Summary: Working Group on Instrumentation Wim Blokland ORNL / SNS Manfred Wendt Fermilab 11/22/2008Summary: Project X Instrumentation WG 1.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Ribbon Electron Beam Profile Monitor For Bunched Beam Tomography Muons, Inc. Innovation in research.
Novel Beam Diagnostics on PXIE Vic Scarpine, FNAL 2nd Annual PASI Meeting April 3-5, 2013.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILC Controls & Instrumentation R&D Activities at Fermilab G. Tassotto, M. Votava, M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, U.S.A.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012.
ORNL is managed by UT-Battelle for the US Department of Energy SNS Beam Diagnostics: Ten Years After Commissioning A. Aleksandrov Oak Ridge National Laboratory,
Managed by UT-Battelle for the Department of Energy Overview of Beam Instrumentations for High-Power Operation of the Spallation Neutron Source Saeed Assadi.
Low Emittance RF Gun Developments for PAL-XFEL
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Beam Instrumentation for Future High Intensity Hadron Accelerators at Fermilab Manfred Wendt Fermilab 8/25/2008HB2008 WG F: Diagnostics1.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Alexander Aleksandrov Oak Ridge National Laboratory
Working Group F: Diagnostics and Instrumentation for High-Intense Beams – Summary – Manfred Wendt for the Working Group F contributors 8/29/2008HB2008.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
A Path Toward Standardized Low-Energy Emittance Measurements Doug Moehs January 17, 2007.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
October, 2009 Internal Review Beam Instrumentation David Gassner.
RF source, volume and caesiated extraction simulations (e-dump)
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
Marc Ross T9 – Snowmass 2001 Closing Plenary T9 – Diagnostics M. Ross/R. Pasquinelli Thursday, July 19 RD: 1) determine mixing between z and x/y 2) determine.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Developments of the FETS Ion Source Scott Lawrie.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Managed by UT-Battelle for the Department of Energy Experience on SNS Beam Instrumentation Collaborations Willem Blokland Beam Instrumentation Group Spallation.
Managed by UT-Battelle for the Department of Energy Overview of SNS Beam Instrumentation for High-Power Operation of the Spallation Neutron Source Willem.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning experience of SNS Ring By M. Plum ICFA mini-workshop on beam commissioning.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
ESS Front End diagnostic
Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
ILC Beam Instrumentation – Introduction Remarks –
Experience with beam instrumentation at Linac4
at Royal Holloway Univ. London
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
SNS Commissioning Mike Plum
Linac Diagnostics Commissioning Experience
Presentation transcript:

Summary: Working Group on Instrumentation Wim Blokland ORNL / SNS Manfred Wendt Fermilab 11/22/2008Summary: Project X Instrumentation WG 1

Charge Discuss and propose any potential modification on the ICD Identify issues that need to be addressed within the RD&D program Propose timeline (RD&D plan components and sequencing) Propose a provisional distribution of responsibilities through CD-1 Identify any issues related to the above that need resolution 11/22/2008Summary: Project X Instrumentation WG2

Overview Rather small working group, ~15 participants Used only 2 (of 3) WG sessions 4 presentations and lots of discussion –Wim Blokland: Overview of SNS Beam Instrumentation –Vic Scarpine: HINS Beam Instrumentation R&D –Manfred Wendt: Beam Instrumentation Collaborations –Manfred Wendt: Project X Beam Instrumentation R&D Projects Focus on beam parameter characterization –Beam instruments and technical challenges But also overlap with: –Controls, software, data acquisition, timing, etc. –Machine and system protection interlocks 11/22/2008Summary: Project X Instrumentation WG3

4Managed by UT-Battelle for the Department of Energy ProjectX 11/ SNS Collaboration: Instrumentation SNS Beam Instrumentation Collaboration Setup Partner labs design and built instrumentation Reviews (video-conferences/meetings) Local experts (to receive and help with final systems) Visits Issues Integration Priorities Budgets Delays Result Main accelerator diagnostics are operational

5Managed by UT-Battelle for the Department of Energy ProjectX 11/ SNS Instrumentation Ion Source 2.5 MeV 1000 MeV 87 MeV CCL SRF,  = 0.61 SRF,  = MeV387 MeV DTL RFQ RTBT HEBT Injection Extraction RF Short Pulse Harp (RTBT) #1 Wire Scanners (Linac/RTBT/HEBT) #42 Video Screens (Injection/RTBT) # 5 Energy Degrader Faraday Cups (DTL/CCL) #6 Aperture (MEBT) #1 Beamstop (MEBT/CCL) #2 Bunch Shape Monitors (CCL/HEBT) #6 Allison & Harp Emittance Scanner (FE/MEBT) #3 Harp (RTBT) #1 Wire Scanners (Linac/RTBT/HEBT) #42 Video Screens (Injection/RTBT) # 5 Energy Degrader Faraday Cups (DTL/CCL) #6 Aperture (MEBT) #1 Beamstop (MEBT/CCL) #2 Bunch Shape Monitors (CCL/HEBT) #6 Allison & Harp Emittance Scanner (FE/MEBT) #3 Accumulation Target Pulse Train BPM #160 BLM #370 (30 IOCs) BCM (Diff BCM) #26 ChuMPS (MEBT) #1 Laserwire (SCL) #10 Electron Scanner (Ring) #2 Spark Detector (LEBT) #2 Residual Gas Analyzer (FE)#2 Laser Emittance (HEBT) Ion Profile Monitor (Ring) Ridicules (Idmp) Electron Cloud Detector BPM #160 BLM #370 (30 IOCs) BCM (Diff BCM) #26 ChuMPS (MEBT) #1 Laserwire (SCL) #10 Electron Scanner (Ring) #2 Spark Detector (LEBT) #2 Residual Gas Analyzer (FE)#2 Laser Emittance (HEBT) Ion Profile Monitor (Ring) Ridicules (Idmp) Electron Cloud Detector

6Managed by UT-Battelle for the Department of Energy ProjectX 11/ Instrumentation in progress New instruments Unexpected issues - RGA Monitors, Spark Detectors Physics Requests (Non-interceptive/high intensity) - Electron Scanner - Ion Profile Monitor - Laser Emittance - Damper for e/p Operations (Safety) - Loss decay - Differential Current Monitor - 60 Hz Beam Accounting Existing instruments Reliability ­ became critical for ops User friendliness ­ non-experts to operate Additional capabilities - filtering - beam accounting Obsolescence - parts no longer available

7Managed by UT-Battelle for the Department of Energy ProjectX 11/ Laser Striping Experiment SCL Laser Profile Monitors, 9-stations MEBT 3-D Laser Profile Monitor 1)MEBT Mode-lock laser initially in 1-D – 9/2004 2)SCL Nd:YAG 1064 nm Laser, 9-station – 9/2005 3)Laser Stripping test Nd:YAG, 3ed harmonic -- 8/2005 4)Working on making SCL Laser system turn-key -- to present 4M4H 1D Laser Emittance Laser-based Instrumentation S. Assadi HIB2008

8Managed by UT-Battelle for the Department of Energy ProjectX 11/ Markers Electron Scanner Hardware Electron Scanner made by Budker Institute of Nuclear Physics: Dmitriy Malyutin, Sasha Starostenko, Sasha Tsyganov Vacuum vessel by SNS. 1)Build an electron gun (75kV) 2)Shoot a tilted line of electrons through the proton beam 3)Use a fluorescent screen and video camera to get the projected curve

9Managed by UT-Battelle for the Department of Energy ProjectX 11/ Electron Scanner Data 3D plot of Turn 343 Ring BCM around Turn 343

11/22/2008Summary: Project X Instrumentation WG 10 Temporary Diagnostics The temporary diagnostics station is to use at the end of the following linac sections as HINS evolves RFQ+MEBT, RT section, SSR1, SSR2 Minimum instrumentation includes: 2 BPMs, includes phase pick-up – time-of-flight 3 profile monitors 1 current transformers Beam dump –water cooled Faraday cup Maximum set –Emittance station – slit-collector –Bunch length – wire and/or laserwire –Bunch profile – laserwire

11/22/2008Summary: Project X Instrumentation WG MeV Temporary Diagnostics

11/22/2008Summary: Project X Instrumentation WG 12 Diagnostic Beamline Space in MEBT? Diagnostic Section? Space for diagnostics very tight What minimal permanent diagnostics are required?

11/22/2008Summary: Project X Instrumentation WG 13

11/22/2008Summary: Project X Instrumentation WG 14

Collaborations Collaboration R&D –Gives a view outside the usual lab life. –Notice of experience, skills, expertise and knowledge at other laboratories, institutes and universities. –Broadens the spectrum, shows other perspectives and solutions on same and similar problems. –Initiates new ideas and solutions! –Give opportunities of beam studies at other facilities, meet colleagues under “real-world” (not workshop) conditions. –Social and cultural aspects, e.g. meet new people, travel, have some fun (at and after work!), etc. –Make comparisons (at many levels). 11/22/2008Summary: Project X Instrumentation WG15

Instrumentation Collaborations Beam instrumentation is quite ideal for collaboration projects: –Small and mid-size projects, ideal for smaller lab teams, university groups, etc. –Challenging, practical projects in beam physics and engineering, apply various state-of-the-art technologies, e.g. RF & microwave electronics Lasers and femto-sec timing precision mechanics, UHV, clean-room technologies digital signal processing, real-time software, etc. –Does not need a very large budget (unlike magnets, SCRF cavities, high power RF and modulators, etc.) –But: May require test accelerator facilities with beam time for beam studies. 11/22/2008Summary: Project X Instrumentation WG16

Definition of Collaborations Needs a very clear plan: –Exact definition of the R&D project Detailed instrumentation specs Scope and deliverables (can be anything between consulting and a complete turn-key system) Schedule and milestones Hard- and software integration Realistic cost estimation (M&S, SWF) –Identify individuals of both partners to be responsible to carry the project. Requires transparency and trust! –Needs oversight, control and reviews with expertise. A personal remark… Examples of Fermilab collaborations on beam instrumentation 11/22/2008Summary: Project X Instrumentation WG17

BNL Laser Wire for HINS BNL test: –750 keV H - beam –Faraday-cup e - detector 11/22/2008Summary: Project X Instrumentation WG18

Fermilab LPM Test Setup Laser Profile Monitor details –Q-switch laser –Laser energy: 50 mJoule –Wavelength: 1064 nm –Pulse length: 9 nsec –Fast rotating mirrors (±4 0 / 100 µsec) –e - detector: scintillator & PMT Installation: –1 st Test with 400 MeV H - –HINS: 2.5 & 60 MeV Upgrades & issues –CW laser for single macro pulse sweep –Detector system for 8 GeV setup 11/22/2008Summary: Project X Instrumentation WG19 optical box laser beam H - beam double dipole BPM detector port

Beam Instrumentation Projects Beam ParameterBeam Instrument(s) beam / bunch intensitytoroids, WCM beam orbit / positionbutton-, Stripline BPM, cold BPM (cavity?) beam energy / phase / TOFBPM, HOM coupler(?) transv. beam profile / emittance laser wire, wire scanner, OTR, Allison scanner, slit / multi-wire (harp), pepper pot, IPM, e-beam transv. beam halolaser wire, vibrating wire long. bunch profile / bunch length wire-based bunch shape monitor, microwave Faraday-cup long. bunch tailsmode-locked (fiber) laser beam losses / machine protection Ion chamber, scintillator/PMT, neutron detectors, coaxial-line detectors electron cloud investigationTE waveguide mode, Faraday-cup beam-based feedback systems (e.g. slow-spill extraction) ? 11/22/2008Summary: Project X Instrumentation WG20

Expressions of Interest LBNL (John Byrd): –Electron cloud investigation and beam studies at the Main Injector. Utilizing time resolved measurements, based on TE waveguide mode phase modulation principle. Help on the CDR. –Mode-locked fiber laser for long. bunch profile and tail characterization in the HINS MEBT ORNL / SNS (Wim Blokland): –Various Project X mission critical beam instruments match SNS instruments: Allison scanner, e-beam scanner, slit/harp emittance scanner, microwave Faraday cup, (laser wire). SLAC (Ray Larsen): –Standardization towards an universal, state-of-the-art data acquisition hardware platform (instrumentation, controls, LLRF). [Yerevan Physics Institute: Vibration wire?] 11/22/2008Summary: Project X Instrumentation WG21