Introduction Software Project Management Plan Software Requirements Specifications Software Design Description Software Test Result 6 6 CONTENT DEMO 7 7
INTRODUCTION Background E-learning Embedded
INTRODUCTION Existing Solution Oasistech Famous e-learning website in US that focuses on providing studying materials of embedded system.
INTRODUCTION Existing Solution Bea.vn A e-learning website in Vietnam that focuses on providing studying material of English
INTRODUCTION Proposal Manage learning: Create, delete, update Course/Lecture/Quiz Manage user: Admin, Teacher, Student Online: Real time video Video Conference
PROJECT MANAGEMENT PLAN
Organization Role & Responsibilities
PROJECT MANAGEMENT PLAN Plan & Object MetricsUnitCommitted Start Datedate08/5/2012 End Datedate03/8/2012 Durationdays64 Maximum Team SizePerson4
PROJECT MANAGEMENT PLAN Process Model Iterative Model
PROJECT MANAGEMENT PLAN Risks
PROJECT MANAGEMENT PLAN Risks (2)
SOFTWARE REQUIREMENT
Software Requirements Specifications User Requirements Specification Administrator Teacher User Course/Lecture Search Streaming Video
Software Requirements Specifications System Requirements Specification External Interface Requirements User Interfaces Hardware Interfaces Software Interfaces
Software Requirements Specifications System Requirements Specification (2) Software System Attributes Usability Reliability Availability Security Maintainability Portability Performance
SOFTWARE DESIGN DESCRIPTION
Design System Architecture Free - Open Source Code Moduler system PluginsPHP Easy to Manage, Built, Maintain Benefit
Design Component Access System User Management Live StreamingCourse Management Test Management Lecture Management Studying Management
Design Database
SOFTWARE TEST Test Schedule Test StepStart DateEnd Date Unit/Functional Testing 10/07/201217/07/2012 User Interface Testing 18/07/201225/07/2012 User Acceptance testing 26/07/20124/08/2012
SOFTWARE TEST Testing Phase
SOFTWARE TEST Testing Phase TEST REPORT Project Name Embedded E-learning WebsiteCreator HuyVD Project Code EEWReviewer/Approver Document Code EEW_Test Report_v1.0Issue Date Notes N/A NoModule codePassFailUntestedN/A Number of test cases 1User Search Course Admin Teacher Studying Streaming77000 Sub total Test coverage % Test successful coverage100.00%
Result RESULT COMPARE WITH OBJECTIVE Product satisfy requirement Product is delivered on time User Interface is not satisfy all user Product System use technology as designed Developing team studied new technology as target Technology Developing process is completed in budget of human resource Resource
Result Lesson Learn