Documenting Camera Base Facility Needs P Hascall.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Installation/Agency Name – SC Tier II Team Update Template Presenter Name Date.
Business Processes, Information, and Information Systems
Documenting a Software Architecture By Eng. Mohanned M. Dawoud.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
ATA Practice Guidelines for Video- based Online Mental Health Services “The guidelines pertain to telemental health conducted between two parties, and.
Remote Desktop Access Novell at Home. Remote desktop access Works on Broadband Computer at work must.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
CS347 Review Slides (IR Part II) June 6, 2001 ©Prabhakar Raghavan.
6/19/2007SE _6_19_TSPImp_SVT_Lecture.ppt1 Implementation Phase Inputs: Development strategy & plan Completed, inspected & baselined SRS & SDS.
Standards Certification Education & Training Publishing Conferences & Exhibits 13 February Sensicast Systems Network Layer General Comments This.
Electronic Communications Electronic Communication Policy at Loughborough College Clare Holden Learning Resources Manager Loughborough College.
Virtual Meetings Increasing Collaboration While Reducing Costs and Ensuring Business Continuity Ram Narayanaswamy CTO 8x8, Inc.
We are Network Engineers
Refining the CDMS specification Bruce Bannerman Australian Bureau of Meteorology Co-Chair Expert Team.
Project Scope Management
Connecting To A Remote Computer Via ‘Remote Desktop Web Connection’ Compatible With ‘Most Any’ Computer.
FCMAT Technology Recommendations Fil Duldulao Shawn Cabey David Flores Julienne DeGeyter.
Selected Topics on Databases n Multi-User Databases –more than one user processes the database at the same time n System Architectures for Multi-User Environments.
Microsoft Office Communicator A General Introduction.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
Foundation Concepts Information Infrastructure: –The physical facilities, services, and management that support all organizational computing resources.
MyFloridaMarketPlace Roundtable January 21, :00 a.m. – 12:00 p.m. MyFloridaMarketPlace.
2Object-Oriented Analysis and Design with the Unified Process The Requirements Discipline in More Detail  Focus shifts from defining to realizing objectives.
Chapter 3: Project Management Omar Meqdadi SE 2730 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Building Capacity for Technology in Upward Bound Projects Upward Bound Forum on Technology Chicago, IL - July 24, 2002 Angela D. Benson Assistant Professor.
Working Groups on Course Project. Reminder: Project Report Assignment Written text should be 7-10 pages, including the following sections: Introduction.
1 Kyung Hee University Chapter 15 Connecting LANs, Backbone Networks, and Virtual LANs.
Integrating SharePoint and Office Module 6. Overview  Adding Office Documents Through Office  Creating Workspaces  Working with Spreadsheets  Using.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Proposal Development Resources at UNL Tisha Mullen Director of Proposal Development September 25, 2015.
Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Take Confident Steps Towards Virtualization Phil Utschig Solutions Architect September 15, 2008 Springfield, IL.
By:miguel iturrade.  A computer network is a group of computers that are connected to each other for the purpose of communication.
DocuShare Replacement with SharePoint and Active Directory
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
HCR 240 Week 2 Assignment Electronic Medical Record Speech Explain what an electronic medical record is, summarize the major features and benefits of EMRs,
ACC 556 Week 5 Learning Team References Submit your learning team’s intended list of references for the team assignment (that is due at the end of next.
Verification Matrix Process
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
SIP/2012/ASBU/Nairobi-WP/19
LSST Commissioning: FY18 Planning
Creating a Action Plan July 2016.
What are DM folks working on?
Project Planning & Scheduling
Type Topic in here! Created by Educational Technology Network
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
Connecting LANs, Backbone Networks, and Virtual LANs
Connecting LANs, Backbone Networks, and Virtual LANs
NTC 324 Competitive Success-- snaptutorial.com
NTC 324 Education for Service-- snaptutorial.com
NTC 324 RANK Perfect Education/ ntc324rank.com.
NTC 324 Teaching Effectively-- snaptutorial.com
Management Breakout: MREFC Budget Summary Victor L
[Program Name] Evaluation Plan
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Enterprise Infrastructure
Type Topic in here! Created by Educational Technology Network
Type Topic in here! Created by Educational Technology Network
Type Topic in here! Created by Educational Technology Network
GLAST Large Area Telescope:
KNOWLEDGE MANAGEMENT (KM) Session # 42
Presentation transcript:

Documenting Camera Base Facility Needs P Hascall

Overview 2 The topic is how to close the loop on documentation for Camera Base Facility needs as a follow-up to a recent Observatory CCB. The camera needs at the base facility were provided informally and have not been systematically documented. This session will address how those requirements will be formally defined and lay out the plan for refinement of those needs. Additionally the needs provided were initial estimates which need to be refined.

Categories of resource needs and where documented 3 ResourceWhere currently documented/discussion Computer racksLSE-239 Mirror control roomLTE-190 Office spaceLTE-190 Network connectivity at base facilityCould be LSE-78 Network connectivity to and from remote sitesCould be LSE-78 Computer processing capability (commissioning cluster) TBD Who provides desktop computers and racksTBD

Path forward on documentation Two approaches listed below, others? Distribute the requirements in existing documents – Simplest (small additions to existing docs, assuming we find a document for each type) – Some of those documents are telescope controlled documents intended for vendors and the added detail may cause confusion – Harder to ensure that the camera needs are included Generate a single doc to cover camera, DM and T&S resources – Easier to see how the resource requirements interrelate – Additional document to write and manage 4

Refining the Camera Needs Chuck and Kevin will be collaborating on camera team interactions with the observatory for early integration and commissioning. They will define timelines and can include personnel loading Base facility computational facility needs (remote use of diagnostic cluster vs Commissioning cluster and how much Commissioning cluster capability is needed Use of remote computational facilities with data access through NCSA 5

Wrapup Summarize decisions and assign responsibilities 6