April 9, 2010 Meter Working Group EPS Meter Design Proposal And Generation Site Modeling & Mapping Joseph Bezzam Meter Engineer II.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 Texas Nodal Registration Meeting #3 Matt Mereness July 30 th, 2007.
Advertisements

Distributed Generation (DG)
How to send request for activating your Hotmail account go to site 
SMART METER TEXAS Status Update April 1, AGENDA Release 1 Smart Meter Texas Online Portal Update One on one REP SMT FTPS and API Integration Process.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
1 GENMAP Registration Workshop Jan 14, 2010.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
COMMERCIAL OPERATIONS ORGANIZATION Betty Day Director, Commercial Operations (office) (cell) (fax)
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
Texas Test Plan Team Market Testing Update to RMS October 16, 2002.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
1 Market Trials Congestion Revenue Rights Weekly Update May 6, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
1 MVI/MVO Workshop June 3 – 12, 2002 Workshop Results.
Overview Art Deller, P.E. Supervisor, Model Administration New Resource Workshop May 28, 2014.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Registration Process 1.  Change Zone team will be glad to help you answering any question about the programs and to give you further explanation. Please.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
1 Update to NATF on Resource Registration Feb 2, 2010.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Distributed Generation Registration June 30, 2008.
14 Minute Ramp Period Testing Workshop June 30, 2009.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
Lead from the front Texas Nodal 1 Registration Data Update Aug 25, 2008.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
ERCOT MARKET EDUCATION Retail 101. Market Rules Overview Topics in this lesson...  Introduction to Market Rules Public Utility Regulatory Act PUCT Substantive.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Advanced Metering Implementation Team Update Presentation for RMS Christine Wright, Competitive Markets Division Public Utility Commission of Texas June.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
June 9 th, 2008 TPTF Texas Nodal Program: Market Readiness Metrics Update Mike Beck.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
1 Readiness Scorecard – Market Readiness Series Brandon McElfresh Nodal Readiness and Transition January 28, 2010.
November 17, 2014 ERCOT AMS Data Loading Result Code Descriptions & Distribution AMS Workshop IV.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
WSP-ATR Submission.
NMT – Network Operations Modeling & Telemetry - Project
Market Trials Congestion Revenue Rights
Registration Data Collection September Window
Finance Brief June 2016.
NMMS Nodal Network Mgmt and Monitoring System Update
Munix Healthcare Customer Profiling, Frequency Analysis, Location Mapping, Movement Analysis, Web Classification, Time Analysis, and much more …. Internet.
Nodal COMS Additional Items Update
August 25, 2016 TAC Update to COPS
Resource Registration Update
Retail Market Assurance Services for the Irish Electricity Market
Stacking Implementation Plan
PROGRAM CONSULTATIVE FORUM Meeting pack
Market Trials Open Market Participant Call
GroupNet for Plan Members SIMPLIFIED RE-REGISTRATION
Current Service Agreement Proposal Process
Harmonisation Working Group
HSPM 191A & 191B Dept. of Hospitality, Tourism & Event Management
Approach to Market Cutover - Draft for Discussion
Kevin Connolly Graduate Assistant of Student Organizations
ESB Networks AIP Programme Update to IGG, June 22nd 2006
Department of Religious Studies REGISTRATION PROCESS 2017
Scheme for Growth Pilot
HAZTRAKR Mobile Emergency Environment
Using the AIM Alternative Testing Module (for Instructors)
Using AIM (for Instructors)
DSC ChMC Switching Programme Update 11th September 2019
Time-Based Management of Large Scale Network Models
Presentation transcript:

April 9, 2010 Meter Working Group EPS Meter Design Proposal And Generation Site Modeling & Mapping Joseph Bezzam Meter Engineer II

2 Meter Working GroupApril 9, 2010 EPS Meter Design Proposal And Generation Site Modeling & Mapping

3 Meter Working GroupApril 9, 2010 EPS metering design proposal approval, mapping, and cutover procedure has been changed in recent past due to upcoming Nodal market implementation. Overview:  When TDSP submits a new/revised design proposal, supervisor of Meter Engineering department would review and approve the design proposal.  If the approved design proposal is for generation facilities the associated EPS meters needs to be modeled in ERCOT Network Model Management System (NMMS).

4 Meter Working GroupApril 9, 2010  ERCOT will send GENMAP package which contains information on mapping of EPS meter(s) to unit(s), resource node, Resource ID (RID) to Resource Entity (RE).  Resource Entity (RE) is required to review and signoff the verification form.  Once ERCOT receives RE sign off, proposed cutover date for generation sites will be send to TDSP.

5 Meter Working GroupApril 9, 2010 Following are the changes from TDSP point of view  GENMAP is primarily for RE but there are some implications to TDSP  The requirement to submit design proposal 45 days in advance is critical - to provide ERCOT enough time to complete the modeling and mapping process.  Meter CT location and its connected devices (such as brakers and disconnect switches) are essential in modeling and we advice to send a detailed one-line drawing as part of design proposal.  Proposed cutover date for generation sites will be provided by Meter Engineering department to TDSP.  TDSP needs to confirm the cutover date with Meter Engineering department.

6 Meter Working GroupApril 9, 2010 GENMAP Package  Need further explanation on GENMAP package please refer to GENMAP Registration Workshop Presentation (01/14/10,.ppt, KB)  Any questions on GENMAP please call Wholesale Client Service Manager. They are the point of contact.

7 Meter Working GroupApril 9, 2010 Q&A