CMS Tracker Week, CERN, 26-29 April 2005 26 Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.

Slides:



Advertisements
Similar presentations
1 Liverpool Production Status Week of 23 February 2007.
Advertisements

1 Liverpool Production Status Week of 02 March 2007.
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
CMS Tracker Week, CERN, July July 2003Tracker Week - Bonding WGSalvatore Costa - Catania Bonding-DB Usage or lack thereof.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Catania Lepton Tag Andrea BocciVitaliano CiulliRiccardo Ranieri INFN and Università di Firenze Alessia Tricomi INFN and Università di Catania CMS CPT Week.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Extending VERA (Conference Information) Design Specification & Schedules Arthur Chan (AC) Rohit Kumar (RK) Lingyun Gao (LG)
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Status of Windows 2000 deployment at CERN Alberto Pace, for the IT/IS group - April 2002
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
22 Jan 2002Tracker Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Bonding study of wrapping part of PA1/2
Wire tension (pull on bond) f = F/2sinα
Status Report on Bonding at Catania
SVD Ladder assembly at IPMU
Region I: stringing 1/3 done on 1st chamber!
UCSB Hybrid Bonding & Testing
ScECAL+AHCAL+TCMT Combined Beam FNAL
UCSB Testing Status Anthony Affolder
Executive summary from Bonding WG Meeting 21 Oct 2003
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
Module Failures on RODs
Module Production Status in Florence
First UCSB TEC Module (Pictures)
CSPEC meeting - Coatings
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università di Catania and INFN – Sezione di Catania

26 Apr 2005CMS Tracker Week - Bonding WG2 Salvatore Costa - Catania Catania: new facilities New bonding machine: Delvotec 6400 –Since March 8 th –From Delvotec – Braunau am Inn (Austria) –Used (Siemens, Munchen – 5 years – 800 hours) & refurbished –On lease. Rent paid for 2005 only at the moment –Rent 1700 €/month –Will own if rent paid for 4 years –Oldest of 2 Hughes dismissed –Now in clean room: Delvotec, newest of 2 Hughes New operators –2 nd operator fully trained already since last meeting (Feb 2 nd ). –3 rd operator: Russian engineer with temp contract.

26 Apr 2005CMS Tracker Week - Bonding WG3 Salvatore Costa - Catania Catania’s Delvotec 6400

26 Apr 2005CMS Tracker Week - Bonding WG4 Salvatore Costa - Catania Catania’s new Delvotec 6400 Delvotec 6400 vs. Hughes 2470 performance –Bonding times down: TIB34: 8’ 10” vs. 45’ + x TIB12: 12’ 15” vs. 65’ + x Backs: 15” vs. 1’ + x –Reliability up: Machine failure rate: negligible Bonding failures: negligible PHL- (DEAD) channels: none so far –Experience: 45 modules bonded w/ new machine Programs for all module types ready: TIB34, TIB12, TIB12sl, TIB12sr (back/front/pulltest/after_pulltest)

26 Apr 2005CMS Tracker Week - Bonding WG5 Salvatore Costa - Catania Catania’s new Delvotec 6400 Delvotec 6400 vs. Hughes 2470 bond parameters:  In this area we are still experimenting. In general : –There seems to by a narrower window available for all parameters –Unable to achieve more then ~10g pull force –Parameters tuned up by Delvotec technician as ‘the best for our parts’ are higher on Sensor than on PA With Hughes, it was the other way around. Other Centers have either similar par’s or slightly higher on PA Gradually reducing gap while constantly watching foot deformation and pull forces. Done many pull tests, as prescribed in case of new setup Still searching for the ‘best’ par combination

26 Apr 2005CMS Tracker Week - Bonding WG6 Salvatore Costa - Catania Catania’s new Delvotec 6400