Operations Management Project Management Chapter 3.

Slides:



Advertisements
Similar presentations
3 Project Management PowerPoint presentation to accompany
Advertisements

WBS: Lowest level OBS: Lowest level
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Project Management Chapter 3 - Heizer.
Operations Management Project Management Chapter 3
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
Project Management Chapter 13
Prepared by Lee Revere and John Large
6. Project Management.
Project Management. Maintenance and Reliability 14 Aug 2001.
Project Management Techniques.
BA 333 Operations Management
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 3 3 Project Management PowerPoint presentation to accompany Heizer and Render Operations.
Operations Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Operations Management
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 3 3 Project Management PowerPoint presentation to accompany Heizer and Render Operations.
Roberta Russell & Bernard W. Taylor, III
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 13-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 13.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
3 Project Management PowerPoint presentation to accompany
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Lean Project Management
3 - 1© 2011 Pearson Education 3 3 Managing Projects PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall  Complex and temporary task of many related activities. (not ‘business as usual’)  May.
1 Project Management Seminar Project Scheduling. 2 Importance of Project Management Three Components of Project Management Project Evaluation and Review.
3 Project Management PowerPoint presentation to accompany
WEEK 4 Introduction to Project Management. Agenda Phase 2: Planning ◦ Communication Plan ◦ Scheduling Preparation  Build an AON Diagram  Determine Critical.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management Techniques
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
OPSM 301 Operations Management Class 18: Project Management: Introduction and CPM Koç University Zeynep Aksin
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
Prepared by Raida Al-Awamleh 1 Project Management Training Program June 24 th -28 th,2006.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 3 3 Project Management PowerPoint presentation to accompany Heizer and Render Operations.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Operations Management
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Operations Management
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Operations Management
Operations Management
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
Project Planning and Budgeting
3 Project Management PowerPoint presentation to accompany
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management CPM/PERT Professor Ahmadi.
3 Project Management PowerPoint presentation to accompany
Critical Path Method and Assignments for COLL
Presentation transcript:

Operations Management Project Management Chapter 3

3-2 Learning Objectives When you complete this chapter, you should be able to : Identify or Define :  Work breakdown structure  Critical path  AOA and AON Networks  Forward and Backward Passes  Variability in Activity Times

3-3 Learning Objectives - Continued When you complete this chapter, you should be able to : Describe or Explain:  The role of the project manager  Program evaluation and review technique (PERT)  Critical path method (CPM)  Crashing a project  The Use of MS Project

3-4 Management of Large Projects  Planning - goal setting, project definition, team organization  Scheduling - relating people, money, and supplies to specific activities and activities to one and other  Controlling - monitoring resources, costs, quality, and budgets; revising plans and shifting resources to meet time and cost demands

3-5 Planning l Objectives l Resources l Work break- down schedule l Organization Scheduling l Project activities l Start & end times l Network Controlling l Monitor, compare, revise, action Project Management Activities

3-6 Project Planning, Scheduling, and Controlling Project Planning 1. Setting goals 2. Defining the project 3. Tying needs into timed project activities 4. Organizing the team Project Scheduling 1. Tying resources to specific activities 2. Relating activities to each other 3. Updating and revising on a regular basis Time/cost estimates Budgets Engineering diagrams Cash flow charts Material availability details CPM/PERT Gantt charts Milestone charts Cash flow schedules Project Controlling 1. Monitoring resources, costs, quality, and budgets 2. Revising and changing plans 3. Shifting resources to meet demands Reports budgets delayed activities slack activities Before Project During Project

3-7  Establishing objectives  Defining project  Creating work breakdown structure  Determining resources  Forming organization Project Planning

3-8  Often temporary structure  Uses specialists from entire company  Headed by project manager  Coordinates activities  Monitors schedule & costs  Permanent structure called ‘matrix organization’ Project Organization

3-9 A Sample Project Organization Sales President Finance Human Resources Engineering Quality Control Production Technician Test Engineer Propulsion Engineer Physiologist Project Manager Psychologist Structural Engineer Inspection Technician Project 1 Project 2 Project Manager

3-10 A Sample Project Organization Sales Finance Human Resources Engineering Quality Control Production Test Engineer Propulsion Engineer Technician Project 1 Project 2 Project Manager Technician Project Manager Structural Engineer Inspection Technician President

3-11 Matrix Organization

3-12 The Role of the Project Manager Project Plan and Schedule Revisions and Updates Project Manager Project Team Top Management Resources Performance Reports Information regarding times, costs, problems, delays Feedback Loop

3-13 Work Breakdown Structure  1.Project  2. Major tasks in the project  3. Subtasks in the major tasks  4. Activities (or work packages) to be completed

3-14  Identifying precedence relationships  Sequencing activities  Determining activity times & costs  Estimating material & worker requirements  Determining critical activities Project Scheduling

3-15 Purposes of Project Scheduling  Shows the relationship of each activity to others and to the whole project.  Identifies the precedence relationships among activities.  Encourages the setting of realistic time and cost estimates for each activity.  Helps make better use of people, money, and material resources by identifying critical bottlenecks in the project.

3-16  Gantt chart  Critical Path Method (CPM)  Program Evaluation & Review Technique (PERT) Project Management Techniques

3-17 JFMAMJJ Time Period Activity Design Build Test Gantt Chart

3-18 Project Control Reports  Detailed cost breakdowns for each task  Total program labor curves  Cost distribution tables  Functional cost and hour summaries  Raw materials and expenditure forecasts  Variance reports  Time analysis reports  Work status reports

3-19  Network techniques  Developed in 1950’s  CPM by DuPont for chemical plants (1957)  PERT by Booz, Allen & Hamilton with the U.S. Navy, for Polaris missile (1958)  Consider precedence relationships and interdependencies  Each uses a different estimate of activity times PERT and CPM

3-20  Is the project on schedule, ahead of schedule, or behind schedule?  Is the project over or under cost budget?  Are there enough resources available to finish the project on time?  If the project must be finished in less than the scheduled amount of time, what is the way to accomplish this at least cost? Questions Which May Be Addressed by PERT & CPM

3-21 The Six Steps Common to PERT & CPM © Define the project and prepare the work breakdown structure, © Develop relationships among the activities. (Decide which activities must precede and which must follow others.) © Draw the network connecting all of the activities © Assign time and/or cost estimates to each activity © Compute the longest time path through the network. This is called the critical path © Use the network to help plan, schedule, monitor, and control the project

3-22 A Comparison of AON and AOA Network Conventions

3-23 Milwaukee General Hospital’s Activities and Predecessors ActivityDescriptionImmediate Predecessors ABuild internal components- BModify roof and floor- CConstruct collection stackA DPour concrete and install frameA, B EBuild high-temperature burnerC FInstall pollution control systemC GInstall air pollution deviceD, E HInspect and testF, G

3-24 AON Network for Milwaukee General Hospital Start A B C D F F G H Arrows show precedence relationships

H Inspect/Test G Install pollution control device D Pour concrete/ Install frame B Modify roof/floor C Construct stack F Install controls E Build burner AOA Network (With Dummy Activities) for Milwaukee General A Build internal components Dummy Activity

3-26  Provides activity information  Earliest (ES) & latest (LS) start  Earliest (EF) & latest (LF) finish  Slack (S): Allowable delay  Identifies critical path  Longest path in network  Shortest time project can be completed  Any delay on critical path activities delays project  Critical path activities have 0 slack Critical Path Analysis

3-27  Begin at starting event and work forward  ES = 0 for starting activities  ES is earliest start  EF = ES + Activity time  EF is earliest finish  ES = Maximum EF of all predecessors for non- starting activities Earliest Start and Finish Steps

3-28  Begin at ending event and work backward  LF = Maximum EF for ending activities  LF is latest finish; EF is earliest finish  LS = LF - Activity time  LS is latest start  LF = Minimum LS of all successors for non- ending activities Latest Start and Finish Steps

3-29 Latest Start and Finish Steps Latest Finish ES LS EF LF Earliest Finish Latest Start Earliest Start Activity Name Activity Duration

3-30 Critical Path for Milwaukee General Hospital Start A B C D F F G H Arrows show precedence relationships

3-31 AON Network for Milwaukee General Hospital Includes Critical Path Slack=0 Start A B C D F F G H H H G H F H C H E H D H B H A H Slack=0 Slack=6 Slack=1 Start

3-32 Gantt Chart Earliest Start and Finish Milwaukee General Hospital A Build internal components B Modify roof and floor C Construct collection stack D Pour concrete and install frame E Build high-temperature burner F Install pollution control system G Install air pollution device H Inspect and test

3-33 Gantt Chart Latest Start and Finish Milwaukee General Hospital A Build internal components B Modify roof and floor C Construct collection stack D Pour concrete and install frame E Build high-temperature burner F Install pollution control system G Install air pollution device H Inspect and test

Fdn & frame 1-3 Buy shrubs 2-3 Roof 2-4 Interior work 3-4 Landscape Activity Build House Project Gantt Chart Latest Start and Finish

3-35  3 time estimates  Optimistic times ( a )  Most-likely time ( m )  Pessimistic time ( b )  Follow beta distribution  Expected time: t = ( a + 4 m + b )/6  Variance of times: v = ( b - a ) 2 /6   PERT Activity Times

© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J  Expected project time ( T )  Sum of critical path activity times, t  Project variance ( V )  Sum of critical path activity variances, v Used to obtain probability of project completion! Project Times

3-37 © 1995 Corel Corp. PERT Probability Example You’re a project planner for General Dynamics. A submarine project has an expected completion time of 40 weeks, with a standard deviation of 5 weeks. What is the probability of finishing the sub in 50 weeks or less?

3-38 T = 40 s = 5 50X Normal Distribution Z XT = - = - = s m z = 0 s Z = 1 Z 2.0 Standardized Normal Distribution Converting to Standardized Variable

3-39 m z = 0 s Z = 1 Z 2.0 Z : ::: Standardized Normal Probability Table (Portion) Probabilities in body Obtaining the Probability

3-40 Variability of Completion Time for Noncritical Paths  Variability of times for activities on noncritical paths must be considered when finding the probability of finishing in a specified time.  Variation in noncritical activity may cause change in critical path.

3-41 Factors to Consider when Crashing  The amount by which an activity is crashed is, in fact, permissible.  Taken together, the shortened activity durations will enable one to finish the project by the due date.  The total cost of crashing is as small as possible.

3-42 Steps in Project Crashing  Compute the crash cost per time period. For crash costs assumed linear over time:  Using current activity times, find the critical path  If there is only one critical path, then select the activity on this critical path that (a) can still be crashed, and (b) has the smallest crash cost per period. Note that a single activity may be common to more than one critical path  Update all activity times.

3-43 Crash and Normal Times and Costs for Activity B

3-44 Cost-Time Curves Used in Crashing Analysis

3-45 Advantages of PERT/CPM  Especially useful when scheduling and controlling large projects.  Straightforward concept and not mathematically complex.  Graphical networks aid perception of relationships among project activities.  Critical path & slack time analyses help pinpoint activities that need to be closely watched.  Project documentation and graphics point out who is responsible for various activities.  Applicable to a wide variety of projects.  Useful in monitoring schedules and costs.

3-46  Assumes clearly defined, independent, & stable activities  Specified precedence relationships  Activity times (PERT) follow beta distribution  Subjective time estimates  Over-emphasis on critical path Limitations of PERT/CPM