GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:

Slides:



Advertisements
Similar presentations
Company Name Here Partners’ names here.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Organizational buying behavior Presentation created by Mag. Maria Peer based on the lecture BBM1 – Marketing Mag. Andreas Zehetner FH Steyr.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Security Equipment RAF/2012/00042 Compulsory Briefing Session 15 April 2013 RAF – Centurion - GP.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
BE-BI camera projects HS, SB, EB March outline New digital cameras New rad-hard cameras (vidicon replacement)
Doing business with CERN Anders Unnervik 3 November 2014.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
GOVERNANCE AND ETHICS FOR THE BUILT AND NATURAL ENVIRONMENT Ethical Challenges in the Built and Natural Environment Sector and the Role of Professionals.
Appendix 8b. PUBLISHED STANDARDS RELATED TO OUR ACTIVITY.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
CALLS FOR TENDER AND MARKET SURVEYS - ROLES AND PROCEDURES L.ANNILA, K.FORAZ PART 2. ROLE OF THE COMITE DE LECTURE.
Your Business Name Business Plan. 1.1 Product Overview.
Doing business with CERN Anders Unnervik Ankara 5 October 2015.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
Ministry of Economy, Energy and Tourism 1 OP Competitiveness Progress of Implementation 2010.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 29/06/12R. Fortin PH-DT-DI1 Procurement of the 10TBq 137.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
Office of Procurement Services.  Vendor Application Website: 
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
HP SURVEY INSTRUMENT CALIBRATION AND SELECTION PRINCIPLES OF RADIATION DETECTION AND QUANTIFICATION January 13 – 15, 2016 TECHNICAL MANAGEMENT SERVICES.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
Status of n_TOF Facility
Doing business with CERN Anders Unnervik 20 May 2014.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 25/07/12 Project #4R. Fortin PH-DT-DI1 Status of procurement:
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 1 / 10 Upgrading to a GIF++
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Procurement of the 10TBq 137Cs Source, Irradiator and Filters GIF 137Cs at start: 740 GBq Other characteristics of 137 Cs remain: Half-life: y Beta.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
High Energy Neutron and Proton Irradiation Facilities at TSL Alexander Prokofiev, , 6th LHC Radiation Workshop 1.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
The Next Generation of a Gamma Irradiation Facility GIF++
ESS Innovation Procurement Workshop
Rachel Margraf Supervisor: Nikolaos Charitonidis
Next Step & Time plan Marcello Losasso, CERN
An extensive aging study of bakelite RPC
Purchasing supplies at CERN
Irradiation Facilities Questionnaire
EP Experiments safety validation process Safety Permits
CERN Testbeam facilities
Low temperature chiller Market Survey
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Presentation transcript:

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement: Market Survey documents are done: ( Tech. Questionnaire / Tech. Description / Tech. Specifications ) Criteriae were defined to select ONE firm capable: -to supply the complete Irradiator with the 16.6 Tbq 137 Cs source, -to install, train, perform annual and short notice service calls, -to dismantle the new irradiator at the end of the service life in addition to the dismantling of our present irradiator BA102. Market Survey procedure: -The Budget code was granted -The Departmental Request was issued -We expect the Mandatory Start-Up meeting in the coming days.

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI2 What next? Market Survey provides a selection of possible suppliers for the equipment and services as described in the Technical Description and Qualification documents. Call for tender is then published for the GIF++ Irradiator, and a « Quick Tendering procedure » becomes possible in parallel for another project having similar requirements.

22/08/12 Project #5R. Fortin PH-DT-DI3 GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group In fact, we are down here

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI4 Vertical attenuator: preliminary design… Source Muon Beam pipe Spherically corrected lead filters Irradiator Upstream unfiltered flux Downstream Filtered Photon flux

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI5 Achievable attenuation values: Proposed vertical combination 100/1/10 * 50/1/2 * 20/1/5 1; 2; 5 10; 20; 40; ; 200; 250; 400; ; 2000; 2500; 4000; ; Existing horizontal combination 100/1/50 * 20/1/10 * 5/1/2 1; 2; 5 10; 20; 40; ; 200; 250; ; 2000; 2500; 4000; :1 500:1

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI6 RATIO1:n LENSSlide1A1B1C2A2B2C3A3B3C Pbmm RATIOmm 1 0 * * * 2 7 * * * 5 15 * * * * * * * * * * ** * * * * * * * * * * * * * ** ** * * * * * * * ** * * ** * * * ** * * * * * * *

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI7 Filter 0 protecting the main collimator 28° 14° Area no longer used

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI8 We need to agree on the manufacturing process of the filters MouldedMachinedSheet material or 

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI9 Pb attenuation filters Field correction filter 0

GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI10 The hatched area represents 800 x 400 cm.