ESOC Navigation Support Office IGS Workshop 2008 Miami IGS Real Time Pilot Project: Analysis Centre Activities Loukis Agrotis 4 June 2008.

Slides:



Advertisements
Similar presentations
GPS and Time Metrology GPS is base for the most common used long-haul time and frequency measurement methods within the time community, it is: –precise.
Advertisements

Real Time IGS Pilot Project (RT-PP) Status Report IGS Workshop Newcastle UK, June 28, 2010 Ken MacLeod and Mark Caissy.
FIX_8 (High Accuracy Positioning using EGNOS and Galileo Products) Galileo SME Workshop 5 th & 6 th April 2006.
ESOC Navigation Support Office ILRS Workshop 2008 Poznan, Poland ESOC IGS, IDS, ILRS (Re-) processing T. Springer, M. Otten, I. Romero, J. Dow.
Mesoscale ionospheric tomography over Finland Juha-Pekka Luntama Finnish Meteorological Institute Cathryn Mitchell, Paul Spencer University of Bath 4th.
Real-Time Orbit And Clock Estimation Using PANDA Software Shi C, Lou YD, Zhao QL, Liu JN GNSS Research Center, Wuhan University, China IGS Analysis Center.
Geodetic Survey Division EARTH SCIENCES SECTOR Slide 1 Real-Time and Near Real-Time GPS Products and Services from Canada Y. Mireault, P. Tétreault, F.
Richard DalBello Vice President Government Affairs Intelsat General Joseph Chan Senior Manager Flight Dynamics Intelsat Improving Space Operations Workshop.
AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, GNSS.
Radio Technical Commission for Maritime Services
NGS Real Time Network Status & Future Prospects Neil Weston NGS Convocation, 2005 Silver Spring, MD.
Real Time GNSS via Internet Protocol Status & Standardization
Status of Multi-GNSS Monitoring Network Establishment Japan Aerospace Exploration Agency Satoshi Kogure APEC GIT/15 June 14, 2011.
Operational deployment of GPS Dancer: organisation, status and schedule Henno Boomkamp Jerôme Verstrynge, Jeff Daniels, Claus Randolph, Veronique Séjan,
Geodetic Research Laboratory, Department of Geodesy and Geomatics Engineering GEOIDE Project 31 Quebec Workshop, October 2006, Quebec Farret and.
1 GNSS Reference Station Network Applications – Status and Vision Herbert Landau Trimble Munich, Germany January 2011.
NGS GPS ORBIT DETERMINATION Positioning America for the Future NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic.
ESOC Navigation Support Office IGS Workshop 2008 Miami ESOC New Developments and Innovations T.A. Springer, F. Dilssner, E. Schoenemann, M. Otten, I. Romero,
Class 19 – NAVSTAR GPS, GLONASS and Galileo
VRS Network The Magic Behind the Scene
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
10/7/ Innovative Solutions International Satellite Navigation Division ION NTM 01 Capabilities of the WAAS and EGNOS For Time Transfer SBAS, an Alternate.
EPN Central Bureau IGS Analysis Workshop 2008, Miami Royal Observatory of Belgium C. Bruyninx, J. Legrand, F. Roosbeek EPN Central Bureau Royal Observatory.
Real-time IGS Network Management and Data Exchange Interfaces Georg Weber, BKG, Germany IGS Analysis Center Workshop, Miami Beach, Florida, 2-6 June 2008.
Spazio ZeroUno Cell Broadcast Forum Plenary, Milan, May 28-29th 2002 Andrea Ghirardini Business Development Spazio ZeroUno An efficient and effective method.
ESOC Navigation Support Office EGU Vienna, , 1/18 Ground support network for the Metop GRAS atmospheric sounding mission R.Zandbergen, A.Ballereau,
Claudinei Rodrigues de Aguiar Federal University of Technology - Parana Paulo de Oliveira Camargo São Paulo State University.
Real Time Network Activities at The National Geodetic Survey Neil D. Weston National Geodetic Survey, NOS, NOAA Silver Spring, Maryland January,
P. Wielgosz and A. Krankowski IGS AC Workshop Miami Beach, June 2-6, 2008 University of Warmia and Mazury in Olsztyn, Poland
IGS Analysis Center Workshop, 4 June 2008 Recommendations from “RT/NRT user requirements” 1.E-GVAP recommends IGS to support PPP strategy with high quality.
GSI Japan - 21st of June 1999 GPS-Positioning using Virtual Reference Stations - Theory, Analysis and Applications Herbert Landau Spectra Precision Terrasat.
Data centre support for the IGS-RT PP W. Söhne, H. Habrich, G. Weber Federal Agency for Cartography and Geodesy, Frankfurt am Main, Germany.
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
Introduction to GPS/GNSS Introduction to Tidal and Geodetic Vertical Datums Corbin Training Center January 7, 2009 Jeff Little Guest Speaker ,
VTEC prediction using a recursive artificial neural networks approach in Brazil: initial results Engineer School - University of São Paulo Wagner Carrupt.
Page 1© Crown copyright 2004 Development of a Ground Based GPS Network for the Near Real Time Measurement of Integrated Water Vapour (IWV) Jonathan Jones.
SP Swedish National Testing and Research Institute Real-Time GPS Processing with Carrier Phase FILTER PARAMETER INFLUENCE ON GPS CARRIER PHASE REAL-TIME.
The International GNSS Service (IGS), June 2008: Perspectives and Key Issues John M. Dow Chair, IGS Governing Board.
Meeting the Needs of the IGS Real-Time PPP User Community
Presented by: Technical contributions from: THE INTERNATIONAL ASSOCIATION OF GEODESY AND PRECISE POINT POSITIONING.
P PP based on the processing of GPS static observations is limited by the number of visible satellites, among other things, which is often insufficient.
Earth Sciences Sector SLIDE 1 Some current GNSS activities at GSD GEOIDE Project #31 Workshop October 2006 P. Collins F. Lahaye K. MacLeod Y. Mireault.
Информационно-аналитический навигационный центр ЦУП-М ЦНИИмаш GLONASS Status. ILRS support for GLONASS. ILRS Fall 2005 Workshop October 2-7, 2005, Eastbourne.
View on GPS and Galileo ‘From across the Atlantic…’ Ruth E. Neilan International GNSS Service (IGS) Central Bureau Jet Propulsion Laboratory/California.
Principles of the Global Positioning System Lecture 09 Prof. Thomas Herring Room A;
On the Way to Full PPP Potential Pierre Héroux Geodetic Survey Division, Natural Resources Canada.
National Height Modernization Eastern Regional Meeting March 4, 2014 Continuously Operating Reference Stations (CORS) Neil D. Weston National Geodetic.
Redundancy in Dynamic Positioning (DP) Applications based on Satellite Navigation. High Precision Navigation and Positioning Conference,
IGS Workshop 2008, Miami Beach IGN activities as IGS data center The IGN Global Data Centre (GDC) has been designed and implemented in answer to both the.
Recent GNSS activities in Germany for COST
2nd GEO Data Providers workshop (20-21 April 2017, Florence, Italy)
GPS - Global Positioning System
Status of GNSS ionospheric Study in Korea
Permanent GNSS Stations (GNSS – Global Navigation Satellite System)
Real-Time Working Group
Appliance of IceCORS network 2017 by Dalia Prizginiene
GMV/ISON COMBINED OPTICAL CAMPAIGNS
Loukis Agrotis and Mark Caissy IGS GB 43 Pasadena 22 June 2014
Troposphere Working Group
Presentation of Public ESA Multi-GNSS Products
CNES Real-time Analysis center Status
The Status of Dual-Frequency Multi-Constellation SBAS Trial by Japan
IGS Infrastructure Status
New Features of the GNSS Data Center
ESOC IGS Reprocessing T. Springer, F. Dilssner, E. Schoenemann,
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
Permanent GNSS Stations (GNSS – Global Navigation Satellite System)
ESOC Combined GNSS Processing
ESOC Combined GNSS Processing
Agenda Background and Motivation
Presentation transcript:

ESOC Navigation Support Office IGS Workshop 2008 Miami IGS Real Time Pilot Project: Analysis Centre Activities Loukis Agrotis 4 June 2008

ESOC Navigation Support Office IGS Workshop 2008 Miami Outline  Objectives  Schedule  Analysis Centre Status  RT Processing Issues and Challenges  Conclusions

ESOC Navigation Support Office IGS Workshop 2008 Miami Objectives  Generation and Dissemination of a Real Time Combination Product –Accurate (clocks < 0.5 ns, predicted orbits <5 cm ) –With low latency ( <? ) »5-10 sec from observation time should be achievable –High Availability »Low Downtime »Available to a potentially large user set –High Reliability »But with no “service guarantees” –These are for commercial providers to offer

ESOC Navigation Support Office IGS Workshop 2008 Miami Schedule April 08:AC teleconferences and formal PP kick-off June 08:Clock RINEX and SP3 Products from 3 ACs  Start routine comparisons  Develop and validate tools for combination solution  Prototype process on ESOC FTP server (to be eventually transitioned to CDDIS) July 08:Start Disseminating Comparisons Sept 08:Batch Combination Product Jan 09:RT Product Dissemination by ACs All ACs Operational March 09:RT Combination Product Available

ESOC Navigation Support Office IGS Workshop 2008 Miami Analysis Centre Status CentreStatus RT Product Availability ESOC RT Clocks and TZD and NRT Orbits from batch process. Real Time products currently streamed internally. Real Time product dissemination outside ESOC once agreement on formats and protocols for the PP is reached. Immediate NRCan RT Clocks and TZD and NRT Orbits from batch process. Currently distributing RT products via satellite. Immediate BKG with TU Prague RT clocks as double difference clock corrections, using IGS ultra-rapid orbits. RT products and Broadcast ephemeris orbit corrections are disseminated via NTRIP. Immediate IGG RT Clocks based on IGU orbits. Currently generates online comparisons with IGU clocks. IGU orbit residuals in near future Immediate

ESOC Navigation Support Office IGS Workshop 2008 Miami Analysis Centre Status CentreStatus RT Product Availability GMV SP3 and clock RINEX files every hour (with current capabilities). RT system under development. January 2009 (TBC) University of Newcastle RT obits and clocks. Clocks determined with smoothed pseudo ranges. January 2009 KASI Real Time data processing with estimation of orbits, clocks, ionospheric and Tropospheric products. AC for global ionospheric products from RT- IGS stations. January 2009 (TBC) TU CataloniaAC for RT Ionospheric Products.June 2009 Chalmers Emphasis is on a Tropospheric product for weather forecasting. Intend to participate as a RT Analysis Centre using own software for estimation of orbits and clocks. January 2009 (TBC) Geo++Analysis contributions using best efforts.January 2009

ESOC Navigation Support Office IGS Workshop 2008 Miami Issues and Challenges Product and Data Formats  Formats for RT products –Formats still to be defined and agreed –Main issue that could hold back progress of RT PP  Formats for Data –Predominant data formats are RTCM, RT-IGS / SOC and BINEX for GPS –Main challenge for data formats is support for generic GNSS (GLONASS, Galileo, Compass) and higher accuracies –Discussions now taking place on future requirements thanks to the good efforts of NRCan and BKG –Objective is to find the best fit among currently proposed format revisions and to influence their evolution so that our requirements are met.  Transport Protocols –NTRIP via HTTP, TCP or UDP –UDPRelay –Either or both could be used to disseminate the RT Combination Product

ESOC Navigation Support Office IGS Workshop 2008 Miami Issues and Challenges Network Issues  Excellent results are possible thanks to the contributions of a number of agencies  Large area with no network coverage results in network fragmentation. Example from 22 April shows circled stations and satellites which experienced jumps in our solution.  Densification of the network is being actively pursued

ESOC Navigation Support Office IGS Workshop 2008 Miami Issues and Challenges Network Issues  The clock correction plots show that all clocks in the South-East have jumped by the same amount, while the remaining clocks were unaffected  Several similar occurrences of this phenomenon have been observed

ESOC Navigation Support Office IGS Workshop 2008 Miami Issues and Challenges Filter Tuning Issues  Jump experienced in PRN19 at start of new pass with CAS1  CAS1 clock appears to reset with each new pass  Changes needed to the tuning of the filter so that the CAS1 clock behaviour is better modelled

ESOC Navigation Support Office IGS Workshop 2008 Miami Conclusions  RT PP is now active, thanks to the enthusiasm and support of the participating groups, particularly NRCan and BKG.  Success of the AC activity relies on the generation of high quality RT products but also on making the correct decisions on formats and protocols to ensure a wide distribution  Densification of the network in areas of low coverage is a priority  An IGS RT service will complement and increase the usefulness of the various commercial offerings for this type of service - it should not be viewed as competition to any of the current offerings of potential participants.