RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
WinDS-H2 MODEL Wind Deployment Systems Hydrogen Model Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower Walter Short Nate Blair.
GPA Renewable Energy Resource for Guam Power Authority
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Technical Conference Avoided Cost Modeling January 6, 2015.
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Mexico’s experiences with Wind Energy Clean Energy, Good Governance and Electricity Regulation Cape Town, Cape Milner Hotel Thursday 20 th May, 2010 Francisco.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Hydrology Days 2004 Applied Stochastic Hydrology Lessons Learned from the Brazilian Electric Energy Crisis of 2001 Jerson Kelman President of ANA (Brazilian.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Understanding the key technical and economic concepts Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18, 2010, Pune,
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Dealing with Green Power Intermittency in the Mexican Electrical Sector Jorge M. Huacuz Non-Conventional Energy Unit Electrical Research Institute Mexico.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
El Gallo Hydroelectricity Project PDD Analysis
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
BELIZE ELECTRICITY LIMITED Electric System Presentation January 8, 2014 Rolando Santos Senior Manager, System Planning and Engineering & Kevin Longsworth.
Ahmed Kaloko, Ph.D. Director Bureau of Conservation, Economics & Energy Planning Harrisburg PA COMPARISON OF PJM-ISO WITH CALIFORNIA-ISO Pennsylvania.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
RENEWABLES AND RELIABILITY
Damitha Kumarasinghe Director General
GENESYS Redevelopment Strawman Proposal
Growth in electricity generation over time
Sustainable Energy Planning for Autonomous Power System of Crete
Economic Operation of Power Systems
Flexible Forward Contracts for Renewable Energy Generators
EU-IPA12/CS02 Development of the Renewable Energy Sector
Additional clarifications on economic and adequacy running hours
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
GENESYS Current Functionality
Planning Reserve Margin
Presentation transcript:

RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission

Generation Planning Perspective - Historic Demand and Energy Demand Growth 4.34% PA Net Gen Growth 5.3% PA LF Improved 67% to 73.5% Losses Maintained approx. 12%

Generation Planning Perspective - Sources of Generation 2012 Observations Low Hydrology Year – 15% below average Generation From Bagasse also Low by 15% Prices from Mexico Higher than expected by 30% at average US$ 0.18/KWh

Generation Planning Perspective - Demand and Energy Forecast done by SIEMENS 2009 LCEP Study SIEMENS Methodology Forecast Period 2007 to 2028 Regression with GDP and Population – Full system Zone Forecast based on historical regression Consideration of additional Special Customers

Generation Planning Perspective - Demand Forecast for Generation Planning PUC – (Growth:- Lo – 1.5% - Expected – 4% - Hi – 6.5%) Year Units BEL System Maximum Demand MW % Low Forecast % Medium Forecast % Hi Forecast

Generation Planning Perspective - Planning Criteria LOLP – Loss of Load Probability The expected value of the number of days in a year in which the available generation cannot supply the system peak load. There are many ways to calculate this indicator, some more accurate than others. Percent Reserve The reserve Generation (positive or negative) as a percentage of annual peak demand There is correlation between these 2 indicators for a particular Power System For BEL’s Grid system - LOLP of 3 days/year equivalent to approximately 30% Reserve LOLP usually gives medium to long term performance of Generation System. Short term usually different. For BEL’s Grid System 2013 there were outages but no cases of outages due to lack of generation

Generation Planning Perspective - Generation Requirements

Generation Planning Perspective - Observations  Median Forecast (4% per annum) used to determine Generation additions  Initial period shows generation reserves as inadequate <30%  Earliest addition possible assumed to be in 2016  Consideration of in-country sources very important  Percent reserve of -10% to be maintained  This allows System Generation + Self-Generation of customers to meet demand

Generation Planning Perspective - Candidate Units Firm Power – RFPEG2013 Firm Power – Least Cost Expansion Plan to be developed (Dispatch Simulation Exercise) 60 MW over the period from 2013 to 2023 Eligible Bids/Proposals under RFPEG2013 become candidate Units Hydro With storage and effective Firm capacity Located on the Macal River – Challilo Dam provides storage Located on other Rivers – Needs Storage Thermal Diesel/HFONatural GasCoal/LPG??? Dedicated contracts with plants in Mexico - Wheeling

Generation Planning Perspective - Other Candidate Units – RFPEG2013 Bio-mass bagasseCohune Nuts Other Sources – Grass etc. Energy Efficiency – Not a part of RFPEG2013 – GOB initiative Lighting/Roadway Lighting Air-conditioning Water Heating

Generation Planning Perspective - Evaluation Firm Power under RFPEG2013 Firm Power Bids Received to be analyzed to ensure responsiveness and feasible and ranked based on evaluation criteria Then used in a 15 Year planning dispatch simulation exercise to satisfy Grid Generation Reserve Requirements and minimize the Cost of Power (Total Capacity plus Energy Costs for the 15 Year period) Existing Power Supply contracts must be taken into account The flexibility of Dispatch and price of proposals shall ultimately determine the success of proposals Negotiations to be held with bidders whose proposals are a part of the 15 Year Least cost generation plan

Generation Planning Perspective - Candidate Units Intermittent Power – RFPEG2013 Consideration of non-firm RE sources after Firm Power Analysis - Solar/Wind/Run-of-River Hydro/Etc. Grid Power System variable cost to be considered displaced when RE dispatched Identification of opportunities to further lower Generation Cost by addition of RE intermittent sources Commitment to add 15 MW over the period 2013 to 2023 at lowest possible cost Solar with/without Mexico Intermittent – phased in System problems if too much > 15% of peak demand. CFE ? Tracking/No TrackingJICA experience for CF – 16% Wind – with/without Mexico Intermittent – phased in System problems if too much > 15% of peak demand. CFE ? Source/Methodology to determine Wind speed characteristics to be declared

Generation Planning Perspective - Evaluation Intermittent Power under RFPEG2013 Non-Firm Power Bids Received to be analyzed to ensure responsiveness and feasible and ranked based on evaluation criteria Then used in a 15 Year planning dispatch simulation exercise assuming the displacement of generation variable costs Existing Supply contracts must be taken into account The set of non-firm projects totaling 15 MW over the period 2013 to 2023 with LOWEST COST shall be considered for negotiations

Generation Planning Perspective - Grid Interconnection Costs & Transmission Strengthening Grid Interconnection will be required for ALL Projects BEL to provide Estimates to be added to proposal costs Transmission System Reinforcement If needed the BEL to cost for addition to proposal cost In some cases Transmission reinforcement is only accelerated In the case of acceleration only accelerated cost will be added to proposal

Generation Planning Perspective - Potential additional opportunities outside the country of Belize For such projects developer to identify market Developer responsible to get PPA with external parties Developer to negotiate wheeling with BEL/PUC if feasible GOB may assist PUC/BEL not responsible market prices or failure No price transfer shall occur under any circumstances to Belize Electricity customers

Generation Planning Perspective - CFE Mexico Dispatch 2013 to 2023 – The way we see it

Generation Planning Perspective - Belize/Mexico – Long Term Relationship CFE Mexico will remain important to the Belize Power System Spinning Reserve ServiceAbsorb VARs during Light Load periodsStatic VAR Compensator – Voltage Control Frequency Control/System Black Start/Emergency Energy sales/Low cost energy sometimes