Discussion.
Fleet Performance and Reliability in Generation Utilities
N By: Md Rezaul Huda Reza n
Software Quality Assurance Activities
From Research Prototype to Production
Produced by: Integrated Asset Planning for Nuclear Power Plants Matt Kohal Southern California Edison.
Human Resource Management Lecture 27 MGT 350. Last Lecture What is change. why do we require change. You have to be comfortable with the change before.
Software Estimation and Function Point Analysis Presented by Craig Myers MBA 731 November 12, 2007.
Energy Industries of Ohio Southeast Energy-Water Interdependence Exercise Energy Assurance Program for the State of Ohio.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
11 C H A P T E R Artificial Intelligence and Expert Systems.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
W. e. t INTERSERVE PRESENTATION 22/01/2015 Company Overview.
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
Cigre B5 – 06 Working Group Presentation Protection and Control Asset Program Management John Robertson March 25, 2008.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Chapter 13 Information Technology Economics. Agenda IT Organization IT Productivity IT Benefits Data Center Economics.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
Chris Reichart Appointed Process Assignment November 6, 2015.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
Computerised Maintenance Management Systems
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
EQUATE PETROCHEMICAL COMPANY EQUATE RCM Project Implementation By Khalid Al-Anzi.
Asset Integrity & Reliability Management A Strategic Perspective Andreas de Vries Doha, 15 – 18 May 2016.
IS Development Methodology
Long-Term Planning Presented by: APP Site Visit Don Untch
Wind Composite Services Group/WindCom
PRESENTATION OF THE FIRST JOINT EAST AFRICAN HEALTH CARE CONFERENCE AND EXHIBITION TITLE: EQUIPMENT INVENTORY AS A BASIS OF DYNAMIC EQUIPMENT MANAGEMENT.
Flooding Walkdown Guidance
Across the entire value chain
Fertilizer Industry Safety Information Analysis and Sharing Program
Maintenance Opportunities
Presentation transcript:

1 Larry Pope, Senior Mechanical Engineer BC Hydro, Vancouver, Canada BC Hydro’s Reliability Evolution

2 Who We Are  A provincial Crown Corporation owned by the people of British Columbia  Accountable to the provincial government and the regulator, the BC Utilities Commission  Annual Revenue of $ 4.31 billion  Number of Customers: 1.7 million (94% of BC residents)

Where We Are Vancouver, British Columbia, Canada

4 reliable power, at low cost, for generations Our Purpose

5 BC Hydro Affiliates Construction Business Unit (CBU) –Field Services Powertech Labs –Testing and research services ABSU –Computer services Powerex –Electricity trade activities BC Transmission Corporation (BCTC) –Responsible for the province’s publicly owned transmission system

6 Rate Comparisons

BC Hydro at a Glance 2nd largest Canadian electric utility 4200 employees Installed generating capacity of over 11,000 megawatts (MW) Up to 54,000 GWh of electricity generated annually 61 dams at 42 sites 45 generating facilities –30 hydroelectric generating facilities –3 thermal generating facilities –12 stationary & mobile diesel stations

8 Old and Aging Fleet Many generating assets approaching end-of-life where performance declines & cost to maintain increases Performance/condition unacceptable above this line Performance/condition acceptable below this line

9 Generator at a Glance Draft Tube Scroll Case Turbine Rotor Stator Exciter Bearing Wicket Gates Shaft

10 In 1999 BC Hydro’s existing Preventative Maintenance Program was lacking technical basis and commercial focus Maintenance procedures were not well understood or followed Crews were frustrated as they were left to perform what maintenance tasks they believed were appropriate Maintenance procedure revision history was not well documented There was no methodology for how procedures and documents were to be created and maintained Maintenance History

11 RCM History Goals: Evaluate the benefits of doing a RCM analysis Results –Improve commercial availability: »Average availability increased by 5 days/year –Addressed FM’s related to known forced outages – Developed and fostered good teamwork –Captured retiree’s knowledge –Met WCB requirements, EOR signoff RCM Pilot Project – Ruskin 1999

12 RCM Project core and strategic plants on “water to wires” systems (except civil structures and protection equipment) BCH engineers and technical staff were used and less consultants – goal was a cultural change Program documentation and Engineer of Record Equipment analyzed: –H20 Passages –Turbine –Generator –Governor –Exciter –Switching By April , an RCM Program had been implemented at 23 key BC Hydro Generating Stations The planned cost was $4.5M. The actual cost was $3.7M

13 Availability: annual unit availability increased by approximately 1,000 GWh (annual benefit of $3M) Reliability: downward trend of forced outages at plants without significant capital upgrades Maintenance Costs: estimated that planned maintenance labour was reduced by 3% (annual savings of $68k) Project Costs: actual costs for the project were 18% under the approved budget Benefit/Cost Ratio of 5 for RCM project (business case estimate was 3.1) and numerous intangible ones Tangible Benefits

14 Tasks to the shop floor PI/OI not well used Passport - entry into CMMS –Schedules a number, does not store the maintenance results –Failure/fault codes not used Project did not define a Benefits measurement criterion Project did not define a Sustainability element Challenges

15 Turbo Tools Turbo Tools were created to assist with RCM Turbo database manipulation Excel spreadsheets with Macro’s –Database Integrity Check –Engineer of Record –Information Transfer –Maintenance Instruction + Preload –Passport Preload –RCM Failure Analysis

16 Database Integrity Turbo Tools

17 FMEA – RCM Failure Analysis Turbo Tools

18 Information Transfer Turbo Tools

19 Maintenance Instructions + Preload Turbo Tools

20 Passport Preload Turbo Tools

21 Summary RCM Sustainability RCM Workload –RCM new systems, update existing New Maintenance Engineers RCM Audit Equipment Health Rating –RCM schedules tasks Significant equipment challenges Present Situation

22 Summary Planning and Scheduling Integration Reduce Process Burden Passport Audit Reliability Optimization Life Cycle Costing Root Cause Analysis Predictive Software Interfacing Moving Forward

23 Integration better than best of breed –Still some consideration for the data warehouse concept The RCM process burden associated with the RCM Turbo- Passport interface should be reduced Add Turbo Tool functionality within Turbo –Maintenance Instructions This is causing use problems – beta testing/programming support –Failure Mode and Effects Analysis (FMEA) Passport Audit –Business rules are not being followed, add root cause codes Consider “All” maintenance within Turbo Moving Forward

24 The BC Hydro Dam Safety group is asking for higher system reliability – From 1 in 100 to 1 in 10,000 risk of failure Least Risk Cost and a Reliability Optimizer Moving Forward

25 Turbo – also use as a design tool, upload to RBD ie GoldSim GoldSim is a Monte Carlo simulation software solution for dynamically modeling complex systems GoldSim supports decision and risk analysis by simulating future performance while representing the uncertainty inherent in all complex systems Moving Forward

26 Root Cause Analysis Understand root causes and find solutions A basic one, non proprietary, BC Hydro Safety Group is using Systems Approach Strategies Record causes and solutions Moving Forward

27 Predictive Analysis Software Capability Add intelligence to PI/OI Data ERP went out, 5 replies, piloting the best two Moving Forward

28 Interface Software Collects equipment condition data from visual inspections, predictive maintenance technologies, controls, sensors, and data historians Consolidates and analyzes all condition data, identifying potential failures and recommending corrective actions The results are presented visually through flashing alarms and trending graphs Passport Analysis Software - RCM Turbo InterfaceSoftware

29 Questions? When it comes to reliability we are all on the same page!