1 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 WP 12.4 HOM Diagnostics Roger M. Jones Contribution from Cockcroft Institute and The.

Slides:



Advertisements
Similar presentations
Cockcroft Institute LC-ABD plenary April 2007 ILC Crab Cavity Collaboration Cockcroft Institute : –Richard Carter (Lancaster University) –Amos Dexter (Lancaster.
Advertisements

HOMSC12, ICFA Mini Workshop, Cockcroft Institute, 25 th - 27 th June 2012 Welcome and Introduction to the Workshop! Roger M. Jones Cockcroft Institute.
1 Amos Dexter, on behalf of Roger M. Jones, Carl Beard, Ian Shinton Wake-fields in the Main Superconducting L-Band Linacs of the ILC Amos Dexter The University.
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
DAPNIA 15 November 2006CARE'06, Frascati1 CARE D ISSEMINATION A CTIVITIES O. Napoly (CEA/Saclay) Chair of CARE Dissemination Board ( by interim )
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Intermediate Band Materials and Solar Cells for Photovoltaics with High Efficiency and Reduced Cost Kick-off meeting, Madrid 7th February 2007 IBPOWER.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12: Innovative RF.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement The editorial series.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP2 Past & Planned activities.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Structures design R&D program Alessandro D’Elia-UMAN/CI and CERN On behalf of Roger M. Jones 1.
Task 12.4: SRF HOM Beam Diagnostics R.M. Jones, U. van Rienen, T. Flisgen, N. Baboi (UMAN, UROS, DESY)
SRF CAVITY GEOMETRY OPTIMIZATION FOR THE ILC WITH MINIMIZED SURFACE E.M. FIELDS AND SUPERIOR BANDWIDTH The Cockcroft Institute of Accelerator Science and.
N. Baboi, DESY EuCARD WP10 Kick-off Meeting, 24 Mar HOM-couplers (pick-ups) HOMBPM - Overview Purpose: on-line measuring device for 1. beam.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
EuCARD is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, under Grant Agreement no Report.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement th EuCARD-2 SC Meeting.
1 HOMSC12, ICFA Mini Workshop, Cockcroft Institute, 25 th - 27 th June 2012
1 R.M. Jones, Overview of SRF HOM Diagnostic Task, CEA, Saclay, April 16 th 2014 Nicoleta Baboi, Ursula van Rienen Roger M. Jones DESY, Univ. of Rostock,
EuCARD SC Review, WP 10 Task 5, R.M. Jones, IPN Orsay, France, 4 th - 5 th May Task 10.5 HOM Distribution: THIRD HARMONIC SC Cavity Alignment/Diagnostics/BPM.
44th ICFA Workshop under the sponsorship of the ICFA BD Panel, Cockcroft Inst., 1-4 Dec 2008 Welcome and Introduction to the Workshop Roger M. Jones Cockcroft.
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
S 1 Annual Meeting 2013 Crediting EC contribution Open access requirements Chiara Bearzotti NACLIM project manager.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 3rd Annual.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12 Management Report.
Click to edit Master subtitle style 1 Reconstruction of HOM spectrum for XFEL 3 rd Harmonic module by Generalised Scattering Matrix technique. Nirav Joshi,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12 Management Report.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
ICFA Workshop on High Order Modes in Superconducting Cavities Batavia, IL, USA, 14 th – 16 th of July 2014 Thomas Flisgen, Johann Heller and Ursula van.
R. M. Jones (ESGARD OMIA/SRF-AS FP7, CERN, ) 11 1 High Precision SC Cavity Alignment/Diagnostics/BPM with HOM Measurements Nicoleta Baboi, Olivier.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
44th ICFA Workshop under the sponsorship of the ICFA BD Panel, Cockcroft Inst., 1-4 Dec 2008 Closing Remarks to XB08 Workshop Roger M. Jones Cockcroft.
44th ICFA Workshop under the sponsorship of the ICFA BD Panel, Cockcroft Inst., 1-4 Dec 2008 Closing Remarks to XB08 Workshop Roger M. Jones Cockcroft.
44th ICFA Workshop under the sponsorship of the ICFA BD Panel, Cockcroft Inst., 1-4 Dec 2008 Closing Remarks to XB08 Workshop Roger M. Jones Cockcroft.
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Task 5.1 BPM-HOM 4 th Quarter (Apr.-Sep. 2010) Activity this period Participation to.
FP7 SC WP 10 Task 5, Meeting #4, R.M. Jones, Cockcroft Inst., 10 h March WP 10.5 HOM Distribution Roger M. Jones Contribution from Cockcroft Institute.
EuCARD-2 4th Annual Meeting Preparation Final Reporting
Alternate Means of Wakefield Suppression in CLIC Main Linac
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
WP3 - Evaluation and proposal selection
UNISEC Universal Influenza Vaccines Secured
Agenda GA Meeting Siegen 23/02/2016 CONFIDENTIAL
EC project periodic and continuous reporting
HOMs in ESS Cavities: Spoke and Elliptical Work Proposed
Manchester University Christmas talk 04/01/2010
Uppsala Commitment to ESS and FREIA Planning
Roger M. Jones The University of Manchester and Cockcroft Inst.
Higher Order Modes and Beam Dynamics at ESS
NC and SC Structure RF and Beam Electrodynamics
WP12 Management Report & EuCARD-2 Updates
Secretariat Matters INTOSAI Working Group on Environmental Auditing
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
WP12 Management Report & EuCARD-2 Updates
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
Overview Multi Bunch Beam Dynamics at XFEL
Status of HOMS Spectra Measurements in 1.3 GHz Cavities for LCLS-II
Monthly Wp leaders meeting
HOM Based Beam Diagnostics in TESLA Superconducting Cavities at FLASH
Adam Abramowicz WUT, ISE, MCI
Nicoleta Baboi, Ursula van Rienen Roger M. Jones
Presentation transcript:

1 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 WP 12.4 HOM Diagnostics Roger M. Jones Contribution from Cockcroft Institute and The University of Manchester Ref:

2 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 TASK 10.5HOM DistributionR.M. Jones Sub-Task NameCoordinating Institute/Univ HOMBPMDESY HOMCDCockcroft/Univ. Manchester HOMGDUniv. Rostock WP 12.4 SRF HOM Diagnostics Liangliang Shi is making good progress on a circuit model of phase measurements and will apply this model to angle wakes. Nirav Joshi recently joined the University of Manchester and has made progress on on Cavity Diagnostics via the GSM on eigenmodes and Qs. Thomas Flisgen recently successfully defended Ph.D. and his thesis will be published as EuCARD2 monograph 33.

3 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 WP 12.4 Milestones and Deliverables Milestone Deliverables Milestone M82 combined with Deliverable D12.7 All in WP12.4 provide contributions to this report.

4 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 Characterization of HOMs in the 8-Cavity 3HC Module –Nirav 1.Introduction -All 2. HOMBPM Requirements (specific bands, R/Q etc) –Nicoleta 3. Overview of Simulation Methods and Results (GSM, CSM etc) –Thomas, Nirav i) analysis of monopole bands (eigenmode freqs and Qs –for single cavity and 3HC Module) –Thomas, Nirav ii) analysis of dipole bands (eigenmode freqs and Qs Qs –for single cavity and 3HC Module) –Thomas, Nirav 4. Experimental results (room temp, cryo, and module measured –rf and beam driven) -Liangliang 5. Final remarks -All Deadline -7 th March Complete! Outline for D12.7

5 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 WP 12.4 Pubs: Up to April 2015

6 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 On track for milestones and deliverables –Deadline end of Feb 2016 internally (submit to Peter end of March 2016) Conf. pubs HOMSC14 (Thomas), Vol 33 EuCARD2 Ph.D. thesis monograph (Thomas), HOMSC16? IPAC16? Upcoming HOMSC16 in NIMA or PRST-AB? More? Ensure all pubs have EuCARD2 accreditation and are also uploaded to EuCARD2 to obtain a paper number -send any missing ones to me! Upcoming (March?) bench-top measurements on characterizing 3.9 GHz cavities with specified loads will facilitate comparison to simulation –who will participate? Phase and angle-wake measurements will be made in 2016 –and compared with circuit models and grid-based simulations. Attend HOMSC16 in Rostock (22th-24th August 2016.), WP12 at Daresbury (4- 5 th April 2016), EuCARD2 annual meeting in Malta (26 th -28 th April 2016) WP 12.4 Summary

7 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015  According to article 14.7 of the Consortium Agreement, all publications need to include an acknowledgement text:  Long version: "The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures project EuCARD-2, grant agreement no ”  Short version: "The work is part of EuCARD-2, partly funded by the European Commission, GA " Consortium Acknowledgement

8 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015  Overview of SRF HOM Diagnostics task, R.M. Jones (University of Manchester/Cockcroft Inst.)  HOM-based Beam Phase and Position Measurements of FLASH and XFEL Cavities, L. Shi (DESY/University of Manchester)  Characterisation of HOMs in FLASH and XFEL Coupled Cavities using GSM, N. Joshi (University of Manchester)  Progress On SCC Simulations in FLASH and XFEL Cavities, T. Flisgen (University of Rostock) WP12.4 Talks in April WP12 Meeting at the Cockcroft Inst.