© GMV, 2011 Property of GMV All rights reserved Dependability Procedures for CTA-ACTL CTA Amaya Atencia (GMV) Teo Bernardino (UCM_ELEC/GMV) May 17 th,

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

Critical Infrastructure Protection Policy Priorities Sara Pinheiro European Commission DG Home Affairs.
Operation & Maintenance Engineering Detailed activity description
ISO 9001 : 2000.
Process Safety Management for Biofuels 1.Overview of Process Safety 2.Compliance with standards 3.Process Hazard Analysis 4.Standard Operating Procedures.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Software Quality Assurance (SQA). Recap SQA goal, attributes and metrics SQA plan Formal Technical Review (FTR) Statistical SQA – Six Sigma – Identifying.
Scandpower AS P.O. Box 3, N-2027 Kjeller, Norway Risk management in the Scandinavian railway industry Karl Ove Ingebrigtsen Vice president Sweden Norway.
Stepan Potiyenko ISS Sr.SW Developer.
Reliability Risk Assessment
Overview Lesson 10,11 - Software Quality Assurance
The Australian/New Zealand Standard on Risk Management
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Jos Devlies, Eurorec.
SQA Architecture Software Quality.
Quality Risk Management ICH Q9 Annex I: Methods & Tools
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Session No. 4 Implementing Service Providers SMS Implementing the State’s Safety Programme SMS Senior Management Workshop Rome, 21 May 2007.
KNAUF INSULATION GmbH SAFETY MANAGEMENT PROCESS Kevin W. Donohue Manager, Corporate Safety Corporate Environmental Health and Safety Group EHS
Software Dependability CIS 376 Bruce R. Maxim UM-Dearborn.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Software Project Management
Software Project Management
Introduction to Systems Analysis and Design Trisha Cummings.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
SQA Architecture Software Quality By: MSMZ.
Occupational Health and Safety
1 Chapter 2 Socio-technical Systems (Computer-based System Engineering)
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Topic (1)Software Engineering (601321)1 Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Root Cause Tutorial Page 1 More on Hazard Identification Techniques 1.Identify potential hazards that could threaten the safety of your employees,
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
Socio-technical Systems (Computer-based System Engineering)
FAULT TREE ANALYSIS (FTA). QUANTITATIVE RISK ANALYSIS Some of the commonly used quantitative risk assessment methods are; 1.Fault tree analysis (FTA)
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Vegard Joa Moseng – Student meeting. A LITTLE BIT ABOUT SYSTEM RELIABILITY:  Reliability: The ability of an item to perform a required function, under.
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Safety-Critical Systems T Ilkka Herttua. Safety Context Diagram HUMANPROCESS SYSTEM - Hardware - Software - Operating Rules.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 9 Slide 1 Critical Systems Specification 1.
Unit-3 Reliability concepts Presented by N.Vigneshwari.
Software Engineering Lecture 8: Quality Assurance.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
Roadmap for CTA Quality working groups Teo Bernardino (UCM_ELEC/GMV) May 18 th, 2011.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
European network for Health Technology Assessment | JA | EUnetHTA European network for Health Technology Assessment THL Info.
LECTURE 7 AVIATION SAFETY & SECURITY
BY AMAR P. NARKHEDE MAINTENANCE PLANNING. PLANNED PROGRAMME FOR MAINTENANCE Phase I 1. Prepare a list of all machines and equipments to be covered and.
Presented By Copyright 2011 Concord Associates Pte Ltd ConSASS Audit and Auditor’s Key Observations.
OH&S Plant Obligations make
Quality Management ISO 9001
Software Quality Assurance
Software Project Management
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Case Studies Version 1.0, May 2015.
Buffalo Trace District Health Department
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Critical Infrastructure Protection Policy Priorities
Quality Risk Management
HSE Case: Risk Based Approach.
Unit I Module 3 - RCM Terminology and Concepts
Chapter # 6 Software Configuration Management
Fertilizer Industry Safety Information Analysis and Sharing Program
ENIPSSA The Portuguese National Homelessness Strategy
Quality Management Anita Téringer– ITS Hungary
Review and comparison of the modeling approaches and risk analysis methods for complex ship system. Author: Sunil Basnet.
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

© GMV, 2011 Property of GMV All rights reserved Dependability Procedures for CTA-ACTL CTA Amaya Atencia (GMV) Teo Bernardino (UCM_ELEC/GMV) May 17 th, 2011

© GMV, 2011 PRESENTATION OBJECTIVES The main goals of current presentation are: Introduction to the Risk Assessment Dependability and Safety (RADS) WP in general, and Dependability (Reliability, Availability & Maintainability - RAM) in particular. Justify its necessity as the mean to ensure the reliability requirements in CTA. Present the RADS management policy. 09/06/2016

© GMV, 2011 RADS WP within CTA organization The need for Dependability (RAM) procedures –What is Dependability (RAM)? –Why should it be applied to CTA? –Effort and consequences of NOT applying RAM Dependability procedures RADS management within CTA AGENDA 09/06/2016

© GMV, 2011 Property of GMV All rights reserved Context of RADS WP within CTA A little bit of

© GMV, 2011 RADS WP WITHIN CTA ORGANIZATION 09/06/2016 Risks, DPN and Safety J. M. Miranda Dependability DPN stands for RAM: -Reliability -Availability -Maintainability

© GMV, 2011 Property of GMV All rights reserved RAMS? Why

© GMV, 2011 THE NEED FOR RAM PROCEDURES (I) So, what is Dependability (i.e. RAM)? A system is dependable when it is –available for use when required, –rarely fails when in use, and –when it does fail is easily repaired Are there means to ensure that a system is dependable? >Yes, and are widely used in the industry. 09/06/2016

© GMV, 2011 THE NEED FOR RAM PROCEDURES (II) According to W. Hofmann’s presentation in last CTA meeting at RAL (UK): “CTA telescopes should be 5 times more reliable than current existing ones” In order to meet this requirement, it is mandatory to include procedures to evaluate/improve the dependability of CTA telescopes, i.e., introduce RAM techniques. 09/06/2016

© GMV, 2011 THE NEED FOR RAM PROCEDURES (III) What are the benefits of performing RAM activities in parallel to a system design & implementation? Identification of failure modes. Improvement of design robustness. Avoidance of single failure points (e.g. with redundant systems). Definition of an appropriate maintenance plan –Preventive –Predictive –Reactive 09/06/2016

© GMV, 2011 THE NEED FOR RAM PROCEDURES (IV) RAM assessment within a system is neither cheap, nor effortless: Approximately 5% of the complete manpower of a critical system is spent in RAMS activities However, what would it happen if each single IACT of CTA has a failure rate of 10%? CTA would become a redundant observatory with 90% of the telescopes operational at each time (i.e telescopes would be backup rather than operational) 09/06/2016

© GMV, 2011 Property of GMV All rights reserved PROCEDURES & MANAGEMENT RAMS

© GMV, 2011 Proposed Dependability and Safety procedures: DEPENDABILITY (RAM) PROCEDURES (I) 09/06/2016 Preliminary Hazard Analysis Fault Tree Analysis Failure Mode Effects Analysis EMBT: Estimated Time Between Failures EMTTR: Estimated Mean Time To Repair

© GMV, 2011 RADS MANAGEMENT PROPOSED FOR CTA (I) RADS WP is responsible for the –Elaboration of the RADS documentation –Training of LQM’s –Collecting and reporting the RADS outputs –Coordination with QA and QC WP’s The RADS activities are performed at different levels: RADS management level –Elaboration of RADS plans, templates –Reports on RADS activities at project level LQM level –Implementation of RADS plans on each WP –Reporting on RADS activities at WP level 09/06/2016

© GMV, 2011 RADS MANAGEMENT PROPOSED FOR CTA (II) 09/06/2016 RADS Plans& TemplatesRADS reports Audits Audit reports Training Reporting Checklists on RADS

© GMV, 2011 RADS MANAGEMENT PROPOSED FOR CTA (III) Current RADS on-going activities: Preparation of RADS documentation –Elaboration of RADS plans, templates Training in RAMS techniques –Preparation & instruction of the training courses –Courses adapted for each Work Package Interaction with other WP’s –Contribution to CTA QA plan On demand support to RADS activities 09/06/2016

© GMV, 2011 Property of GMV All rights reserved Thank you! Amaya Teo