Power Working Group Summary Magnus Hansen. Introduction Most recent session at TWEPP11 TWEPP11 participant comments in the direction of: – Rather an extension.

Slides:



Advertisements
Similar presentations
DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
Advertisements

09 September 2010 Erik Huemer (HEPHY Vienna) Upgrade of the CMS Tracker for High Luminosity Operation OEPG Jahrestagung 2010.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
Switched capacitor DC-DC converter ASICs for the upgraded LHC trackers M. Bochenek 1,2, W. Dąbrowski 2, F. Faccio 1, S. Michelis 1 1. CERN, Conseil Européen.
Pulsed power poster introduction Cristián Fuentes 19/09/ > CERN DCDC converters group with F. Faccio and G. Blanchot March.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
November 29, 2002 NIKHEF-1 Hans de Vries Status RF foil RF/vacuum foil  Purpose  Production methods used  Deformations: static - overpressure  Electrical.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Developments on power transfer at CERN (DC-DC converters) Philippe Farthouat CERN.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
THE ATTRACT INITIATIVE Marzio Nessi, Markus Nordberg CERN.
1 Possible integrated solutions to the power distribution puzzle in LHC upgrades F.Faccio, S.Michelis CERN – PH/MIC.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
1 Vertex-detector power pulsing CLIC Detector and Physics Collaboration Meeting, 02/10/2013 Cristian Alejandro Fuentes Rojas, PH-ESE-FE,
Power Working Group Summary Philippe Farthouat Magnus Hansen DC-DC Plug-in Module based on Rad Tol AMIS2 ASIC.
LHCb VErtex LOcator & Displaced Vertex Trigger
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Pixel Endcap Power Distribution Phase 1 Upgrade Plans Fermilab, University of Mississippi, University of Iowa Lalith Perera University of Mississippi CMS.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
CLICdp news -- CLICdp 2-day meeting June 10 th Lucie Linssen, CLICdp, 2-day meeting, June 10th
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
F. Arteche EMC issues for Tracker upgrade. 1 de 19 CMS / ATLAS Power working group Paris- France, 23 September 2009 OUTLINE 1. Introduction. 2. EMC strategy.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
CALICE Si-W ECAL (& ILD) power pulsing (cabling) C.Clerc LLR, Ecole polytechnique, Palaiseau R. Cornat P.Mora de Freitas G.Musat J.-F. Roig.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
C. Joram1 The AX-PET project What was achieved ? What’s left to be done ? Are there ideas for a continuation ? Practicalities concerning the completion.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 The agenda Coordinator's Welcome 09:05.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
LCTPC “Advanced Endplate” (Discussion) LC TPC Meeting at ALCGP07 T. Matsuda.
TRACKING AND VERTEXING SUMMARY Suyong Choi Korea University.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Introduction to the Electronics and Readout Systems Session Ph. Farthouat, CERN.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Technology and R&D Summary and next steps Burkhard Schmidt.
14.4. Readout systems for innovative calorimeters
SiD R&D Plan and Opportunities for New Collaborators
Detector building Notes of our discussion
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Status of Ecal(s) for ILD
Sub-Detector Assembly Area Summary of discussion at ALCW2015
LHC-CC09 workshop LHC Crab Cavity Workshop, jointly organized by CERN, EuCARD-ACCNET, US-LARP, KEK, & Daresbury Lab/Cockcroft Institute CERN, September.
Summary for the Sources working group
Presentation transcript:

Power Working Group Summary Magnus Hansen

Introduction Most recent session at TWEPP11 TWEPP11 participant comments in the direction of: – Rather an extension of conference than a working group session – Should be less presentations and more discussion – Basic rules A few slides for poster introduction A few more slides for subject introduction – Presentations intended as a source of inspiration for the discussion Description of the issues, solutions, etc. Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Introduction 2 The Power working group was started to explore different power scheme options for e.g. LHC Stage 2 tracker upgrades – While these detectors are not yet built one can say that powering options have been explored Serial Power with linear shunt regulator in each node Parallel power through DCDC converters Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Serial Power and DCDC Peter Phillips gave an introduction to his poster – “A Serially Powered ATLAS Strip Tracker Stavelet with Improved Referencing Connections” Background including a direct comparison between the two schemes – DCDC scheme appear solid but more material – Serial scheme appear possible but still learning; potential (or probable) benefit of less material Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Pulsed Power Schemes The future may involve building detectors for which neither of DCDC or serial power schemes are suitable or sufficient Agenda – Pulsed Power introduction Christophe de la Taille, LAL – Pulsed Power system issues Peter Goettlisher, DESY – Power pulsing schemes for vertex detectors at CLIC Poster introduction by Cristian Fuentes, CERN Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Pulsed Power The idea is not new… Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Pulsed Power You turn off the light when you leave the room Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Pulsed Power You do not leave your car idling 24/7 either… Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

To give an Idea of the Vision… 4. Power supply 2. End of layer electronics Cooling, more space, not plenty DAQ is Optical: No issue for EMI 3. Cable and their supports 1.Planes with current-pulsed consumers in very limited space and no cooling. sensors, ASICS, PCB’s Frequencies: ILC/CLIC Train-rate: 5 / 50Hz Lengths of train 1ms/0.2µs Risk to interfere with others Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN P. Goettlicher, Desy

Power issues Before power pulsing, minimize power !! – Do not overdesign (noise, linearity, speed…) – Minimize data transfer (zero suppress) – Minimize digital currents : C dV/dt – Very different from LHC habits (and old habits die hard…) Power pulsing gives an additionnal factor up to 200 – Any permanent bias should be extremely small – Avoid floating nodes, especially on digital inputs… R&D on power pulsing started early in ILC community – All detectors assume it (vertex, TPC, calorimeters…) – Calorimeters put emphasis early on this issue in CALICE M. Hansen, P. Farthouat, CERN Power TWEPP2012 Summary C. De la Taille, LAL

Pulsed Power Introduction Christophe and Peter introduced PP work performed within Calice – Full M3 HCAL detector prototype – In test beam – 10% duty cycle PP with good performance By necessity; higher duty cycle would cause overheat 0.5% goal for ILC but conflict of interest (or priority); physicists prefer to tweak detector performance rather than validate pulsed power scheme Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

More Pulsed Power Cristian introduced poster describing work on powering a CLICPIX detector Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Constraints Restricted material budget – No Cooling as we know it from e.g. LHC experiments < 50mW/cm2 average allowing air cooling – To give an idea: flex cable with two 8u Cu layers exhaust the material budget for services > 4T B field Etc. Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Conclusion Development of DCDC and serial power schemes for the LHC stage 2 trackers continue – CMS has selected base line scheme – ATLAS will have to select a baseline scheme at some point Studies of powering schemes for ILC/CLIC detectors are ongoing – Important since the day either of these machines come on the table one need to demonstrate feasibility for both machine and experiments Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN

Future It was felt that the discussion was useful and we propose to re-convene next year during TWEPP and upon event perhaps during the year as well It would obviously be most effective if the TWEPP power session would take place before the working group meeting Power TWEPP2012 Summary M. Hansen, P. Farthouat, CERN