FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

LIU-SPS Beam Loss, Protection, Transfer Lines WG
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC 18 & 19 April 2015 At 450 GeV with bumps, no increased MUFO activity. Beam screen 15R8 warming up to 80 K, ongoing for the day 09:00: Orbit studies.
SECTOR TEST PREPARATION W. Bartmann, C. Bracco, J. Uythoven LIBD Meeting, 10-Feb-2015.
LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Injection test? Mike Lamont For initial discussion.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.
Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.
Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Evian LHC BC workshop January LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all.
02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
RWA, EPAC06 The LHC Collimation System R. Assmann, CERN/AB for the LHC Collimation Team EPAC 2006 Edinburgh.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
LHC Sector Test1 LHC Sector Test - Beam IntroductionMike LamontIntroductionMike Lamont Proposed tests with beamBrennan GoddardProposed tests with.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Ramping & Snapback Andy Butterworth AB/RF Chamonix XIV 17 January 2005.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Sector Test 1 Roger Bailey, Helmut Burkhardt, Paul Collier, Brennan Goddard, Stephen Jackson, Lars Jensen, Rhodri Jones, Verena Kain, Alex.
Running scenario 2009/10 Run through components – and then synthesis.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
Pevatron status Sunday 29 th November 2015 Coordination: John Jowett, Mike Lamont, Jan Uythoven Access Loss maps Physics.
Faster ramp rates in main LHC magnets Attilio Milanese 7 Oct Thanks to M. Bajko, L. Bottura, P. Fessia, M. Modena, E. Todesco, D. Tommasini, A. Verweij,
FCC ramp – first stab Mike Lamont. I’(t) = 0 to avoid a voltage discontinuity “it has been shown that if I’(t) is kept low at the end of the snapback,
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Commissioning / Reliability Runs / Dry runs 1 Jan Uythoven, LIBD meeting on LBDS Reliability Run 04/02/2014 Nov – Dec 2013 Commissioning individual MKDs.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
LIBD Meeting on results of 2014 TL tests APERTURE SCANS Jose L. Abelleira for the TL team: R. Alemany-Fernandez, W. Bartmann, C. Bracco, E. Carlier, L.
LHC Commissioning with Beam
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
Outcome LBDS Dry Run – week 7
Jan Uythoven For discussion
Summary of week 7 Hardware Commissioning:
LHC operation in week 42 Coordination:, Malika Meddahi, Joerg Wenninger Thanks to OP crews, HW and SW teams + experiments Aims for the week Cure aperture.
LHC operation in week 39 Coordination: Mike Lamont, Jan Uythoven, Malika Meddahi Thanks to OP crews, HW and SW teams + patient customers Aims for the week.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Week 35 – Technical Stop and Restart
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Thursday 26th July 13:21 Fill 2880 beam dumped
Programme for Friday 9 July
Summary for LPC (March 7th, Ralph Assmann)
LHC - Week 38 Technical stop: Katy Foraz
FOLLOW-UP FOR THE TDI = LHC injection beam stopper
Wednesday 23/2 Thanks CRYO!!!.
Presentation transcript:

FCC related MDs

Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont; Attilio Milanese; Luca Bottura; Daniel Schulte; Ezio Todesco ; Jorg Wenninger

Faster LHC ramp MD MOTIVATION The interest in the faster ramp for the LHC magnets comes from a possible re-use as a hadron booster (in the view of FCC). LHC operation could obviously also profit of this in case of positive results. MD CONDITIONS Pilot beam ONLY Some ramps (as many as possible) NO changes in machine configuration Dedicated hypercycle (totally separated settings)

Faster LHC ramp MD PELP 1210 sec (8.4 A/s in average) para ex p linearpara PPLP 1074 sec (9.5 A/s in average) para linearpara Possible ramps (in order of priority): 1.2x faster snapback + maybe (to be investigated) 1.Shorter parabolic round-off 2.Higher dI/dt 2.PPLP (vs present PELP) 3.2x slower snapback (maybe better located in a OP MD) 4.3x faster snapback (very aggressive) Example This should be feasible

Faster LHC ramp MD MD description -Injection of a pilot beam in both rings with nominal conditions (no change in optics, coll hierarchy,…). -Ramp with configuration #1 -Dump at flatop and rampdown -Ramp with configuration #2 -Dump at flatop and rampdown -Ramp with configuration #3 -Dump at flatop and rampdown -…

Brennan Goddard; Matteo Solfaroli Camillocci; Verena Kain; Etienne Carlier; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Chiara Bracco; Mike Lamont; Elena Shaposhnikova; Davide Tommasini; Nicolas Magnin; Nicolas Voumard; Volker Mertens; Philippe Baudrenghien; Stephane Gabourin; Werner Herr; Bernhard Holzer; Giovanni Rumolo; Attilio Milanese; Luca Bottura; Elias Metral; Daniel Schulte; Michael Benedikt; Malika Meddahi; Jan Uythoven; Ezio Todesco ; Jorg Wenninger 1/18/16 MD on 225 GeV LHC injection

MOTIVATION For FCC: input for crucial design choice of injection energy, since x30 energy swing in FCC would mean 1.6 TeV injection. Key question for snapback Recommendation from recent Injection Energy Review to test this in LHCInjection Energy Review For possible future LHC energy upgrades: important to check the possibility of increasing the energy swing in the LHC For operating LHC: improve understanding of magnetic model and snapback with additional data points 1/18/16 MD on 225 GeV LHC injection

Possible scope of MD Cycle tests without beam Define cycle(s), generate settings, deploy, dry powering, test on interlock loops Beam conditions Single bunch (pilot – INDIV?) Ramping from 225 GeV to 450 GeV/few TeV 1/18/16 MD on 225 GeV LHC injection Cycle tests with decelerated beam GeV, decelerate (225 GeV??), start ramp How representative for magnets? Keeping BIS loop closed? Disable the LBDS? Full test 225 GeV cycle in SPS, TI 2 and/or TI 8 threading, trajectories, injection, LHC threading, capture, orbit, ramp Major changes to SPS extraction interlocking Major changes to LHC injection interlocking Many issues: LHC beam dump, E related interlocks, SMP, …, …, …,

COMMENTS ON TIMING Once configuration decided and settings generated, the cycle tests could be done during a shift without beam (already in 2016) The “deceleration” test would need some interlocking changes in LHC, so it needs accesses, validations, 2-3 shifts of beam tests and not negligible recovery time The full test probably needs: 1 day of interlocking changes in SPS and LHC Dedicated MD in the SPS to test the cycle 1 day of commissioning 1 day of measurements Long recovery time (to be planned before a TS or (better) a YETS) 1/18/16 MD on 225 GeV LHC injection

1/18/16 MD on 225 GeV LHC injection MACHINE PROTECTION CLASSIFICATION