LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.

Slides:



Advertisements
Similar presentations
Wetsuit Roofing and Waterproofing
Advertisements

Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
ROOF SLOPES.
LAS SALINAS CONDOMINIUMS Key West Florida. Featuring A Sprayed Polyurethane Roof System Applied To Concrete.
Sunny day, installing exterior casings on the windows.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
INSTALLATION MANUAL Job Forman Responsibilities
BOLTON RESERVOIR 2012 BOLTON RESERVOIR CLEANING AND INSPECTION.
Revision Quiz Click your mouse, read the question, click again to reveal the answer M. S. Martin October 2007.
Subpart R Steel Erection
Skyscraper Construction
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
A True Handcrafted Company
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
REPLACING EAST SIDE OF BRIDGE in WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here HOOD CANAL.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Chapter 20 Roof Plan Components.
Chapter 20 Roof Plan Components.
Sylvan Theater Column Restoration Project
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Carl the construction worker has a problem. Carl needs to build a house for a family moving into the neighborhood. Carl’s boss gave him lots of tools.
"Secure Wall" High Security Fence System * Patent Pending * Created and Fabricated by: South Lyon Fence Co., Inc.
CONSTRUCTING A FIVE CABIN LATRINE
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
John Osborne GS/SE March 2013
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Building With Superior Walls Introducing The Superior Advantage.
Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary.
Installation. Indoor Unit Installation Typical Installation.
Introduction to a pit installation
Introduction to Earthquake Hazards in Common Structures Prepared by David J Hammond, Structural Engineer Ret. Short Course for Earthquake Preparedness.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Professional Roofing Contractors “Using PowerPoint On Your Laptop Computer”
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
BUILDING CONSTRUCTION
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Playground Analysis by Stephen Thomas
Foundation – jay Desai.
Category 2 Small Renovation Project
Ryan Thurston | Duncan McLennan
Site Grading Site Grading Civil Engineering and Architecture
Disaster Mitigation Techniques for Householders
Aerial Photography Bangalore
CONCRETE FORMWORK Formwork.
DOCKLANDS STADIUM CONSTRUCTION
FIS Process Cold Chain Equipment Field Installation Qualification Form
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
How to Operate Windows 10: A Survival Guide.
Consulting Captains, LLC
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
MATERIALS AND CONSTRUCTION I
STRUCTURAL TIMBER FRAMING
Pier Foundations Piers Suspended floor Ground beam Next slide.
TRENTON Casing Filler Presentation
Foster Communications Coliseum roof update
J bathroom/ hi bedroom/ I kitchen
Bunker Wall Design Wall ESS
Lap Quilt Club Lesson 4- Machine Quilting
Stoughton Parts Sales 2019 Customer Appreciation Event
Presentation transcript:

LAS SALINAS CONDOMINIUMS Key West, Florida

Featuring: A Sprayed Polyurethane Roof System Applied To Concrete

Installed By

An aerial view of the project

The preliminary gathering of our equipment at the site The preliminary gathering of our equipment at the site

We have covered the cars in the parking lot to protect them from over spray We have covered the cars in the parking lot to protect them from over spray

This is what the old roof looks like before we install the new SPF roof! This is what the old roof looks like before we install the new SPF roof! The inside of the mansard is rotted and has to be replaced All new vents will be made in our metal shop

The inside of the mansard has been ripped apart and will be rebuilt The inside of the mansard has been ripped apart and will be rebuilt

We are cutting the roof into square sections for easy pick up and removal

Our Bobcat starts digging up the concrete roof Our Bobcat starts digging up the concrete roof

The crew is loading the lightweight concrete to bring over to the debris boxes The crew is loading the lightweight concrete to bring over to the debris boxes

Look at this mess! Look at this mess!

Here the guys are loading the slabs of lightweight concrete into our specially built debris boxes Here the guys are loading the slabs of lightweight concrete into our specially built debris boxes

The debris is piled into our boxes to be lifted to the dumpsters on the ground The debris is piled into our boxes to be lifted to the dumpsters on the ground

Our crane is lifting our custom built box to the dumpster below Our crane is lifting our custom built box to the dumpster below

There is so much debris we have 2 cranes taking it off the roof! There is so much debris we have 2 cranes taking it off the roof! We use safety lines around the perimeter of the building

Another load to the dumpster Another load to the dumpster

These are the hurricane approved equipment stands waiting to be installed We are rebuilding the dormers

The concrete is being scarified to prepare it for the primer coat The concrete is being scarified to prepare it for the primer coat

We are starting to rebuild the mansard

The primer has been sprayed and the mansard has been rebuilt The primer has been sprayed and the mansard has been rebuilt

The equipment stands are in place and are primed and the concrete is primed and ready to accept the sprayed polyurethane foam The equipment stands are in place and are primed and the concrete is primed and ready to accept the sprayed polyurethane foam

This area is called a “cricket” and is used to direct all water to the drain

These are the vents we custom make in our metal shop We foam in all the protrusions first A “cricket”

The white strips indicate how we will build up the foam for water drainage One of several drains Everything that sticks out of the roof is pre- foamed which will prevent future leaks

We like to foam the corners first The screen they are holding prevents over spray

We are always trying to prevent over spray We are always trying to prevent over spray

The equipment stands are wrapped, primed and ready to be foamed in

A perfect example of how the equipment stands and vents look after being foamed in A perfect example of how the equipment stands and vents look after being foamed in

We are spraying the parapet wall. The men are holding screens to prevent over spray We are spraying the parapet wall. The men are holding screens to prevent over spray

Our metal shop custom made 42 of these vents for this roof

The base coat is being applied on the parapet walls as well as on the roof The base coat is being applied on the parapet walls as well as on the roof

A first pass of foam over the silicone

A great contrast between the silicone and the top coat with granules A great contrast between the silicone and the top coat with granules

This shows the preparation of our 3”-2”-1” water management system This shows the preparation of our 3”-2”-1” water management system This broad tan area will have 3” of foam. The gray area will have 2” of foam and then there will be 1” of foam in the small box around the drain. This will insure positive water drainage! This broad tan area will have 3” of foam. The gray area will have 2” of foam and then there will be 1” of foam in the small box around the drain. This will insure positive water drainage!

As shown in the next few slides the dormers will be rebuilt with steel covered tiles As shown in the next few slides the dormers will be rebuilt with steel covered tiles

The roof has been done except a small part in the upper right corner. The only thing left to do are the dormers and install the A/C units The roof has been done except a small part in the upper right corner. The only thing left to do are the dormers and install the A/C units A beautiful roof!

The finishing touches are now being completed and the dormers are ready for the tile installation The finishing touches are now being completed and the dormers are ready for the tile installation

The tiles are being fitted

Quality work by a quality company! We pay attention to detail

The roof and all tile work is now complete The roof and all tile work is now complete

Did you know ? WE CAN GUARANTEE YOUR NEW POLYURETHANE FOAM ROOF WILL NOT BLOW OFF!

Even during a… Category 5 Hurricane!

Here’s the proof…

BAYER AG The Global Fortune 500 Company and Its North American Subsidiary: BAY SYSTEMS NORTH AMERICA Along With:

Now offer such a guarantee and here it is…

Thank You For Your Interest In Our Spray Foam Roof System