Data Center Solution- P. PERRIN – October 2012 DATA CENTER Integrated solution P. PERRIN.

Slides:



Advertisements
Similar presentations
Contents: Cover
Advertisements

Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Company Presentation. Triple-T at a glance Founded in 1994 Providing end-to-end solutions: expertise and certifications in a wide range of disciplines.
Thermostats, Pressure Switches, and Other Electric Control Devices
Lineage Power - Total Efficiency TM Smart Grid A Telecom / Commercial consumer’s perspective Paul Smith – Technical Marketing Manager, Lineage Power
Smart Office Automation Solutions
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
Cooling Product Positioning
Standardization in the Green Buildings field Overall energy performance of buildings Dick (H.A.L.) van Dijk, Senior Scientist at Netherlands Organisation.
InfraStruxure for Small IT Spaces Solution Introduction.
Efficient flexibility in room management with SAUTER EY-modulo.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
Avaya Data Solutions for SME. ©2010 Avaya Inc. All rights reserved. 2 2 Avaya’s Unique Value Proposition  Up to 7X better resiliency  100% Call Completion.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Copyright Green Revolution Cooling
Solar Home UPS 850VA & 1400VA India’s first Sine wave inverter with in built Solar Charge Controller and Controlled DC Load Output. Simultaneous Charging.
Schneider Electric IT Business North America Advancing Date Centers around Life Cycle Management. May 2011.
A Connected World in transformation NICE – DATACENTRES 2012 May 23 rd 2012 Paul-François CATTIER Global Data Centre Solution VP.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
EMC Proven Professional. Copyright © 2012 EMC Corporation. All Rights Reserved. EMC Proven Professional INFORMATION STORAGE AND MANAGEMENT V2 Course Introduction.
The PV industry challenge of reaching grid parity
Air Conditioning and Computer Centre Power Efficiency The Reality Christophe Martel Tony Cass.
Emerson Network Power Datacenter Infrastructure Solutions for Business Critical Continuity Many Needs, One Answer. May 28 th 2010.
Mission Energy: Energy Efficient Cooling How Data Centre energy consumption and operating costs can be significantly reduced through readily available.
Introduction to EMC.  Data Centre physical infrastructure specialist  Technical environment M&E.
What is Green Technology? Green Technology is making environment friendly products. It uses recyclable components based on other models. Green Technology.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
 Cloud computing is the use of computing resources (hardware and software) that are delivered as a service over a network (typically the Internet). 
Schneider Electric’s Measurement & Verification Panels with Energy Insight.
Life cycle services for automation products
Nikhef/(SARA) tier-1 data center infrastructure
1 Rittal/ Kipping/ October 14, 2015 Making a green profit – Sustainable Investments. London, October 14, 2015 Martin Kipping Director International IT.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
Energy-Efficient Infrastructure Management in the IoT era Presented by: George Dritsanos, IT BU VP for Greece, Cyprus & Malta.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Digital Ecosystems Re-tuning the user requirements after 3 years Digital Ecosystems Re-tuning the user requirements after 3 years Towards Business Cases.
Optimizing Power and Data Center Resources Jim Sweeney Enterprise Solutions Consultant, GTSI.
WAVECOM©2005. All rights reserved 1 Intelligent Device Management Service Offer Emmanuel Walckenaer April Lisboa.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
Analysis and Forming of Energy Efficiency and Green IT Metrics Framework for Sonera Helsinki Data Center HDC Matti Pärssinen Thesis supervisor: Prof. Jukka.
Taking your Business Technology Further. First Communications: At A Glance Technology Provider since 1998, serving thousands of Businesses throughout.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
I-RACH range I-RACH range I-RACH range I-RACH range High efficiency air/water heat pump with INVERTER scroll compressor Range Modularity Components Highlights.
A smart grid delivers electricity from suppliers to consumers using two-way digital technology to control appliances at consumers' homes to save energy,
Free Air Cooling for Data Centres
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Chapter 6: Securing the Cloud
12 good reasons to buy an ABB TrafoStar™ transformer
WELCOME Indoor Chillers.
in Smart Metering Solutions
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
True modular UPS system for critical applications
WELCOME Indoor Chillers.
Cloud Consulting Services and Solutions
Title RTWD Water-Cooled Chillers subtitle START
Data Centre Environment
Modular Edge-connected data centers
فایل ارائه حاضر توسط مرکز تحقیقات درایران « اینترنتی از اشیاء» فناوری
The smart choice for demanding motor switching
Modular Edge-connected data centers
Gustavo Rau de Almeida Callou
Modular Edge-connected data centers

OU BATTLECARD: WebLogic Server 12c
Presentation transcript:

Data Center Solution- P. PERRIN – October 2012 DATA CENTER Integrated solution P. PERRIN

Data Center Solution- P. PERRIN – October 2012 WHAT’S HAPPENING ON INTERNET DURING 60 SECONDES

Data Center Solution- P. PERRIN – October 2012 PERFORMANCE & RELIABILITY AT THE HEART OF DATA CENTERS -Fast growing demand: - Cloud Computing - Social network - Big data - Uninteruptible services - Reconfiguration installation - Monitoring

Data Center Solution- P. PERRIN – October 2012 The efficient urbanisation of data centers requires dedicated technical solutions. Installing an entire range of products from the same brand provides a high level of security. DATA CENTERS CONCENTRATED EXPERTISE Movie

Data Center Solution- P. PERRIN – October 2012 BUSINESS CONTINUITY One-stop shop to provide complete solution for your project. A network of carefully selected partners DATA CENTERS CONCENTRATED EXPERTISE DAILY SUPPORT, A SPECIALIST DESIGN OFFICE, PRESENTATIONS AND TRAINING PROVIDED BY PROFESSIONALS. TECHNICAL GUIDES AND SOFTWARE FOR DIMENSIONING INSTALLATIONS

Data Center Solution- P. PERRIN – October 2012 THEY HAVE ALREADY TRUSTED TELECOM ITALIA

Data Center Solution- P. PERRIN – October 2012 ENERGY EFFICIENCY Direct impact to the PUE of the Data center DATA CENTERS ENERGY EFFICIENCY Legrand is part of the Green Grid

Data Center Solution- P. PERRIN – October 2012 Transformer A complete range of Dry transformers with reduced losses Dry-type transformers combine optimized electrical energy consumption Low environmental impact to offer a reliable, energy-efficient solution Suitable for any installation until kVA Reducing loss, high efficiency Reduce maintenance costs. DATA CENTERS ENERGY EFFICIENCY

Data Center Solution- P. PERRIN – October 2012 Mesure Real-time analyzers of electrical network parameters and remote metrics feedback: Quality analyzers help users to act fast and deal with problems early. DATA CENTERS ENERGY EFFICIENCY

Data Center Solution- P. PERRIN – October 2012 DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE Power (6,300 A) Transformers, busbars, UPS, capacitor banks

Data Center Solution- P. PERRIN – October 2012 Cabinets Legrand XL3 rigid cabinets provide a high level of requirements from 160A to A The full range of Legrand protection equipment delivers an efficient and powerful solution against electrical faults anywhere in the installation. DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE

Data Center Solution- P. PERRIN – October 2012 From 630 à 5000A From 60 à 630 A From 16 to 60 A Reliability, flexibility, and usability: busbar systems provide fully safeguarded electrical power delivery and distribution to commercial buildings. DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE

Data Center Solution- P. PERRIN – October 2012 DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE

Data Center Solution- P. PERRIN – October 2012 Display, mesure, pilote your application DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE

Data Center Solution- P. PERRIN – October 2012 SUPERVISION Manage diagnostics, power cuts, follow the energetic profiles, plan stages of maintenance… The Legrand i supervision system is based on Bus RS485 and IP mode DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE

Data Center Solution- P. PERRIN – October 2012 DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE cabling systems (up to Cat. 6A, High Density solution), containment,. Legrand provides the high level of durability and performance necessary for data center installations.

Data Center Solution- P. PERRIN – October 2012 LCS 2 : High Density Maximum connections in minimum space 45U fully available for connections (with patch cord management from the sides) DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE of useful load To accommodate the most sensitive equipment from Data centers and Computer rooms 675 kg

Data Center Solution- P. PERRIN – October 2012 Patch panel solutions RJ45 Patch Panel CAT 6A or 6 Integrated cord management For Data centers and Server rooms with high density requirements MTP/MPO Solution: Ultra High Density Up to 120 fiber per U DATA CENTERS CONCENTRATED EXPERTISE SUPERIOR PERFORMANCE LCS 2 : High Density

Data Center Solution- P. PERRIN – October 2012 ENERGY MANAGEMENT PRECISE COOLING SOLUTION DATA CENTERS CONCENTRATED EXPERTISE Movie Cold Corridor Movie Cold Corridor

Data Center Solution- P. PERRIN – October 2012 DCs are professionalizing New Dimensions in Data Centre Design 1.Distinguish 2.Manage your processes 3.Use of Flexible and Modular Solutions 4.Energy reduction How to integrate these aspects into a professional Data Centre?

Data Center Solution- P. PERRIN – October 2012 Operational Excellence New Dimensions in Data Centre Design Optimal Performing Data Centre process of professionalizing Operational Excellence Data Centre Today People: IT-(end)users Technology Market/ competition Environment/ sustainability

Data Center Solution- P. PERRIN – October 2012 Operational Excellence Is about optimizing:processes, products and costs New Dimensions in Data Centre Design

Data Center Solution- P. PERRIN – October 2012 The future?  Examples of Operational Excellence?  Yes/No, because it’s not all about green field solutions New Dimensions in Data Centre Design

Data Center Solution- P. PERRIN – October 2012 The unruly reality Nice green field concepts are not always applicable: Unruly now and unruly in the future! How do we cope? New Dimensions in Data Centre Design Upgrade an existing DC Fixed to a certain location Physical constraints

Data Center Solution- P. PERRIN – October 2012  Acknowledge different perspectives/stakeholders  Operational Excellence seeks for the right balance New Dimensions in Data Centre Design DC Design Financial perspective Financial perspective Commercial perspective Technical perspective Sustainable perspective How to achieve Operational Excellence

Data Center Solution- P. PERRIN – October 2012  Select right level of modularity:  Stay up to date with the latest technologies.  Minkels (So Legrand Group) is involved in:  Endorser Code of Conduct  NEN  CENELEC, TC215 WG3  IS JTC1 study group EEDC New Dimensions in Data Centre Design How to achieve Operational Excellence

Data Center Solution- P. PERRIN – October 2012 The volumetric dimension Importance of cooling? - Big energy-consuming part - Control behaviour crucial - Major contributor to successful DC operation/reliability. - Strong correlation with building architecture New dimensions in Data Centre Design Typical power consumption in a non optimized DC

Data Center Solution- P. PERRIN – October 2012 Why use m 3 instead of m 2 ? - Improves selection process - To get the most efficient and reliable solution - ‘thermodynamical’ correct solution - Reliable working conditions - Or else  New Dimensions in Data Centre Design The volumetric dimension

Data Center Solution- P. PERRIN – October 2012 Key principles: -Separating hot and cold aisles: Advantages: - Easy and cheap way of improving energy efficiency: -Up to 30% savings -Proven technology (Minkels launch CEBIT 2006 ) New Dimensions in Data Centre Design The volumetric dimension

Data Center Solution- P. PERRIN – October 2012 Key principles: - Air balancing between CRAC and cabinet fans to minimize energy consumption - Separation of hot and cold air - Hot air extraction Advantages: - Rack individual control (close control) - Comfortable working environment New Dimensions in Data Centre Design The volumetric dimension

Data Center Solution- P. PERRIN – October 2012 Key principles: - Air-to-water heat exchanger - Secondary cooling circuit close to equipment Advantages: - High densities in small places - Close control - Wide cooling range combined with cold corridor New Dimensions in Data Centre Design The volumetric dimension

Data Center Solution- P. PERRIN – October 2012 How to reduce complexity? 1. Map available m 3 and required kW 2. Evaluate local outdoor climate conditions 3. Design cooling: keep in mind;  Minimize the number of heat transfers  Optimize air paths for least resistance Resulting in minimal/no compressor hours. Reducing complexity will lead to: - Energy reduction - Ease of installation - Higher level of flexibility and reliability New Dimensions in Data Centre Design Reduction of complexity COMPRESSOR FREE COOLING

Data Center Solution- P. PERRIN – October Provider of Global Solution for Server Rooms –Start from Customer needs –Complete solution – Each solutions are specific DATA CENTERS CONCENTRATED EXPERTISE

Data Center Solution- P. PERRIN – October 2012 Complete solution for Server rooms ex: Swisscom 34 Hot corridors tunels Rack Monitoring : cooling & Power DCIM Power Monitoring Cooling Monitoring + DATA CENTERS CONCENTRATED EXPERTISE

Data Center Solution- P. PERRIN – October 2012 Complete solution for Server rooms ex: Edison 35 Cold corridors DATA CENTERS CONCENTRATED EXPERTISE

Data Center Solution- P. PERRIN – October 2012 Conclusion -DCs need to further professionalize -The reality is unruly, one size does not fit all -Initial design is key for an Operational Excellent Data Centre. The following principles will achieve Operational Excellence: 1.Think in m 3 instead of m 2 2.Reduce the complexity of the design 3.Choose intelligent components for integration 3 DATA CENTERS CONCENTRATED EXPERTISE

Data Center Solution- P. PERRIN – October 2012 AT YOUR SERVICE THROUGHOUT THE WORLD Legrand is on hand to provide meticulous guidance and support from the initial idea right up to implementation and operation. At each stage in the design of your data center project, Legrand has a certified network of partners to guide you along the way, who can provide you with technological expertise and thesupport you need around the clock. Pascal PERRIN Group Business Developer – Data Center

Data Center Solution- P. PERRIN – October 2012