RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Prototyping and study of Glass Spark Chamber detectors B.Satyanarayana TIFR, Mumbai.
Gas Avalanche (%) Streamer (%) Maximum (%) Volume (L) Density (g/L) Weight (Kg) R134a , Isobutane , SF.
M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, S. Mohammed 3, N.K. Mondal 1, P. Nagaraj 1, A. Redij 1, D. Samuel 1, M.N. Saraf 1, B. Satyanarayana.
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Studies of Small Scintillating Cells with Modified Geometries Alexander Dyshkant for NICADD at NIU.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Development and study of Glass Resistive Plate Chambers Satyanarayana Bheesette Roll number: Supervisors Prof Raghava Varma, IIT Bombay Prof Naba.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
B.Satyanarayana, TIFR, Mumbai INO Collaboration. B.Satyanarayana, TIFR, Mumbai INO Collaboration Meeting, Madurai Kamaraj University September 13-15,
Glass Resistive Plate Chambers Proof of principle: BELLE Experiment: Virginia Tech (barrel) Tohoku (endcaps) Dan Marlow, Princeton (seminar at Rice), Norm.
Status of INO detector R&D B.Satyanarayana TIFR, Mumbai.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
M.Bhuyan, S.D.Kalmani, N.K.Mondal, S.Pal, Deepak Samuel, B.Satyanarayana and R.R.Shinde Gouranga Kole, Chiraag Lala and Kanishka Rawat.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
On aging problem of glass Resistive Plate Chambers India-based Neutrino Observatory (INO) collaboration JIGSAW.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
B.Satyanarayana, TIFR, Mumbai INO Collaboration. B.Satyanarayana BARC-TIFR INO meeting, TIFR, Mumbai November 9,
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Study of glass properties as electrod for RPC
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Future Work: LAPPD 6cm system and device Lei Xia.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Characteristic Impedance Measurement of Pickup Panel made up with a Suitable Dielectric Material, and Surface Resistivity (Automation) for large RPC electrodes.
The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, Development of RPCs for INO B.Satyanarayana TIFR,
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
GRPC development in Lyon
Quality Control Chamber Production
Production ad Quality control of RPCs for the CMS muon barrel system
RPC built a new plastic (peek doped with CB)
Preliminary results on optimization of gas flow rate for RPCs
Status of straw production straw module assembling
Overview of the Frascati Production Facilities
Equipment for Assembly – UK Experiences
Module Production and Testing at Duke
BESIII RPC Detector Jiawen Zhang
STAR TOF MRPC Mass Production & Q.C. (USTC)
Development of Resistive Plate Chamber for charge particle detection
Limited Streamer Tube Project Summary
Presentation transcript:

RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR

Part A Manufacturing Process at Saint Gobain at Sriperumbudur,Chennai RPC- “Glass Gap” – 400 number a)HV groove etching process b)Screen Printing : Surface resistance about 1 to 5 Mega Ohm c)Surface resistance measurements (plots) d)Gap Making : Semi automated process e)Leak Test f)QC certification and packing/transporting :IICHEP Madurai g)Storage at IICHEP

Part B Detector stack at IICHEP, Madurai a)Number of RPC of (1900 X 1800 )mm :12 b)Leak Test c)Surface resistance measurements (plots) d)RPC Assembly e)Installation. f)Up gradation of electronic g)Results

Engineering Module : Detector size: 8 meters X 8 meters X 70 layers [RPC’s = 4 X 4 X 70L= 1120 and if 20 layers then 320 RPC’s]

The “coated glass gap” with a gap of 2mm created in between two 3mm thick float glass with four gas nozzles, and these glasses are coated with conductive paint on the outer surface, while the surfaces inside the gap are cleaned and not coated. The 2mm gap is maintained by button spacers placed at distances of 200mm both along X and Y directions and by side spacers of thickness of 2mm, on the four edges. So a gap of 2mm is created inside the chamber and the buttons and side spacer are glued with 3M glue. Schematic: Glass Gap

Glass Cleaning and Drying Machine

HV groove: Etching Process HV groove for High voltage lug fixation is done by chemical etching process. 60% diluted Hydrofluoric acid has been used. First HV groove Die will be fixed by checking TOP and Bottom glass selection using wax. Near by surface covered with plastic paper to avoid damage due to HF acid. Waited for 85 min. Thrice replacing HF during this process.

WaxDIE Etching process for HV Groove

0.4mm Depth Etched HV groove HV Lug on the Painted glass

Screen Printing Stirrer cum Viscosity meter

SCREEN PRINTING AND CURING 1. Screen printing has been done using Korean ink DC20 and DC1000 in proportion of 1: IR drying temperature 110 degrees. 3. Surface resistance in range of 1M to 5 M ohm with 25 cm x 25 cm jig and with grid of 5 x 5 is acceptance criteria.

Semi Automated RPC-Glass Gap Assembly machine Button Selector Pot Button Pickup Glue Disp.Button Pusher Glue dispensing, button placing and side spacer glueing

Leak Test: Developed by Suryanarayan Sensor Board: Pressure and Temperature Raspberry Pi board Poster

READY GLASS Gap QC qualified Gap

Preparation for Storage of Glass Gaps :IICHEP Madurai

Detector stack at IICHEP, Madurai Sample 14 gas gaps made at SG factory, Chennai for Testing and Qualifying at IICHEP Madurai. Team of staff visited in batches for Installation and testing for about 3months. M.Sc students actively participated

Resistance and Pickup strip measurements

Final RPC Detector

Installation RPC

Summary Getting Industries into the R & D and then into production is almost done. Presently 30 Glass gaps per month are being fabricated Two INO member are station at Saint Gobain for day to day supervision and measurement work. Noise free 12 layers of RPC detector in operation at IICHEP, Madurai Up gradation of the existing electronics with newly tested RPC-DAQ will be implemented soon- Next talk by Dr. B. Satyanarayana.

Hope for early clearance from Tamilnadu Government to built the INO detector Thank You