The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

1Operations DivisionApril 29, Pavement Markings Policy, Measures, Targets Policy: Provide appropriate pavement markings to provide presence and.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Highway Maintenance and Preservation Needs
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
TXDOT Asset Maintenance
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
October 7, 2013 Gregory Whirley Commissioner 2013 Fall Asphalt Conference.
To Pave or Not to Pave? Making Informed Decisions on When to Upgrade a Gravel Road.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
SCDOT’s Strategic Direction Janet Oakley Secretary of Transportation South Carolina Alliance to Fix Our Roads September 22, 2014 Janet Oakley Secretary.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Moving Toward a Performance- based Federal-aid Highway Program Integrating Maintenance AASHTO Subcommittee on Maintenance July 18, 2011 Peter Stephanos.
VACO Conference Transportation Programs Update November 14, 2011 Gregory A. Whirley, Sr. Commissioner.
Highway Maintenance & Rehabilitation
June 25, 2013 System Preservation Guide. June 25, 2013 Study Purpose and Goals 1.Analyze existing road conditions 2.Comparison of funding versus road.
THE FUTURE OF TRANSPORTATION FUNDING AN ALDOT PERSPECTIVE December 3, 2014.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
Indiana’s Major Moves Projects Asphalt Pavement Association of Indiana Michael B. Cline, P.E., PTOE Commissioner INDOT December 13, 2012.
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Hearing the Silence : Putting Maintenance First (A semiosis)
2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
The Road to New Hampshire's Future. Transportation Funding Overview/summary Operational deficit Preservation and Maintenance Capital needs.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Public Works Department FY Budget Challenges February 16, 2010.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Asset Management Maintenance Management System
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
NATIONAL ASSOCIATION OF COUNTY ENGINEERS Timothy Hens, PE NACE State Director – New York County Engineer, Genesee County, NY.
Town Road Redevelopment Plan Concept Introduction & Overview Town of Boulder Junction 1 December, 2015.
Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Presentation to the Washington Transportation Commission March 16, 2010 Washington State Association of County Engineers.
Capital Plan Update FMCB Meeting February 26, 2016 Pre-Decisional – Draft for discussion only.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
North Carolina Association of County Commissioners January 12, 2016 Senate Bill 581 Report Progress Update Delbert Roddenberry, Operations Programs Manager.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
1 -A BLUEPRINT- VDOT Response to a Declining Economy David S. Ekern, P.E. Commissioner Virginia Department of Transportation October 15, 2008.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
PUBLIC WORKS DEPARTMENT
Town of Clayton 2016 Pavement Condition Survey
Pavement Performance Measures In Georgia
MoDOT: Year In Review Ed Hassinger Deputy Director/Chief Engineer.
Presentation transcript:

The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015

Funding Allocations For Maintenance, Preservation, and Construction Activities Federal Funding Interstate Maintenance Bridge Program State Highway Funds Bridge Program Highway Maintenance Contract Resurfacing Pavement Preservation Program Secondary Road Paving Program Small construction Public access Spot safety Contingency 2

Interstate Maintenance Program $100M/yr Pavement $91M Bridge $9M Bridge Program FFY 2016 $100M FFY 2017 $75M FFY 2018 $50M Federal Funding 3

Highway Maintenance (FY 2015 = $514.7M) Distributed by: Primary System Secondary System General Maintenance Reserve Serves as primary funding source for all routine highway and bridge maintenance operations Funds allocated to highway divisions by needs-based formulas Some funds set aside for snow and ice removal and emergencies 4

Primary and Secondary Road Maintenance Division Needs Statewide Needs Division Administration + Allocation Formulas Division Administration Landscaping Incident Management Rest Areas Traffic Signalization Statewide/Division Needs Calculation For Assessed Needs: Funds Needed to bring assets to current target. Examples: Bridges, Pavement, Unpaved Shoulder, Ditches, Ground Mounted Signs, etc. For Non-Assessed Needs: Based on cyclical cost or historical expenditure data Examples: Mowing, Litter, Guardrail, Unpaved Roads 5

= $8,866,417 Primary Allocation Example: Division 5 Division Needs Statewide Needs Statewide Allocation Division Administration $6,253,894 $37,042,462 $35,367,693 $501,471,677 X + X + 6

General Maintenance Funding 7

Challenges Material Costs Asphalt (+133%) Salt (+134%) CRS2 (+162%) Unit Costs Patching (-8%) Pipe Installation (+35%) Guardrail Installation (+114%) Striping (+50%) 8

What does North Carolina’s System Look Like? System size second only to Texas Approximately 60,000 miles on Secondary Paved System; 50,000 have less than 2000 vehicles/day 54% have Plant Mix 44% have Asphalt Surface Treatment 9

Contract Resurfacing FY 2015 = $408M Needs assessed through pavement condition survey 100% of pavements surveyed Formula for annual distribution to Divisions: Division Needs Statewide Needs 10

= $39,646,023 Contract Resurfacing Allocation Example: Division 5 Division Needs Statewide Needs Statewide Allocation $405,548,088 $40,225,895 $411,479,733 X X 11

Resurfacing Single lift of hot mixed asphalt Pavement is in fair to good condition Patching of failed localized areas for good performance Requirement to let to contract 70% of program funds by Sept 1,

Contract Resurfacing Letting List

Contract Resurfacing Let List %20Letting%20Library/CR-12LL-Feb pdf %20Letting%20Library/CR-12LL-Feb pdf

Pavement Preservation FY 2015 = $65M Formula: Division Needs Statewide Needs Based on Pavement Condition Ratings 15

= $4,688,667 Pavement Preservation Example: Division 5 Division Needs Statewide Needs Statewide Allocation $65,045,024 $7,276,628 $100,947,331 X X 16

Why Pavement Preservation? Planned vs. Reactive Strategy Up to a 6 to 1 savings ratio vs. “worst first” Cost Effective Approach Prevents failures before they occur Results in smoother, safer roads Reduces vehicle operations costs Improved highway/user satisfaction Reflects favorably on agency and paving industry Good Pavements Stay Good 17

Pavement Preservation Outsourcing Budget:$65 Million Funds allocated for pavement preservation should meet the following targets: Mileage requirement:4300 lane miles Outsourcing requirement: FY 2015 :20% FY 2016 : 30% FY 2017 :55% FY 2018 :80% 18

Funds allocated for pavement preservation should meet the following targets: FY lane miles paved by June 30, lane miles paved by the end of the 2015 paving season FY lane miles paved by June 30, Pavement Preservation Outsourcing

20 Statewide Summary

Rehabilitation Pavement is in poor condition Traffic volumes exceed current strength Pavement is structurally inadequate Can be funded from Contract Resurfacing 21

Primary $140.8M General Maintenance Reserve $111.1M Contract Resurfacing $408.1M Pavement Preservation $65.0M Bridge Preservation $153.0M Secondary $262.8M Final FY15 Funding By Category 22

Staffing Study – Transportation Divisions Consolidated Division functions for smaller organization structureIncreased Worker to Supervisor RatiosIncrease Construction Engineering Inspection outsourcing4 –year Plan for Increased Outsourcing of Pavement PreservationContinued Assessment for Needs Based Staffing 23

Funding Categories:Need State Allocation Federal Allocation Impact i. Contract resurfacing (Primary and Secondary) $411,480,000$408,173,000 Currently fully funded Interstate pavement resurfacing $101,000,000 $91,000,000 ii. Pavement preservation$100,947,000$65,045,000 Pavement lives will shorten, condition visibly degrading in next 4-5 years iii. Routine highway, bridge and pavement maintenance, and culverts $899, 127,000$439,413,000 Targets continue not to be met. Targets and priorities to be reviewed to optimize current funding levels and enable consistent application across the State. Primary$456,514,000$154,626,000 Secondary$442,613,000$284,796,000 iv. Disasters and emergencies$74,133,000$56,500,000 Shortfalls will be addressed using routine maintenance funds. Further reducing the abilities to meet targets. Primary$43,443,000$33,118,000 Secondary$30,670,000$23,382,000 v. Structurally sound bridge preservation $60,000,000 Primary$48.000,000 Secondary$12,000,000 vi. Structurally unsound bridge rehabilitation, repair or replacement. $325,000,000$153,008,000$191, More of our bridges will become structurally deficient as they exceed their average replacement age at higher rates than previously seen Primary$195,000,000$91,805,000 Secondary$130,000,000$61,203,000 Total$1,870,668,000$1,122,139,000$282,000,000 24

Needs Increased resurfacing funding for pavement rehabilitation Increased pavement preservation funding Increased maintenance funding flexibility 25

Highway Maintenance Improvement Plan Includes: Year work is to be completed Specific roadways in each county Specific sections of roadways to be treated Type of treatment applied Estimated cost Plan Year CountyRouteBegin DescriptionEnd DescriptionLengthBudget Group Treatment Estimated Cost FY 2016BertieSR 1107SR 1106END MAINT0.880PreservationSplit Seal $ 35, FY 2016BertieUS 17NC milesSR miles2.000Resurfacing Mill 1.5" & Replace (B Level) $397, FY 2016 BertieUS 17.4 mile E NC 308NC miles1.793Rehabilitation Mill 1.5" & Replace / 1.5" Overlay (B Level) $354, (Sample from Division 1) 26

Future HMIP Cycles Divisions report delivery of Year 1 Divisions modify Years 2 & 3 as necessary Year 2 & 3 become new Years 1 & 2 Divisions add a new Year 3 in consultation with PMU Board adopts new 3-year HMIP New HMIP posted on web by April 1,

Legislative Directives - Summary Report on the condition of the State highway system and maintenance funding needs GS MOPAR delivered January 2015 Annual Highway Maintenance Improvement Program GS A First one to be delivered on April 1, 2015 Pavement Preservation Outsourcing GS Annual Report due December 1 of each year Contract Maintenance Resurfacing Program Letting Schedule SL , Section 34.11(e) 70% of the FY 2016 program funds must be let to contract by September 1, 2016 Staffing Study for Transportation Divisions SL , Section 34.16(a) and (b) 28