Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.

Slides:



Advertisements
Similar presentations
POWER FACTOR IN ELECTRICAL ENERGY MANAGEMENT
Advertisements

Chapter 13 AC Motors. Chapter 13 AC Motors Objectives Discuss the operation of an induction motor. Identify and explain the operation of various three-phase.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
QUALITY AND TECHNOLOGY
Sistan & Balouchestan Electric Power Distribution Company
EMC in Electrical Power Systems Frithiof Jensen Power System Engineer November 12, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
A Large Scale UPS for the Australian Synchrotron Don McGilvery Lead Accelerator Operator.
UPS Improvements to Beam Availability at the Australian Synchrotron Light Source Don McGilvery.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Electrical Power Systems
Plant Utility System (TKK-2210)
Chapter 1 Aircraft Electrical System. Chapter 1 Aircraft Electrical system Electrical component Storage Battery DC & AC Generator Control and Protection.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Chapter 2 Transformers.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Transient Overvoltages
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Electrical Installation 2
Applied Harmonics Control of Harmonics
SWER New Zealand & Australian Experience
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
EDGE ROUGH DUTY UPS Rough Duty UPS. Power Quality Problems on Rigs Critical Federal Signal loads require clean, regulated, uninterrupted power to operate.Critical.
Superconducting Fault Current Limiters
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
1 POWER QUALITY -- Bhanu Bhushan -- April, Simple examples around us : Ceiling fan regulators Tube lights Lap-tops & peripherals Domestic inverters.
EET 306 ELECTRIC MACHINES Syafruddin Hasan.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
1 Power Quality EKT 451 CHAPTER 8. 2 Introduction Utilities transmit electricity over power lines into home as an alternating current (AC) wave. This.
Consumer’s Main Switchroom & Main L.V. Switchboard
Utility Engineers, PC.  Generation  Transmission  Distribution.
Steady State Analysis Of A Microgrid Connected To A Power System
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Magnetic field due to an electric current
Introduction  Utilities transmit electricity over power lines into home as an alternating current (AC) wave.  This is how power travels through wiring.
General power system. objective Review general energy and power system Application of fundamental knowledge of principal machines, transformer and other.
Distribution Systems-General
Department of Electrical Engineering
REACTIVE POWER COMPENSATION
Preventing Voltage Sags and Interruptions. # Equipment supplier awareness: # Customers level protection: # Utility level protection: - Sag magnitude and.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
6 Week industrial Training Presentation
Module 11 -Cost Estimation This module covers how to estimate project costs including: –Equipment costs – combination of procurement and installation (including.
Internal Combustion Engines
POWER DISTRIBUTION & POWER LOSS REDUCTION METHODS
Introduction to Electric Power System and A. C. Supply
Effects of Harmonics on Capacitors Electrical System
Introduction to Global AC Power
CLIC Civil Engineering & Infrastructure Working Group Meeting
3AH5 Vacuum Circuit-Breaker For Standard Applications
Electric Machine Induction Motor
Lesson 16: Asynchronous Generators/Induction Generators
Development of new power supplies for J-PARC MR upgrade
FLYWHEEL BATTERIES Presented by 14X41A X41A X41A0315
3AH5 Vacuum Circuit-Breaker For Standard Applications
Chapter 7 System Protection
Design of Electric Power Systems and Utilities
Anna Brinck, M.S. Student Robert Cuzner, Assistant Professor
EET 323 – Electrical System Design Lecture 9: Grounding
LOAD BEHAVIOUR DURING VOLTAGE DIPS
3AH5 Vacuum Circuit-Breaker For Standard Applications
Presentation transcript:

Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne

Introduction Background of the project Look at the power interruptions to blame The causes of power interruptions UPS technical requirements Design, efficiency, and autonomy of the UPS Practical implementation and installation The improvements to power reliability

Background The Australian Synchrotron is expected to operate continuously 24 hours per day, 7 days per week (approximately 5,000 User Beam Hours per year) The mean time between failures (MTBF) for power interruptions was approximately 150 hours prior to the installation of the UPS systems. Power reliability was to blame for approximately 35% of all down time. 3 systems that are particularly sensitive to power disturbances include the storage ring magnets, the storage ring RF, and the mechanical plant. A voltage fluctuation of greater than ±5% from the 240V nominal for 10 cycles (200ms at 50Hz mains) can cause either of these systems to enter a fault condition, losing the stored beam. An uninterruptible power supply (UPS) was a strong solution to provide adequate power conditioning

Power Interruptions Example of a site feed voltage sag: No interruption longer than 2 seconds has occurred

Power Interruptions The Synchrotron site is supplied by two dedicated underground 22kV feeders from Zone substations SV (Springvale) and SVW (Springvale West). The Synchrotron site feeders are SV19 and SVW44 and both are 2.8km in length.

Power Interruptions All disturbances are within the limits allowed by the distribution code

Power Interruptions Information Technology Industry Council (ITIC) Curve and Victorian Distribution Code

Power Interruptions Interruptions when compared with the ITIC curve:

Causes Known faults at 66kV and 22kV as well as unknown causes. Common voltage sags are caused by network operations (switching, capacitor banks) and other customers (motors starting and equipment failures).

Causes Other causes include trees, possums, fires, etc.

UPS Requirements The UPS system ratings needed to cover the storage ring critical loads in order to ride through power interruptions. The design loads were specified: TransformerLoadApparent Power Active PowerPower Factor Tx2Mechanical Plant 1,700kVA1615kW0.95 Tx4Storage Ring RF 1,200kVA1140kW0.95 Tx6Storage Ring Magnets 1,400kVA1330kW0.95 Total4,300kVA4085kW0.95

UPS Requirements Flywheel rotary UPS systems provide very high output current compared to purely electronic UPS systems, and are able to provide inrush current for inductive loads, and large loads such as magnet power supplies. In addition they can provide 14 times rated current under short circuit in order to clear faults on downstream circuit protection. Rotary systems that don’t use batteries have a year lifecycle, which suits the operating life of the Australian Synchrotron Only short-term ride through of at least 2 seconds is required due to the network supply reliability. Rotary systems are on-line, and this is important as one cannot predict when a power interruption will occur when using a standby off-line system

UPS Requirements The UPS systems are installed between the existing transformer secondary windings and the main circuit breakers of the low voltage switch boards.

The UPS Design Flywheel Energy Storage Converter Bridge Motor/Generator Coupling Choke Load

The UPS Design 6000kg steel disc rotates at 55Hz mechanical frequency (3300rpm) on a 4- pole motor/generator Flywheel lifted by a magnetic bearing to reduce wear on the mechanical bearings Flywheel is encased inside a positive pressure helium vessel which reduces friction and is less prone to problems that vacuum systems have Energy storage is approximately 15.7MJ Generates electricity at 110Hz down to 50Hz electrical frequency. This is equivalent to 55Hz – 25Hz mechanical frequency (3300rpm – 1500rpm) Generated electricity is converted via SCR bridges to drive the output motor/generator at 50Hz ± 1Hz continuously until the flywheel is discharged. Motor/Generator runs at 25Hz (1500rpm, 4-pole) for 50Hz mains output

UPS Efficiency UPS efficiency is approximately = 93.6% Cooling is required to keep the system below 30°C Total UPS losses UPS SystemAverage LoadAverage Losses Site Feed UPS Tx kW kW Site Feed UPS Tx kW49.077kW Site Feed UPS Tx kW kW Total: kW

UPS Autonomy Typical active power demands: Tx6: kW Tx4: kW Tx2: kW This typically allows over 14 seconds autonomy on all systems UPS SystemPeak LoadMinimum Autonomy Time UPS TR21615kW8 seconds UPS TR41140kW14.8 seconds UPS TR61330kW12.75 seconds

Implementation Main Building & LV Room – HV Room – UPS Building

Implementation The UPS systems installed inside the UPS building

Implementation Cables to the 2000kVA unit required 5 X 500mm2 cross sectional copper conductor area per phase plus neutral (20 cables)

Implementation UPS systems must be kept below 30°C and dust free with a 200kW capacity air handling unit. Springs suspension for isolating 25Hz and 55Hz mechanical vibrations from the technical floor / beamlines was necessary.

Improvements to reliability No more outages to the storage ring due to brief electrical interruptions. The percentage of faults due to power decreased for 35% to 5% after the UPS was commissioned. 5% during 2012 was due to on site electrical faults YearFacility MTBF (hours) Power MTBF (hours) % of faults due to power % % % UPS COMMISSIONED DECEMBER %

Conclusion and Further Improvements The UPS was effective at improving power reliability and beam availability at the Australian Synchrotron. Installation of the Tx3 LINAC load of 124kW on to the Tx4 UPS system will be possible in May.

The end Any Questions?