50% LBNE Concept Design WCD Infrastructure. Mechanical.

Slides:



Advertisements
Similar presentations
Valley City State University | Facilities Services
Advertisements

Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Presented April 16, 2009 at the ACG Annual Meeting in Chicago, IL. GAYLON RICHARDSON Engineered Air Balance Co., Inc. Houston, Texas 5/7/20151.
Michigan Department of Licensing and Regulatory Affairs Bureau of Construction Codes.
The Life Safety Surveyor Facility Tour
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
LNG Hazards.
WELCOME DBI & SFFD Meet the Pros October 11, 2007.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Technology in Architecture Lecture 12 Electrical Equipment Electrical Power Management Fire Protection Systems Lecture 12 Electrical Equipment Electrical.
Business Owners and Managers and the Fire Code
Central Region Discussion Power and Cooling GDE Beijing-CFS.
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
N O R T H A M E R I C A C O M M E R C I A L TDP
Fire Safety By Alicia Civile and Alexandra Fernandez.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Code Analysis: Don’t try this at home. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Associated detection/extinction systems D. Swoboda.
Fire Protection Systems Chapter 6. Fire Protection Systems Most of the time you will work with an electrical engineer or fire-protection designer to coordinate.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Chapter 6 ID 234 Building Codes Fire Suppression.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
Hot /Cold Aisle Containment  Traditional Data Center/Telco designs are changing significantly!
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
DRAFT US Department of Energy Underground Fire Protection Guide James Priest, PhD & James Niehoff DGS-SEE Seminar on Fire Protection for Physics Research.
Long-Baseline Neutrino Facility LBNF Far Site CF Scope Joshua Willhite Logistics Workshops August 11-13, 2015.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
West Cambridge Data Centre Ian Tasker Information Services.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
50% LBNE Concept Design LAr Infrastructure. Mechanical.
Long-Baseline Neutrino Facility LBNF Far Site CF Scope Joshua Willhite Interface and Logistics Workshops August 10-12, 2015.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Dell EMC Modular Data Centers
Update on the PSB Cooling and Ventilation Systems
CBETA Technical Review
Americas KlyCluster Cost Analysis Overview
COOLING & VENTILATION INFRASTRUCTURE
Wilson Hall Fire Protection Features
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
M&E SYSTEM.
Technology in Architecture
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Presentation transcript:

50% LBNE Concept Design WCD Infrastructure

Mechanical

3 WCD HVAC Large cavity and access drift cooled by 65 F drift air Once through system 100,000 cfm airflow Set by smoke extraction requirements 100,000 cfm results in ~10F temperature rise during normal operation VFD’s may be justified, however there are added costs No humidity control with once through system

4 WCD HVAC 2 x 100% exhaust fans for normal and emergency ventilation Exhaust fans located in 626 drift exhausting to east drift Davis cavern chilled water system left as is AORs air conditioned by local DX units Utility rooms including electrical cooled with drift air No spray chamber etc. Chiller by LBNE

5 WCD HVAC Cool Warm

Plumbing

7 WCD Plumbing & Fire Protection Services Potable water Purified water (50% size 8” per LBNE direction) Fire fighting water (redundant service from Yates and Ross shafts) 50% design assumes industrial water is currently provided to the 4850L (item for discussion) Drainage system Sewage Removal for the main AORs Valved and capped connection to a water mist system at the WCD. Compressed air, provided locally in LBNE’s equipment room.

8 WCD Plumbing Schematic

9 WCD Purified Water Schematic

Electrical

11 ITEMELECTRICAL CONNECTED LOAD NOTES LC Water (PMT-HV)3kWBased on May 13, 2011 RFP Table LC-Deck100kWBased on May 13, 2011 RFP Table LC-Balcony69kWBased on May 13, 2011 RFP Table Crane6kW Total Estimated Detector Power 178kW With 20% Uncertainty factor 214kW20% based on LBNE requirements ITEM ELECTRICAL CONNECTED LOAD NOTES Detector Lighting – assuming 1w/sq.ft 32kW Drift Lighting – assuming.5w/sq.ft 45kW Chiller Plant – assuming 3 Tons 5kW This assumes the 140 Ton chiller electrical requirements by LBNE is already included in Table of the May 13, 2011 RFP. Air handling Units30kW Water System431kW Based on May 13, 2011 RFP Table Sump 5060 Level for experiment 254kW Based on May 13, 2011 RFP Table Sump Pump for 4850 level drainage system 156kW Utilities in Drift75kW Based on May 13, 2011 RFP Table AORs – anticipate total load450kW Based on 100% PDR typical AOR information. Fire alarm2kW Communication12.5kW Security (future place holder)12.5kW Total Infrastructure Power1505kW 20% Spare factor1806kW Total Load – Detector + Infrastructure 2020kWIncludes 20% spare factor Total Load assuming.9 Power Factor 2244kVA WCD Experiment Electrical Loads WCD Infrastructure Electrical Loads WCD Electrical Connected Loads

12 ItemEmergency/Standby Connected Load Drift Lighting45kW WCD Chamber Egress lighting8kW AORs315kW Sump Pump109kW Fire Alarm1.5kW Security15kW IT System11kW Total Connected Electrical Load505kW WCD Emergency/Standby Electrical Load

13 WCD Infrastructure Other Levels and Ramps (OLRs)

14 Shaft Cables

15 WCD Lighting

16 WCD Drift Lighting

17 WCD Lighting

18 WCD 12kV Electrical Distribution

Communications

20 Scope of Work at WCD Structured Cabling System - ICT Enclosures and Pathways - Backbone Distribution - Horizontal Distribution Communications System - Extend existing analog phone system - Extend existing radio system Extend existing Data Network

21 REDUNDANT BACKBONE STRAIN RELIEF LOOP EXISTING COMMUNICATIONS ROOMS AT THE SURFACE CEs IN WEST DRIFT CEs NEAR WCD WCD Option

22 2-Way Radio Coverage

23 Pathway Supports and Enclosures Communications Enclosure Dimensions vary from: 24” x 24” x 36” to 24” x 24” x 60” Communications Distribution Enclosure Dimensions: 24” x 24” x 72”

Fire Protection

25 Life Safety Codes Standards - IBC Referenced NFPA Codes and Standards - NFPA 520 – Standard on Subterranean Spaces - Variances ADA - As per DUSEL ADA Policy July “…recognizing that DUSEL is a unique facility with special hazards and construction challenges, portions of DUSEL will not be accessible…” Variances will be necessary

26 WCD Fire Safety 91 Occupants Exit via Ross and Yates Shaft or to AORs Barriers to separate out adjacent mine areas - 4 hour barrier to AOR and experiment cavity - 2 hour any other openings to drift - 2 hour for cross drift AORs to limit travel distance to 2000 feet - 96 hour duration - Shaft AORs sized for 91, others 10

27 WCD Fire Safety Suppression - Sprinklers in West drift and occupied spaces - Standpipe throughout west drift and occupied spaces - Redundant water supply 100,000 cfm for smoke control discharged to east drift Emergency lighting throughout occupied areas

28 Fire Alarm System shall consist of: Manual Pull stations Combination speaker/strobe lights Water flow/tamper switches Aspirated Air Sampling w ith gas monitor modules WCD Fire Alarm

29 Life Safety

30 91 person AOR 4 hour separation 4 hour separation to WCD cavern 2 hour separation to other unoccupied areas 2 hour shaft separation 4 hour AOR separation Life Safety

31 Airlocks

32 Airlocks