Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects.

Slides:



Advertisements
Similar presentations
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
Advertisements

FCC-hh Injection and Extraction
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, / 5 CEA-Grenoble Contribution New challenges for the FCC.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Dr. José Miguel JIMENEZ (Coordinator) CERN, Technology Department Dr. Olivier BRUNNER (Deputy Coordinator) CERN, Beams Department 1 FCC Week
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
EuroCirCol Plan Overview Daniel Schulte for the EuroCirCol team CERN, June 2015.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
FP6 Design study "DIRACsecondary Beams" "NUSTAR":Experiments with stored radioactive beams Goals of Task 6: Research and development to handle the energy.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
FCC Week 2015, Washington Cooling the FCC beam screens
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
Ion effects in low emittance rings Giovanni Rumolo Thanks to R. Nagaoka, A. Oeftiger In CLIC Workshop 3-8 February, 2014, CERN.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015.
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Developing the Collaboration P McIntosh STFC Daresbury Laboratory.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
PXIE RFQ Design Overview Derun Li for PXIE RFQ Design Team Center for Beam Physics Accelerator and Fusion Research Division Lawrence Berkeley National.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
WP4 Cryogenic Beam Vacuum System Conception: Activity LNF (task 4.4, 4.6) R. Cimino LNF-INFN, Frascati (Italy) 1.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
Installation of an Instrument on a CERN machine
Francis Perez (ALBA) and Paolo Chiggiato (CERN)
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Some Thoughts About Possible Measurements with SR at DaFne
Leak Detection Tutorial Work
R. Kersevan, TE-VSC-VSM 30/06/2016
Materials for extreme thermal management (PowerMat)
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
Steering Meeting of EuCARD
Steering Meeting of EuCARD
ALBA capabilities towards contributions to the FCC study
FCC-hh Machine Detector Interface
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
STFC Contributions to the FCC Study
Update on beam screen issues
Isotropic View Conceptual Design for MONALISA setup at CERN Magnet
CLIC damping rings working plan towards the CDR
Multiphysics simulations of impedance effects in accelerators
Novel Accelerator and Detector Systems
Presentation transcript:

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 WP4 Cryogenic Beam Vacuum 2 WP is coordinated by Study beam-induced vacuum effects Develop mitigation strategies for beam-induced vacuum effects Study beam stability at cryogenic temperatures Develop the design for a cryogenic beam vacuum system Build a prototype Measure the prototype at ANKA light source

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 WP4 ALBA team 3 Francis Perez Head of Accelerator Division WP4 Coordinator Carles Colldelram Transversal Section Head Engineering Division Task leader Raquel Monge Vacuum Group Leader Transversal Section Vacuum Project Engineer PhD Student Vacuum Project Engineer Under Selection process Joan Casas Head of Engineering Division Marcos Quispe Transversal Section Deputy Simulation Engineer

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 WP4 ALBA team experience 4 SynRad+ Synchrotron radiation power deposition Data Extraction and inserted to Ansys for thermomechanical simulations

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 WP4 ALBA team experience 5 MolFlow+ Vacuum profiles simulations & optimization

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 WP4 Cryogenic Beam Vacuum 6 WP Coordination (Francis Perez) Study beam-induced vacuum effects Develop mitigation strategies for beam- induced vacuum effects Study beam stability at cryogenic temperatures Develop the design for a cryogenic beam vacuum system Build a prototype Measure the prototype at ANKA light source CONCEPTUAL DESIGN CONSTRUCTION

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 WP4 Cryogenic Beam Vacuum 7 WP Coordination (Francis Perez) Study beam-induced vacuum effects For the final FCC machine For the prototype Build a prototype Measure the prototype at ANKA light source CONCEPTUAL DESIGN CONSTRUCTION With the studies for the FCC machine we will develop validation model With this model we will develop the prototype concept with the figures for this set up to compare with the final results The final results has to be analysed to figure out the reliability of the device

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 WP4 Vacuum Studies 8 Beam induced vacuum effects: FCC Prototyape Specs Gas density FCC current Functions Cases: Normal operation Cold Down Quench Boundary conditions: FCC Radiation ANKA Radiation CERN Technical Guidance Vacuum studyThermal Study Thermomechanical FCC Beam Screen validation Prototype validation

Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 Thanks for your attention