16 July 2014 Development of Eskom Real Estate Master Plan detailing Asset Management Solution, Property Management Solution, Procurement and Financial.

Slides:



Advertisements
Similar presentations
COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
Advertisements

ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032 Date: 15 January 2013 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00021 Date: 30 July 2012 Time: 10:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009 Date: 26 March 2014 Time: 11:00.
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004 Presenter: Anna Mosupyoe and Ravi Moodley Date: 24 January 2012 Time: 10:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(I) and (II) Date: 25 June 2015 Time: 11:00.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date: 04.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00028 Date: 12 November 2012 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00034 Date: 14 January 2013 Time: 11h00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008 Date: 24 March 2014 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2013 /00009 Date: 27 May 2013 Time: 11:00.
a guidance to conversion
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00029 Date: 07 December 2012 Time: 11:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV) Date: 23 June 2015 Time: 14:00.
ENQUIRY NO. CORP 3140R CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING, SUPPLY, DELIVERY AND OFF- LOADING OF ESTIMATED.
ENQUIRY NO. CORP 3035 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING AND SUPPLY OF ESTIMATED QUANTITIES OF COMPOSITE,
26 March 2015 Clarification meeting: Scaffolding and Insulation material.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
Quality Management Supplier Quality Requirements Clarification Meeting Civil work at Dinaledi Sub Station Presentation By: Mothusi Itumeleng 16 July 2014.
Clarification Meeting: Provision of laundry services at the Kendal Contractor’s Village and Wilge Artisan Village 14 August 2015 Tender no: Tender no:
GROUP TECHNOLOGY & COMMERCIAL TACTICAL PROCUREMENT PROCUREMENT PROCESS PRESENTED BY MARTHA DE BRUYN 24 NOVEMBER
Environmental Requirements for Supply of inline Gas Filters on GIS balancing pipe Compiled by: Silindile Mbhele.
THE PROVISION OF CATERING SERVICES FOR THE MKONDENI OFFICE COMPLEX IN THE KZN OPERATING UNIT Date: 23 OCTOBER 2015 Venue: MKONDENI Time: 11H00.
Clarification Meeting: Drifling and Testing of boreholes and Water Reticulation design and Construction for the relocated communities at Kusile Power Station.
The Provision of Facilities Management Services to Eskom Real Estate (ERE) Corporate & Zone office buildings in Gauteng Clarification Meeting on 26 February.
Enquiry clarification meeting Technical Auditing (Physical Audits) services and confirmation of installed Compact Fluorescent Lamps (CFLs) PS(IDM)/2015/ZN/01.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF ENVIRONMENTAL SERVICES 11 JULY 2014.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF LAND VALUATION SERVICES CORP March 2015.
Tender Clarification Meeting for Batteries: CORP3320 Date: 18 September 2015.
23 Sept 2014 The supply of spare parts and special tools for five (5) peaking generation Open Cycle Gas Turbines (OCGT) units at Gourikwa Power Station.
Environmental Requirements for BENBURG SUBSTATION 3RD 250MVA 275/132KV TRANSFORMER - CIVIL WORKS.
CLARIFICATION MEETING FOR THE PROPOSED CONTRACT FOR THE REMOVAL OF INCANDESCENT LIGHT BULBS AND THE REPLACEMENT WITH COMPACT FLORESCENT LAMPS (CFL) BULBS.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
ENQUIRY NO: MPPPSC The drilling of boreholes, supply and installation of windmills. Prepared by: Hector Mabaso Date: 05 May 2016.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
SHE Requirements for the Eskom Procurement and Supply Chain Management Process ( ) Nomusa Leburu.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Kusile Power Station Project Enquiry clarification meeting Kusile Power Station Project Provision of two (02) independent environmental control officers.
16 March 2015 RFP GEN3261 Clarification meeting: Tutuka Coal Terminal Handling Service.
Invitation to Tender No The Provision for Polygraph Test Services Period 5 Years CORP 3293.
DD 6101/TS POLE REPLACEMENT, RSI MAINTENANCE AND EMERGENCY ELECTRICAL & DD6102/TS RSI MAINTENANCE Date12 June 2014.
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
Civil works at Upington Substation. Commercial Presentation Date: 19 October 2015 Presenter: Ngiphile Nkwanyana Ref: PS(PDP)/2015/NN/07.
ENQUIRY NO. CORP 3282 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE MANUFACTURE, TESTING, SUPPLY AND DELIVERY (TRANSMISSION, DISTRIBUTION AND.
04 March 2014 Request for Proposal (RFP) the provision of professional services for the Eskom Academy of Learning (EAL) Refurbishment project for a period.
Clarification Meeting : CORP 3309 FOR THE PROVISION OF CONFIGURATION MANAGEMENT SERVICES FOR A PERIOD OF FIVE (5) YEARS Auditorium 1, Eskom Enterprise.
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
Quality Management: Mutually beneficial supplier relationships.
Quality Management Supplier Quality Requirements Clarification Meeting Media Monitoring Mothusi Itumeleng.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date:
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RFP /2017/00033 Supply and delivery of Corporate Uniform Date: 07 July 2017 Time: 11:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00034
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00028
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(III)
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00021
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2013 /00009
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV)
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ HO /00215
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00029
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
How to conduct Effective Stage-1 Audit
Presentation transcript:

16 July 2014 Development of Eskom Real Estate Master Plan detailing Asset Management Solution, Property Management Solution, Procurement and Financial Approaches and Execution Plan PS(HO)2014/GS/01 Clarification Meeting

2 AGENDA TimeItemFacilitator 10:00Welcome & Safety EvacuationMWP Safety Rep 10:05Project Background & Technical Requirements  Scope of work  Key deliverable  Technical evaluations Bafana Hlophe 10:15Commercial and SDL RequirementsElvis Mulovhedzi 11:00Health & Safety RequirementsPhillip Mathebula 11:30Quality RequirementsMothusi Itumeleng 11:45Financial RequirementsElvis Mulovhedzi 12:15Questions & AnswersAll ClosureElvis Mulovhedzi

Project Background and Technical Requirements

Commercial & SDL Requirements

Commercial Requirements  General Information Information sharing is non-compulsory RFP / Tender / Enquiry No. PS(HO)2014/GS/01 Issue 04 July 2014 and closing 07 August 2014; at 10H00 Acknowledgement form Tender Bulletin link: Eskom Representative details (Commercial, Technical, Financial, SD&L): or

Commercial Requirements  Guidelines Deadline of clarification of queries; 31 July 2014 The tender shall be submitted as an original hard copy, plus 1 copy (identical to the original), and x1 soft copy in CD / USB The soft copy is not a substitute for hardcopy which must still be provided. Failure to adhere to this requirements will render tenderer non-responsive and the tender that does not meet the requirements will be disqualified. The proposal must be indexed and structured into 3 sections: o Section 1 – Commercial Proposal (Commercial returnable including Prices/Financial information) o Section 2 – Technical Proposal (Separate subfolders, into; Technical, Safety and Quality) o Section 3 – Supplier Development and Localisation NB: Prices on hard copies must be identical to the ones on the CD /USB.

Commercial Requirements  Guidelines cont… o Proposals marked ‘Confidential’ and displaying the RFP no. PS(HO)2014/GS/01 and the tenderer’s name should be deposited to the Eskom Tender Box located at : Tender Office (Opposite Main Reception) Eskom Megawatt Park Office 1 Maxwell Drive Sunninghill Ext. 3Sandton Johannesburg The tender offer validity period is twelve (12) weeks 7

Commercial Requirements  Evaluation Criteria Preferential Procurement Policy Framework Act (PPPFA) evaluation process (90/10 methodology) Commercial requirements i.e. tender returnable and compliance to the submission criteria Two steps (2) evaluation Steps: I.Functional Analysis (Technical and SHEQ) – 70% threshold II.Price and Preference (90/10) Negotiation items: I. SD&L targets Contract award item: I.Financial capacity 8

SD&L 9  Eskom strategic objective of transformation, reduce unemployment, skills development and equity.  Seek opportunities in procurement  Partner with willing and able suppliers in executing the objective.

Skills Development 10 Tenderers are encouraged to participate in creating experiential training for unemployed learners in the following areas: Type of SkillNumber Real Estate Analyst1

Background 11

Retention 12  In order to ensure compliance and achievement of these obligations a retention of 2% on every invoice paid shall apply.  The amount shall be payable back in full to the contractor on verified achievement of all obligations.  Where a contractor partially achieves its obligations then a portion of the amount shall be refunded based on pre- agreed formula of calculation of penalties.

Health and Safety Requirements

SAFETY REQUIREMENTS 16 July 2014 Thembinkosi Mbolekwa

INTRODUCTION 1.COID Act 2.General Safety Requirements 3.Health and safety plan 4.Risk Assessments for work to be performed 5.Returnable documents for tender evaluation 15

Letter of Good Standing Required 1.COID Act:  An employer carrying on business in the Republic shall within the prescribed period and in the prescribed manner register with the commissioner. 2. Construction Regulations:  The client shall ensure that every PC is registered and in Good Standing with the Compensation Fund or with a licensed compensation insurer prior to work commencing on site. 16

Risk Assessments for work to be performed The tendering contractor shall submit a risk assessment as part of the health and safety plan which must include:  the identification of the risks and hazards to which persons may be exposed to,  An analysis and evaluation of the risks and hazards identified based on a documented method;  A documented plan and applicable safe work procedures to mitigate, reduce or control the risks and hazards that has been identified;  A monitoring plan; and  A review plan 17

Required documents to form part of you Health and safety plan A SHE Policy signed by the CEO; Management structure and legal appointments (company organogram). Resources, Roles, Responsibility and Authority; Competency, training and awareness program Hazard Identification, Risk Assessment and controls & SHE Method Statements. Sub-contractor and Supplier management program( Process applied to select, qualify and monitoring SHE compliance of sub-contractor during work execution.) Letter of Good Standing with The Compensation Commissioner (licensed insurer or equivalent) 2016/06/0918

Required documents to form part of you Health and safety plan Incident management program (Corrective and preventive action management from incidents including lessons learned, communication) Medical surveillance program ( certificate of medical fitness and Man-job specifications-( risk based)) Emergency preparedness and response procedures 19

Tender evaluation process for SHE OHS Requirements:Scores (%) Health and Safety Plan:  Contractor Organogram,  Signed SHE Policy Statement,  Acknowledgement of Eskom Life Saving Rules,  List of OH&S Appointees & CV’s,  Letter of Good Standing,  Sub-contractor Management,  Transporting of workers. 50% Risk Assessments:  HIRA Process,  Risk Rating Process,  High risk management process (e.g. Driving) 30% Incident Management Process:  Incident Investigation Process,  Contractor’s LTIR information,  Incident reporting etc. 20% 20

Quality Requirements

13/05/ QM 58 – Supplier Contract Requirements Purpose - Define the quality requirements/returnable documents which shall be submitted with a tender. Quality requirements are based on ISO 9001:2008. The required Quality requirements/returnable are as follows: o Quality Management System (QMS) Requirements. o Evidence of QMS in operations. o Additional/Customized Requirements (form A and B)  Note: QM – 58 defines the above mentioned requirements (read para 3.2 –and 3.3).  All returnable documents should be in English.

13/05/ Quality Documentation with Tender The supplier shall submit the following quality documentation with the tender: o Quality Management System (QMS) Requirements.  Submit a copy of valid ISO 9001:2008 certification.  OR  Submit an objective evidence of a QMS, consisting of the following: Quality Manual. Document Control Procedure (Clause 4.2.3), Record Control Procedure (Clause 4.2.4), Internal Audit Control Procedure (Clause 8.2.2), Control of nonconforming product (Clause 8.3), Corrective Action Procedure (Clause 8.5.2), Preventative Action Procedure (Clause 8.5.3). Procedure for control of suppliers (i.e. additional procedure).

13/05/ Quality Documentation with Tender Evidence of QMS in operations. Copy of closed out and completed product / process NCR. Copy of closed out and completed product / process CAR. Copy of closed out and completed product / process PAR. Detailed CV of the supplier QMR. Copy of organisational structure indicating QMR position. Historical information register on similar work carried out. Copy of customer satisfaction survey. Additional/Customized Requirements. Form A – Tender & Contract Quality Requirements (App A – QM 58). Form B – Quality Management System Requirements (App B – QM 58).

25 Evaluation Criteria & Weights Ref Clause (QM 58) Supplier Tender Submissions (Checklist) Weights (%) 1.Quality Management System Requirements (ISO 9001):  IS0 9001:2008 Certification OR,  Quality Manual with 6 Mandatory Procedures. 45% 2Evidence of QMS in operation:  Copy of closed out and completed product / process NCR.  Copy of closed out and completed product / process CAR.  Copy of closed out and completed product / process PAR.  Detailed CV of the supplier QMR.  Copy of organizational structure indicating QMR position.  Historical information register on similar work carried out.  Copy of customer satisfaction survey. 45% 3Additional/Customized Requirements.  Form A.  Form B. 10%

Financial Requirements

QUESTIONS & ANSWERS?. 27

Thank you