Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Progress Reports Week 4 Day 1.

Slides:



Advertisements
Similar presentations
1 CS 446 – Tutorial 6 Frid. Nov. 6 th, 2009 Implementation Tutorial.
Advertisements

VERSITET ROBERT STEPHEN BREWER POSTDOC AARHUS UNIVERSITY 29. AUGUST 2014 UNI An Introduction to the 15/5 Report.
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
COVER LETTERS. PURPOSE To explain why you are sending your resume  Never send a resume without a cover letter, unless you are explicitly asked not to.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Progress Reports Week 4 Day 1.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Laboratory Quiz & Data Analysis and Presentation for Written.
Writing SPSS Reports. Assumptions You have taken 100W You achieved basic competence in writing in 100w You have basic competence using a word processing.
Engineering H193 - Team Project Spring Quarter 2005 Gateway Engineering Education Coalition P. 1 Guidelines for Flow Charts and Pseudocode (Performance.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Engineering H193A - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter 2004 Engineering H193A Demolding of Chips Using Inventor for.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Robot Programming Tips Week 4 Day 2 By Matt Gates and.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter 2005 Engineering H193 Project Notebook & Brainstorming Sketches.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Week 6 Day 1 Lecture On and Examples Of Electrical Circuits.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2.
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Individual Competition Week 8 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Individual Competition Week 8 Day 2.
Fundamentals of Engineering for Honors - Team Project P. 1 Spring Quarter 2003 Engineering H193 Project Notebook & Brainstorming Sketches Week 1 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Guidelines for Flow Charts and Pseudocode Week 5 Day 1.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Lecture on Oral Presentations Week 7 Day 1.
Advanced Technical Writing
Engineering H193 - Team Project Spring Quarter 2005 Gateway Engineering Education Coalition P. 1 Laboratory Quiz & Data Analysis and Presentation for Written.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition Performance Review Week 3 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Laboratory Quiz & Data Analysis and Presentation for Written.
Engineering H193 - Team Project Spring Quarter2005 Gateway Engineering Education Coalition P. 1 Lecture on Oral Presentations Week 7 Day 1.
Human Services Practicum
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Week 6 Day 2 Lecture on and Examples of Electrical Circuits.
David Hammitt SBI Coordinator. Agenda Consulting Project Procedure – Guidelines – How to Resources Project Allocation.
Report Writing Format.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Data Analysis and Presentation for Written and Oral Reports.
Assignment 8 information
Proposals Technical Writing. Proposals O different guises O document written by a person, business, or agency who wishes to perform a job or solve a problem.
Lecture for Senior Design Classes By Dr. Pam Estes Brewer Associate Professor, TCO Mercer University School of Engineering Brewer (Adapted from presentation.
Designing Written Reports Presentation for Senior Design Classes by Dr. George Hayhoe Professor, Technical Communication Mercer University School of Engineering.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
Doing Case Instruction1 Case Instructions BUS 302 / FALL 2010.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
1 Welcome to Senior Design 4106 Fall 2005 Section B: Dr. Marc Goetschalckx Dr. Spyros Reveliotis Webpage: Acknowledgement:
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Scientific Communication
What the hell is a “Report” ? ENGL Copyright 2013 by Arthur Fricke “Informal” Reports Can be a few paragraphs to a few pages Generally provide information.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
DESIGN PROPOSAL REPORT. Why write a proposal? Basic means of convincing someone to support a project. Important tool for organizing time and resources.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Samples from Team Working Agreements Design Process – Mockups.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
Effective Business Communication The structure of effective Presentations and Reports.
11/7/07 ABET constraints essay due today timeline/effort matrix due on Friday –read the requirements! –use real dates system requirements due a week from.
Getting Useful Reviews
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Last Day of Class – Spring Quarter Check Grades Turn in Project.
Parts of a Report. Feasibility Reports An outline of a feasibility report may look something like this: Project overview Market Budget Survey Results.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Guidelines for Flow Charts and Pseudocode Week 5 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
11 Proposals and Formal Reports. Introduction Proposals o Informal o Formal Research Writing Formal Reports Elements of Formal Reports.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Engineering H193 Project Notebook & Brainstorming Sketches Week.
ECE361 Engineering Practice
Performance Review Week 3 Day 3 Spring Quarter.
Introduction to New Product Development (Portfolio)
Performance Review Week 3 Day 3 Spring Quarter.
STATUS REPORT.
Chapter Four Engineering Communication
Chapter Four Engineering Communication
Chapter Four Engineering Communication
Technical Communication
Memorandum/(a) (also more commonly memo) is a brief written record or communication, commonly used in business, government, and educational organizations.
Project Overview.
Presentation transcript:

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Progress Reports Week 4 Day 1

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 2 Progress Reports REMEMBER: You are writing the report for the reader WHAT THE SPONSOR WANTS TO KNOW ABOUT YOUR PROJECT –Done right –On schedule –Within budget

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 3 Project Progress Report Purpose –Inform Clients (faculty in this case) on Project progress –Provide record of work done for billing purposes Things to remember –No surprises –Clear and Concise Approximately 4-6 pages - Use Word Processor, CADD, Spreadsheet, etc. Not hand written

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 4 Progress Report (cont.) Written Report –What has been accomplished –Reference Team Decisions –Reference Design Schedule - Ahead, Behind? Use your schedule and highlight tasks done –Reference Sketches/Drawings (copies) attached –Reference Budget Page (copies) attached –Future Plans

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 5 What to Include in a Progress Report Cover Page –Title –Team Number/Name and Members (seat nos.) Have you established a team name? –Date and Instructor –Do it once and keep the template (If you have not yet created a cover page.)

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 6 What to Include in a Progress Report Opening Paragraph –Name of Project –Who’s doing it –Reporting period Executive summary (optional on short reports)

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 7 What to Include in a Progress Report Main Body –Outline what has been done –Demonstrate quality of project –Say what has been considered –Explain decisions –Discuss problems and solutions Schedule (Modify design schedule - attach copy) –Can list what tasks are complete –Better to include schedule with tasks highlighted

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 8 What to Include in a Progress Report Budget (Make a budget page and attach copy) –Planned - use estimates for items, contingencies –Spent to date Future plans –What is to be done in next reporting period - nominally next two weeks

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 9 Practical Hints for Dealing with Sponsors Never mislead a sponsor Never let a sponsor get bad news about your project from someone else If progress report contains bad news, tell sponsor about it before sending progress report No surprises for sponsor Make sponsor look good - particularly to his/her supervisor

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 10 Grade Sheet for Progress Report ItemPoints Cover Page2 Opening / Introduction3 Main Body8 Schedule8 Budget4 Future Efforts3 Format / Clarity / Neatness4 Figures / Sketches4 Bibliography / References4 TOTAL40

Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 11 Assignment Work on progress report – Due Friday, Week 4 Continue with your chassis (chassis w/ wheels under power to go up the ramp due on Friday) Wednesday's lecture will be on Final Reports Special Lecture on Wednesday –Tips and Hints for writing robot control code