EUDET meeting 21/10/09 1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 Infrastructure Activity call Context of AIDA.

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Role of Management and Technical Coordination
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin LAL/IN2P3/CNRS.
1 Framework Programme 7 Guide for Applicants
The Preparatory Phase Proposal a first draft to be discussed.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
ACTIONS AT NATIONAL LEVEL Proposal on criteria to choose ERFP activities/projects on national (sub-regional) level Elżbieta Martyniuk on behalf of the.
1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 IA call Context of AIDA call AIDA Work Package description Schedule.
1 Role of National Contacts - Diffusion of information in your community - Consortium status - Overhead - Threshold for partnership - Reimbursement rules.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
5 th Spanish Workshop on Future Accelerators IFIC, Valencia Oct I. Vila IFCA (CSIC-UC) Advanced European Infrastructures for Detectors at Accelerators.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
AMICI WP1 – Management, coordination and dissemination
Final CALICE OsC meeting: Status and summary of project
New EU FP7 I3 call Identifier: FP7-INFRASTRUCTURES
CERN R&D plans and Infrastructures
WP8 – Improvement and equipment of irradiation beam lines
Accelerator Research and Innovation for European Science and Society
WP microelectronics and interconnections
Extended Steering Committee Meeting
European Detector R&D: AIDA
Working for a detector project: A message from AIDA
EU Institution Board 1 representative of each participating institute
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
AMICI WP1 – Management, coordination and dissemination
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

EUDET meeting 21/10/09 1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 Infrastructure Activity call Context of AIDA call : - DevDet referee comments - Organisation AIDA Work Package description Schedule L. Serin

EUDET meeting 21/10/09 2  Call identifier: FP7-INFRASTRUCTURES  Date of publication: 30 July 2009  Deadline: 3 December 2009, at 17:00  Activity: 1.1 Support to existing research infrastructures Integrating Activities (IA)  Indicative budget for IAs: 162 M€  “Targeted” mode for IA projects: only projects in 35 pre-selected fields (topics) are eligible to apply. Only one project per topic expected.  AIDA will be submitted under topic: Physics Astronomy and particle physics ° INFRA : Research Infrastructures for Nuclear Physics. ° INFRA : Detectors for future accelerators. ° INFRA : Research Infrastructures for dark matter search, neutrinos, gravitational waves. ° INFRA : Research Infrastructures for high energy astrophysics.  Expected success rate of ~ 60%  average funding of 8 M€ per project (maximum possible funding is 10 M€ (max 2.5/ year), total budget around 30 M€ )  Should contain Management package, Network activity, Transnational access and Joint Research Activity Overview of the 2010 FP7 Call for RIs

EUDET meeting 21/10/09 3 Reimbursement rate Usual rule to receive some EU budget : - Commit some budget : direct cost (manpower, travel, material) + overhead (country dependent, but ~60 % ) - Receive from EU : (committed budget)* rate Activity Rate MGT (WP1) < 50 % NA/COORD (WP 2,3,4) 30 % TA (WP 5,6,7) ≥ 75 % JRA(RTD) (WP 8,9) 30 % Below 50 kE expected to be received from EU, ask institute to be only associate partner (no direct fund received from EU, travel + subsistence for meetings/beam test). Need to maximize efficiency of funding. Ask National contact/country to focus on a few activities and possibly give priority if reduction needs to be implied. Any priority from ILC/CLIC community ?

EUDET meeting 21/10/09 4 Referee comments to DevDet (12.5/15) Scientific and/or technological excellence : 4.5/5 The general concept of stewarding a broad technology base of detector development and testing is an extremely good one, and necessary for the long-term health of the field of high energy physics. For this reason, on the whole, this is a very good proposal. This premise needs some qualification however, particularly in light of the significant resources requested from the EC. Within the four areas identified within the European Strategy for Particle Physics (SLHC, LC, Neutrinos and Super-B) there is a wide range of how immediately and with what priority R&D needs to be accomplished. The LHC Luminosity Upgrade requires prompt attention, and one or more major neutrino facility projects will certainly begin soon for which structuring and technical work must also begin soon. On the other hand, the situation with the ILC and higher energy Linear Colliders has become rather complex, and what (if anything) will be built needs to await results from the LHC. The Super-B is intended as a regional rather than a European project. There are several aspects of this proposal which are pushing the state-of-the-art, for example in the areas of simulations, and radiation-hard and 3D-integrated semiconductor detectors. Regarding the Networking activities, the coordination of long baseline neutrino experiments looks like a very worthy idea. A project office for linear collider detectors may be less interesting for a few reasons; in addition to the comments above, one might worry that it would preempt or work at crosspurposes with the GDE. Also, by definition, detectors for linear colliders are much less technologically stressing than those for hadron machines such as the LHC. Regarding the Transnational access, the point is well made that test beams potentially represent a choke-point, and upgrading and expanding access to them should be given high priority. There is a question about how much total demand the DetDev program will make, and whether all of the smaller facilities are needed. The JRAs (NA?) are outstanding. In particular, of highest value are the studies of rad-hard and 3Dintegrated semiconductor detectors; simulation tools that allow for realistic misalignments of detector systems, and pile-up due to high rate; and the European Vertical Integration Facility (EUVIF).

EUDET meeting 21/10/09 5 Referee comments Quality and efficiency of management : 4.0/5 CERN provides the backbone of the management and the overall plan is very professional. The individuals and institutions involved are first-rate and successful implementation can be assured. For reasons stated above, it is of concern that the resources towards the LC component of the program (~35% of the proposal) may be disproportionate. Also, we are somewhat skeptical that all of he 7 smaller facilities need to be supported, especially in the name of redundancy. Their capabilities have significant overlaps and no estimate was made for the total program need for DevDet.

EUDET meeting 21/10/09 6 Improving DevDet  AIDA Concerns about R&D priorities in term of schedule with respect to European strategies for particle physics :  can be improved with more emphasis on possible synergy between different communities for same technologies (micro pattern gas detector, vertex detector), and justifying better why these R&D are important now even for a project starting in 20xx… Disproportionate resource towards LC (35 %)  Try to better balance WP budgets  Minimise WP/tasks only LC oriented and make JRA more transversal Too many irradiations facilities :  Need to reduce by one or two + better justification of users requests over the project RadHard 3D semiconductor detectors, simulation/software tools and EUVIF considered as high value :  Should keep these WP similar (EUVIF  LC test beam coordination) To improve score on impact through the development and dissemination and use of project results  Include a survey of industrial involvement in detector construction

EUDET meeting 21/10/09 7 Organisation of the AIDA call Coordination group has been endorsed by RECFA meeting at EPS conference in Krakow, discussed at CERN council (Sep) : Preparation Team sLHC L.Serin (IN2P3) C. Shepherd (RAL) sLHC L.Serin (IN2P3) C. Shepherd (RAL) Linear Collider T.Behnke (DESY) (+ K. Buesser (DESY)) Linear Collider T.Behnke (DESY) (+ K. Buesser (DESY)) Neutrino Facilities P.Soler (U.Glasgow) Neutrino Facilities P.Soler (U.Glasgow) B-Physics F.Forti (INFN) B-Physics F.Forti (INFN) Admin and Integration M.Capeans (PH-DT), K.Ross (PH-AGS) S. Stavrev (DG-EU), H.Taureg (PH-DT) K. Kahle (DG-EU), C. Brandt (DG-EU) Admin and Integration M.Capeans (PH-DT), K.Ross (PH-AGS) S. Stavrev (DG-EU), H.Taureg (PH-DT) K. Kahle (DG-EU), C. Brandt (DG-EU) “Advisers” and WP authors L.Linssen (CERN), S.Stapnes (Oslo), + WP leaders “Advisers” and WP authors L.Linssen (CERN), S.Stapnes (Oslo), + WP leaders Preparation group work started since end August only…  Proposal is expected to cover Infrastructure needs for R&D for new detectors at sLHC, LC/CLIC + neutrino/flavour physics projects.  Need to have the proposal correctly balanced between sLHC and LC/CLIC  Information is going trough the National Contact for each country (23) and through the experiments  Important that every actor is participating to the call but do not forget 10 M € for > 100 Institutes

EUDET meeting 21/10/09 8 WP3 - Microelectronics - 3D interconnect technologies WP2 - Detector description - Simulation - Reconstruction Detector design and construction WP7, WP8 Radiation qualification of materials at irradiation facility WP5, WP6 WP8,WP9 Tests at a test beam before irradiation WP7 Irradiation of full detectors at irradiation facility WP5, WP6, WP9 Test at test beam after irradiation Data Analysis Relation with industry (dev phase->large scale construction) Cover detector design from first R&D ideas (simulation, choice of material, beam test + analysis) up to detector construction (needs of tight links with Industry) while pushing some technologies which are at the state of the art (3D semiconductor and electronics…) Global view of AIDA Budget for infrastructure not for R&D.

EUDET meeting 21/10/09 9 AIDA work package breakdown 9500

EUDET meeting 21/10/09 10 WP1 : Project management and documentation Goal : management and steering of the whole project (monitoring/reporting, financial follow-up of the project) Documentation (web page, outreach) Organisation of steering committee and plenary annual meetings CERN being coordination lab of the AIDA project, main partner of this package is CERN Budget ~500 kE : 1FTE over 4 years (0.5 project coordinator, 0.5 project assistant) Support for Project Progress Tool (used in EUCARD, SLHC PP). Outreach and dissemination activities + plenary meeting organisation CERN will provide additional support : 0.2 FTE project manager 0.2 FTE Administrative assistant 0.1 FTE Finance officer 0.2 FTE Dissemination/communication S. Stavrev (CERN/EU), L. Serin (IN2P3/LAL)

EUDET meeting 21/10/09 11 Governing Board Project Coordinator Deputy Project Coordinator One representative from each beneficiary Institute (full partner or third party) Associate partner as non voting member ? Management Team Project Coordinator Deputy Project Coordinator Administrative Manager WP3-NA Leader WP5-TA Leader WP8-JRA Leader Management Structure WP2-NA Leader WP9-JRA Leader WP4 NA Leader WP10-JRA Leader Steering Committee WP6-TA Leader WP7-TA Leader WP1-MGT Project Management EU external scientific advisory community

EUDET meeting 21/10/09 12 WP2 : Development of common software tools (NA) P. Mato (CERN), F. Gaede (DESY) Goal: develop core software tools that are useful for the HEP community at large and in particular for the next big planned projects: sLHC and Linear Collider (ILC/CLIC) Focus on two major tasks: 1)develop generic HEP - geometry toolkit : Description of description of complex shapes, materials and sensitive detectors Interfaces to full sim program (G4, flucka…), reconstruction program, detector geometry, visualization tools (ROOT, VRVL…), to allow misalignment/calibration (database)….. 2) develop – detector independent - reconstruction tools Generic alignment tool, tracking and vertexing toolkit with state of the art (GSF, Kalman, Hough transform…) and working in pile-up environment, generic particle flow algorithm… Budget : 1.1 ME Today already about 10 partners identified mainly LC

EUDET meeting 21/10/09 13 WP3 : microelectronics and detector/electronics integration (NA) H. G. Moser (MPI), V. Re (Univ Bergamo) Goal : The main objective of this work package is to establish a network of groups working collaboratively on advanced microelectronics and integrated detector/electronics concepts. Task 1: 3D Interconnection of microelectronics and semiconductor detectors - Demonstration of the feasibility of 3D interconnection for applications in Particle Physics (using vias last instead of vias first in Fermilab effort) - Subdivision of the final objectives into a set of well defined sub-tasks: - Design of and production of dedicated ASIC and sensors - Preparation of wafer thinning and via etching. - Development of high density interconnection technology with direct chip-chip contact by different techniques - Organization of common Multi-Project-Wafer runs to evaluate different solutions developed by collaborating Institutes Task 2: Shareable IP Blocks for HEP  common access to MPW - Might contain blocks 130 nm (90 nm) CMOS technology and BiCMOS SiGe for low noise application. Still to be discussed Budget : 1.1 ME. Today 16 institutions involved… (sLHC + LC)

EUDET meeting 21/10/09 14 WP4 : Relations with industry S. Stapnes (Oslo Univ), P. Sharp (STFC ) Goal : Overall goal: address for the 4 projects – sLHC, ILC/CLIC, Det., SuperB : Technology needs, specs, trends in several area (5-10 years?) Interactions with industry in development phase and during (large scale) constructions phase Transfer to industry, industry related spin-off, and collaboration with other fields where this is relevant. Deliverable : Create WEB overview and report covering in a matrix key technologies and specs (x-axis) versus the four projects mentioned (y-axis). Industry can link to these nodes describing their capacities. Possible covered topics : Silicon sensors, Microelectronics technologies, Optoelectronics and Link Technologies, 3D integration and interconnecting technologies (use a group or two from WP3), Scintillators and SiPM (Photodetector in general?), Power distribution (on detector – use SLHC-PP WP8 groups), MicroPattern Gas Detectors (use RD51 ?)…. Need key participants from each “detector community” inside these areas in WG and topics to be decided by community. Budget : 0.3 ME (mainly travel / meeting). Only a very few full partner, other will be associate

EUDET meeting 21/10/09 15 WP5 : Access to DESY testbeam (TA) I. Gregor (DESY) Three test beam lines with 1-6 GeV/c electrons with up to 5kHz particle rate + photon beam Infrastructure offered contains : beam line (magnet control, interlock systems, patch panels, gaz warning, fast internet connection) + user support (translation stages, gaz premix, magnet 1T, beam telescopes). 5T magnet but not in beam Complementary to CERN with more time availability beam with longer period ( 4 weeks). Can be used especially for long first debugging phase of prototype Budget : 100 kE (half for consumable + FTE, half for user support (travel + subsistence) Budget might be slightly increased if a lot of associate partners in project

EUDET meeting 21/10/09 16 WP6 : Transnational Access to CERN beam and irradiation facilities (TA) H. Taureg (CERN) - Access to PS and SPS test beams - Access to PS irradiation facilities - Proton beam - Mixed field (mainly neutron) irradiation - Access to GIF ++ Budget : 150 kE (include some consumables + user access travel/subsistence) Budget might be slightly increased in a lot of associate partners in project Try to set up a light panel covering both DESY and CERN to manage beam priority/users if needed Will give priority for travel/subsistence to people from associate partners (and students ?). Any experience from EUDET ?

EUDET meeting 21/10/09 17 WP7 : Access to irradiations facilities (TA) M. Mikuz (Lubjana univ ) Main negative referee comment in DevDet was too many irradiations facilities supported in the project (7)… We are in the process to limit them to 4-5 based : - on their users statistics, -On users needs. we are still trying to get the experiments needs over the next 4-5 years (fluence, particle mix, sample size…) - Probably better to support multi-sources sites (Regional aspect ???) Have to check with EU if one can have a user selection panel and finance on dedicated user requests some irradiation at other facilities (which then appear also in the proposal but not with direct fund). Budget : 0.65 kE (mainly for user access to irradiation periods + beam cost) Main interest from sLHC community

EUDET meeting 21/10/09 18 E. Gschwendtner (CERN), H. Taureg (CERN ) WP8: improvement and equipment of irradiation and beam lines 8.1 : Beam line improvement Edda + Hans CERN test beam : (Interest for LC/CLIC + neutrinos) - Enlarge particle choice (K0) & energy, improve particle identification - Provide LC/CLIC like spill structure Frascati test beam (Interest for flavour physics community) - characterize BTF beam line for electrons and photon -provide and install permanent control and monitoring system for beam position, width and energy in the BTF beam line Partners: CERN, LNF Group all communities needs about primary improvement & equipment of beam and irradiation lines. Five tasks : Budget : 2.6 ME JRA

EUDET meeting 21/10/09 19 E. Gschwendtner (CERN), H. Taureg (CERN ) WP8: improvement and equipment of irradiation and beam lines 8.2: Upgrade of proton & neutron irradiation facilities at CERN M.Moll Design second beam line Equip and test second beam line Design and test cooling infrastructure for electronics tests Partners: CERN, some British universities 8.3 : Qualification of components and common database S. Canfer Review experience from LHC Develop common data base for irradiation test results Qualify materials and components of detector systems (Recent contact with ATLAS/CMS about diamond R&D) Populate and maintain the common database Disseminate and publish irradiation results Partner list not yet defined. Any interest from LC community ?

EUDET meeting 21/10/09 20 E. Gschwendtner (CERN), H. Taureg (CERN ) WP8: improvement and equipment of irradiation and beam lines 8.4 : General infrastructure for test beam and irradiations lines Hans Develop test beam tracking and trigger telescopes (some interest from LC/CLIC and sLHC communities) overlap & fit better in with 9.2 Develop and test TASD target for neutrino tests Develop and test MIND spectrometer for muon identification Improve GIF++ users infrastructures for sLHC muon detector tests (RPC, Drift tube…) 8.5 : Coordination of combined test beam T. Behnke Only for LC/CLIC to ensure coherence between their various test and continuation of EUDET. Small budget

EUDET meeting 21/10/09 21 M. Vos (Valencia Univ ), H. Videau (IN2P3/LLR ) WP9: Advanced infrastructures for detector R&D (JRA) Divided in four tasks detector/technology oriented : 9.1 and 9.2 are expected to be balanced between ILC/CLIC + sLHC 9.3 and 9.4 are mainly ILC/CLIC 9.1 Gaseous tracking facilities Complementary to 8.4 and GIF ++. Might concentrate on MicroPatternGasDetectors in view of ILC/TPC and sLHC muon detectors (Interest from ATLAS/MicroMegas and CMS/GEM) Could contain : some improved infrastructure at DESY for LC TPC tests Upgrade of CERN/EN-ICE workshop to overcome limitations to produce large area detector (MicroMegas and/or GEM…)  Would need also non negligible contribution from CERN itself ?  Have to see if possible to involve non CERN partners.  Interest/support from LC community : TPC, Had calo ?

EUDET meeting 21/10/09 22 WP9: Medium advanced infrastructures for detector R&D 9.2 Precision pixel infrastructure Would like to build the task around common infrastructure for pixel detectors for both sLHC and LC/ILC community even if goals are quite different : radiation tolerant with high speed readout against very high accuracy and alignment method. Could include : - One beam telescope as deliverable even if in fact two might be needed to cope both communities goal. - Emphasis on integration aspects : cooling (dedicated boxes), use of CO2.. - Detector control systems to setup detectors parameters - Mechanical support / scanning table to be used by different prototypes This task is crucial for the proposal to show synergy between community

EUDET meeting 21/10/09 23 WP9: Medium advanced infrastructures for detector R&D 9.3 Granular calorimeter studies infrastructure Built around ILC calorimeter integrations (EM + HADs with Silicon strips in front) for validation of PFA (not directly in beam test but comparison to simulation, response to low energy particle of different types). Test of electronics with ILC/CLIC like cycle to test power on/off + cooling 9.4 Common DAQ infrastructure Dedicated to LC/CLIC integration of various sub-detectors

EUDET meeting 21/10/09 24 Proposal submission schedule National contact meeting : October 6 th October 26th : Contents of WP finalized, first draft of WP text & partners list Preliminary budget breakdown for each WP November 9th : Finalized list of partner in each WP Iteration on budget sharing National Contact texts Second meeting with national contact All WP contributions finalized November 23th December 1st : Proposal submission ……………………………………… Selection results ~Apr/May 2010 If successful, negotiation phase (2-3 months), formal agreement (~3months). First budget delivery end 2010/beg 2011 VERY TIGHT SCHEDULE

EUDET meeting 21/10/09 25 WEB pages Link to AIDA public Web page : Link to DevDet Web page with the proposal which was submitted