Doc.: IEEE 802.11-05/745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 1 Test Methodology for Measuring BSS Transition Time Notice: This document.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0866r1 Submission September 2005 Michael Montemurro, Chantry NetworksSlide 1 Mobility Domain Definition and Description Notice: This.
Advertisements

Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /tbd Submission March/2006 Pertti Visuri, Airgain, Inc. Over the Air Testing - Comparing Systems with Different Antennas Notice: This.
Doc.: IEEE /1280r1 Submission Jan 2006 Bin Wang, ZTE CorporationSlide 1 Frequent Handover Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0322r0 Submission March 2006 Royce Fernald - Intel CorporationSlide 1 Video Use Cases Notice: This document has been prepared to assist.
Doc.: IEEE /0121r0 Submission January 2006 S. Bezzateev, A. Fomin, M. WongSlide 1 Broadcast Management Frame Protection Notice: This document.
Doc.: IEEE /0644r2 Submission May 2006 Päivi Ruuska, NokiaSlide 1 Measurement Pilot Transmission Information as optional information in Probe.
Doc.: IEEE t Submission Jan 2006 Chris Trecker, Azimuth SystemsSlide 1 Test Methodology for Measuring Loss, Delay and Jitter Notice:
Doc.: IEEE /0129r0 Submission January 2006 Don Berry, Wireless Enterprise ConsultingSlide 1 Non Noise Interference Testing Notice: This.
Doc.: IEEE /0651r0 Submission May 2006 Royce Fernald - Intel CorporationSlide 1 Video Delivery vs. Attenuation in a Conducted Environment Notice:
Doc.: IEEE /0054r0 Submission May 2011 Slide 1Hyunduk Kang, et al, ETRI Discussion on mode of management service Notice: This document has been.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /xxxxr0 Submission March 2007 M. Kobayashi, Broadcom CorpSlide 1 Proposed ACI Modifications Notice: This document has been prepared.
Doc.: IEEE /0757r0 Submission July 2005 C Trecker, Azimuth SystemsSlide 1 Test Methodology for measuring Fast BSS Transition Performance Notice:
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Doc.: IEEE /86r2 Submission March, 2010 Gabor BajkoSlide 1 Location Proxy Notice: This document has been prepared to assist IEEE It is.
Doc.: IEEE /0028r0 Submission January 2005 Eleanor Hepworth, Siemens Roke ManorSlide 1 Definitions and Terminology Notice: This document has been.
Doc.: IEEE /0220r0 Submission March 2005 Peter Ecclesine, Cisco SystemsSlide Liaison Report Atlanta Notice: This document has been prepared.
Doc.: IEEE /0197r0 Submission March 2005 Nancy Cam-Winget et alSlide 1 TAP & JIT Merge Process Notice: This document has been prepared to assist.
Doc.: IEEE /0477r0 Submission March 2007 C. Wright, AzimuthSlide 1 Proposal for fixing additional issues in some subclauses Notice: This document.
Doc.: IEEE /0451r0 Submission May 2005 Kobayashi, Trachewsky, Victor, Broadcom CorpSlide 1 Cairns: Proposed Over the Air Test Methodology Draft.
Doc.: IEEE /0652r1 Submission May 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D0.12 Insert and Deletion Notice: This document has been.
Doc.: IEEE /0874r0 Submission September 2005 C Trecker, et alSlide 1 Test Methodology, Metrics and Test Cases for measuring Fast BSS Transition.
Test Methodology for Measuring Loss, Delay and Jitter
September 2005 Test Methodology, Metrics and Test Cases for measuring BSS Transition Performance Date: Authors: Notice: This document has been.
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
Latency-sensitive Applications - metrics
Status, Next Steps and Call to Action
IEEE White Space Radio Contribution Title
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
Effect of FCH repetition on the detection of FCH and MAP
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
IEEE P Wireless RANs Date:
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
Requirements for TGT Proposals
TGy draft 2.0 with changebars from draft 1.0
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
Questions to the Contention-based Protocol (CBP) Study Group
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGT July 2005 Closing Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Proposal for Diagnostic Alerts
Presentation transcript:

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 1 Test Methodology for Measuring BSS Transition Time Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 2 Abstract This presentation is the companion presentation for document 11-05/537r0, which contains text for inclusion into the TGT draft. In these documents, a test methodology for measuring the observed BSS transition time metric is proposed.

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 3 Purpose of the Test BSS transition time impacts latency-sensitive applications such as voice Characterization of BSS transition time provides important information to system designers and planners –“What is probability of a codec jitter buffer underrun during a BSS transition?” –“What is probability of a BSS transition taking so long the call is dropped?” Results presented in form of cumulative distribution function (CDF) enable these questions to be answered directly

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 4 Test Methodology Create a test bed with two APs and one client STA in a controlled (conducted and isolated) environment Use variable attenuators to simulate varying signal conditions Send periodic data traffic –Uplink only, downlink only, or bidirectional Offered load of data traffic should be consistent with the application of interest (but need not be actual application traffic) –E.g., 20 ms G.711, 30 ms G.729, etc., etc. –Actual payload size and contents not that important Capture traffic with wireless monitors Analyze traffic to determine length of BSS transition Repeat measurements until have sufficient data to evaluate performance to desired level of accuracy –100 transitions makes a pretty good plot

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 5 Test Setup

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 6 What kind of test is this? We are proposing it as a system test However, if test equipment is used as the client, it’s an infrastructure test Vice versa for infrastructure simulated with test equipment: client STA is the DUT

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 7 Attenuator Sweep Diagram Attenuators sweep at a constant rate to produce a linear (in dB) sweep from one extreme to the other

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 8 Attenuator Sweep We agree entirely with points of 11-05/703r0 –Attenuator dynamics should be completely specified for repeatability A linear attenuator sweep may not represent reality However: –It is simple to specify –It serves the purpose of triggering the roam –“Real life” is not the free space path loss model!!! The linear (in dB) attenuator sweep is proposed as the baseline Tests may be run with other profiles, but the profile must be reported in the results

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 9 Why Variable Attenuators? Important to remember that the purpose of the variable attenuators is only to TRIGGER A ROAM Once the client decides to roam, we want to know how long it takes We are not interested in how long after we start changing the attenuators it takes for the client to roam –This would make all kinds of effects of the attenuator dynamics important

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 10 What about changing attenuator values while data is being transmitted? We have not seen this as a problem One small investigation: –Run line-rate traffic at a low PHY rate (1500 byte packets) while switching attenuator by 5 dB about 1000 times per second –Low PHY rate and long packets ensured attenuator would change during the frame –No increase of frame errors was observed Typically, attenuator step size is 1 dB We will happily share more detailed data demonstrating this

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 11 Test Data from 1105 Iterations Average BSS Transition Time = 57 ms Std. Dev. = 135 ms

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 12 Same data as previous slide with expanded X axis Average + Std. Dev. = 193 ms Average = 57 ms

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 13 Conclusion The proposed test methodology has proven to be very useful for firmware developers debugging their roaming algorithms Will also prove useful with wider acceptance as a means of measuring a key performance metric that is useful to system planners and designers Recommend acceptance of the proposal (11-05/537r0) into the TGT draft

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 14 Motion Move to accept proposal 11-05/537r0 into the TGT draft Moved: Seconded:

doc.: IEEE /745r0 Submission July 2005 C. Wright, Azimuth SystemsSlide 15 References 11-04/748r1, “Test Methodology for Measuring BSS Transition Time”, J. Spilman 11-04/989r1, “Metrics for Characterizing BSS Transition Time Performance”, C. Wright, C. Polanec 11-05/537r0, “Test Methodology Proposal for Measuring BSS Transition Time”, C. Wright, et al 11-05/xxxr0, “Test Methodology for Measuring Fast BSS Transition Time”, C. Trecker