July 19, 2012 Anna Peisert1 CERN/Taiwan/Helsinki production center Work share Institutes/people Status of preparations.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Silicon Detector and Micromodule Production: Present Status.
Eija TuominenHIP Detector Laboratory October Helsinki Institute of Physics DETECTOR LABORATORY National infrastructure to support Finnish research.
Eija Tuominen DEVELOPMENT OF RADIATION HARD DETECTORS Helsinki Institute of Physics (HIP) In close cooperation with: Microelectronics Centre,
UK – quad module. Experience with FE-I4 UK groups relatively new to ATLAS pixel Have 5 USBPix systems up and running now – Glasgow, Edinburgh, Manchester,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University.
The Finnish CMS Collaboration Helsinki Institute of Physics S. Czellar, A. Heikkinen, J. Härkönen, V. Karimäki, H. Katajisto,R. Kinnunen,T. Lampén, K.
WP6 interconnect technology part
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Status and outlook of the Medipix3 TSV project
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
J. Salonen, “Flip Chip Bumping Process at VTT" [presentation for GPG], 16-March-2007 Flip Chip/Bumping Process at VTT Last modified March 16, 2007 By Jaakko.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test1 WBS (& W.B.S & Services) Pixel Module Assembly & Test 1.Technical Status.
MPI Halbleiterlabor  Otto-Hahn-Ring 6  München  The Halbleiterlabor is in the unique position to have a highly flexible production.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Panja Luukka1 Silicon beam telescope for CMS SLHC detector studies (SiBT Panja Luukka, Sandor Czellar, Jaakko Härkönen, Eija Tuominen, Jorma.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Panja Luukka, Helsinki Institute of Physics1 Beam telescope for testing p- and n-type detectors Erkki Anttila, Sandor Czellar, Jaakko Härkönen,
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Background Overview of the work Secondments, conferences.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Panja Luukka1 Silicon beam telescope (SiBT) and MCz detectors: status and plans for 2008 Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
NEWATLASPIX: Development of new pixel detectors for the ATLAS experiment upgrade Giulio Pellegrini.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
PHENIX upgrade possibilities in Finland Detector Laboratory/Helsinki JYFL/Jyväskylä 1) Organisation 2) Detector Laboratory premises & equipment 3) Silicon.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Jaakko Härkönen, 6th "Hiroshima" Symposium, Carmel, California, September Magnetic Czochralski silicon as detector material J. Härkönen, E. Tuovinen,
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
Martin Frey, IEKP, Karlsruhe Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti Kortelainen, Tapio Lampén, Panja Luukka, Maria Maksimow,
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
February 25, CERN-NTU-HIP Production Readiness Rachel Bartek ◊, Po-Hsun Chen ◊, Anna Elliott- Peisert †, Francesco Fiori ◊, Jaakko Härkönen §, Rong-
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Preshower PRR July NCSR DEMOKRITOS Production Center : Institute of Microelectronics (IMEL) Regional Center : Institute of Nuclear Physics (INP)
Anna Maria Fiorello - Research Dept ATLAS-Pixel Project: Bump Bonding ATLAS BUMP BONDING PROCESS.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
Work progress in Turin x the MVD
10/month is the present production rate 2 FTE + sporadic contributions
2S module geometry updates Module positioning concepts
NTU Proposal to join CMS Tracker on Pixel Upgrade Phase I
UCSB Testing Status Anthony Affolder
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

July 19, 2012 Anna Peisert1 CERN/Taiwan/Helsinki production center Work share Institutes/people Status of preparations

July 19, 2012Anna Peisert 2 Institutes/people CERN –Anna Peisert (0.4 FTE) –Stefano Mersi (0.4 FTE) –Mechanical technicians (~0.5 FTE or more, as needed) –Clean room technician (0.25 FTE) –Option to hire a doctoral student, if needed –Support from the bond lab of the Departmental Silicon Facility National Taiwan University –Rong-Shyang Lu (0.2 FTE  0.5 FTE from 2013) –Ulysses Grundler (0.3 FTE  0.5 FTE from 2013) –Xin Shi (0.5 FTE  1.0 FTE from 2013) Helsinki Institute of Physics –Jaakko Härkönen (.3 FTE) –Panja Luukka (0.4 FTE) –Esa Tuovinen (0.5 FTE) –Teppo Mäenpää (0.5 FTE) –Henri Moilanen (0.5 FTE) –Ivan Kassamakov (0.3 FTE) –Eija Tuominen (0.3 FTE) All participants have experience in detector construction/commissionning,running

July 19, 2012Anna Peisert Work share: construction of ~220 modules Work plan: At VTT: –UBM deposition –thinning ROC wafers –cutting ROC and pixel wafers At VTT by HIP technicians: –testing sensors after cutting At HIP: –testing bare modules –shipping to CERN At CERN: –Assembly with HDIs provided by Catania –Functional tests –Thermal cycling –X-rays tests and calibration –Storage

July 19, 2012Anna Peisert Equipment Test run at VTT foreseen for the end of the summer Assembly jigs –Will be produced when the final dimensions of the module are fixed Bare modules testing –Prototype probe card and jig developed by Pisa –Will be tested in August –Test run at VTT foreseen for the end of the summer will be tested outside Thermal cycling box –Mechanics assembled –Waiting for power supplies etc to finish the assembly, ~ September 2012 X-rays generator –Plan to buy a “didactic” one if qualified by Aachen 4