BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.

Slides:



Advertisements
Similar presentations
Learning outcomes: PwC’s perspective
Advertisements

Demystifying Construction Lecture 10 : Course Recap & Assessment Exercise Created by Antony Wood, School of the Built Environment, University of Nottingham.
057 CONSTRUCTION PRODUCTIVITY (MAJOR INFLUENTIAL FACTORS)
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Curriculum Development and Course Design
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
EDEXCEL LEVEL 2 BTEC FIRST DIPLOMA FOR ICT PRACTITIONERS
Stepping StonesStepping Stones Programme Stepping Stones Stepping Stones Programme Next Step The Requirements Sylvia Tevlin Human Resources Manager.
Fit to Learn Using the Employability Skills Framework to improve your performance at College The Employability Skills Framework has been developed by business.
A/S Product Analysis Syllabus Development.
Learning Objectives, Performance Tasks and Rubrics: Demonstrating Understanding and Defining What Good Is Brenda Lyseng Minnesota State Colleges.
EFFECTIVE DELEGATION AND SUPERVISION
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
CHAPTER 3 ~~~~~ INFORMAL ASSESSMENT: SELECTING, SCORING, REPORTING.
Writing an Effective Business Plan: Building a Roadmap to Success
ENVIRONMENTAL MANAGEMENT PLAN
3 Chapter Needs Assessment.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Chapter 3 Preparing and Evaluating a Research Plan Gay and Airasian
EMPLOYABILITY SKILLS Validated Self Assessment … how to do it ! Developed by Rob Denton.
Task analysis 1 © Copyright De Montfort University 1998 All Rights Reserved Task Analysis Preece et al Chapter 7.
Principles and Standards for School Mathematics National Council of Teachers of Mathematics.
Build a Thermometer Screen Design and Technology – Thermometer Screen Project Name___________ Date ___________.
ABET Accreditation Board for Engineering and Technology
Capstone Design Project (CDP) Civil Engineering Department First Semester 1431/1432 H 10/14/20091 King Saud University, Civil Engineering Department.
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
Quality Improvement Prepeared By Dr: Manal Moussa.
~ Science for Life not for Grades!. Why choose Cambridge IGCSE Co-ordinated Sciences ? IGCSE Co-ordinated Sciences gives you the opportunity to study.
Construction Specifications
Overview of the Department’s ABET Criterion 3 Assessment Process.
AE 321 Design Details (2) Prof.Dr. Tarek Saad Pharos University In Alexandria Faculty Of Engineering Architecture Department.
Professional Certificate – Managing Public Accounts Committees Ian “Ren” Rennie.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
The Construction Industry Sustainable Construction Heritage Construction Understand heritage timber work, stonemasonry and decorative finishes Work on.
Developing Indicators
Defining general and subject specific language competences for mainstream education The Norwegian Framework for Basic Skills Jorunn Berntzen, Strasbourg,
Unit 1 – Preparation for Assessment LO 1.1&1.2&1.3.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
The European Credit system The European Credit system for Vocational Education and Training (ECVET)
1 Competence modelling and learning outcomes Simon Grant University of Bolton, JISC CETIS Organic Autumn School, Mesta, Chios
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
PAD214 INTRODUCTION TO PUBLIC PERSONNEL ADMINISTRATION
Technical Report Writing Lecture 09. Technical Communication Is the process of transmitting facts and information to a defined audience for a specific.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Communicate at work.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Design Art I grade 10 The design process What is the design process? The design process consists of a list of steps that you have to follow when you encounter.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
N ational Q ualifications F ramework N Q F Quality Center National Accreditation Committee.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Graphical Detailing in Construction and the Built Environment
Business Project Nicos Rodosthenous PhD 08/10/2013 1
Generic competencesDescription of the Competence Learning Competence The student  possesses the capability to evaluate and develop one’s own competences.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
29 th May 2012 Waingels College. Aims To explain the role of literacy in PE Demonstrate and share ideas to support the impact of literacy in PE Recognise.
University of Utah Program Goals and Objectives Program Goals and Objectives Constituents U of U, COE, ASCE, IAB Constituents U of U, COE, ASCE, IAB Strategic.
Teaching Children About Food Safety Food Safety Professional Development for Early Childhood Educators.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
EFFECTIVE DELEGATION AND SUPERVISION
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
true potential An Introduction to the First Line Manager Programme’s CMI Qualifications.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Software Design Process. What is software? mid-1970s executable binary code ‘source code’ and the resulting binary code 1990s development of the Internet.
The Design Team Carl James.
3 Chapter Needs Assessment.
Introduction to New Product Development (Portfolio)
Temporary Works Co-ordination
CE 220 Professionalism A pupil from whom nothing is ever demanded which he cannot do, never does all he can. John Stuart Mill.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Presentation transcript:

BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering

Introduction Construction Technology and Design is a unit that represents the basic requirements of all construction professionals to work as a team and to articulate their ideas accurately and succinctly. The unit deals with the requirement to understand technical information and to produce clear and unambiguous materials that convey the designer’s wishes to constructors and other interested parties. In order to do this effectively, students must know the factors that influence the design process and the need to work with others to create a suitable design solution.

Introduction The unit explores the use of the Royal Institute of British Architects (RIBA) plan of work to plan effectively. The use of the plan is widespread but the implications for its use determine whether contractors and designers alike choose to use it, modify it, or to discard it, in favour of their own tailor-made solution. Detailed planning of construction projects is very important and students must have the ability to communicate ideas between various members of the design and production team. This in practice means using a variety of graphical and written documents to determine design strategy, and to inform members of the team of changes and modifications.

Introduction It naturally follows that in order to be able to communicate these changes or ideas effectively students must also be able to use relevant technical and architectural terminology to describe and specify aspects of construction technology and design. People working on construction sites typically communicate their ideas using detailed drawings and illustrations which in turn will require the ability to understand these construction details, their interface between various components and their relationship with other materials and component parts of the building. Knowing these components is not enough. There is need to translate them into written and graphical instructions that is necessary to progress from design into production.

Unit Specification Unit 5 Construction Technology and Design in Construction and Civil Engineering Unit Specification

Overview Aim and purpose The aim of this unit is to gain knowledge of construction methods and factors that influence design, and develop skills in communicating ideas between team members and in translating construction details into written and graphical instructions.

Overview Unit introduction In recent times we have built far bigger and far more complex buildings than before. For many years the UK has been among the market leaders in this field and UK construction workers are taking their knowledge and expertise all over the world. Modern developments in construction technology and materials have enabled us to create more efficient and complex structures. The ability to design, plan and communicate ideas effectively is essential if a project is to be translated from an idea into reality. Poor communication will lead to poor construction.

Overview Unit introduction This unit will develop an understanding of the design process and recognition of the contribution of other members of the design team. Planning and organising design activities is related to the decision-making process and the likely outcomes of decisions taken by the team within a legal framework should be considered in the wider social context, rather than as simple subjective preferences.

Overview Unit introduction This unit will consider the requirements of construction-related projects as they pass through various stages from design to construction, including the implications of changes and variations in the design. Learners will develop their ability to produce clear drawings of construction components, using both manual and CAD techniques, together with succinct and accurate explanations that specify for builders the exact characteristics of relevant construction details. Use of scale, proportion and appropriate description is expected of all successful learners. Learners will be able to use appropriate design and planning procedures to specify for and communicate to other team members involved in a construction project requirements for the technical components of buildings.

Learning Outcomes On completion of this unit a learner should: Know the factors that influence the design process Be able to communicate ideas between various members of the design and production teams Know about construction methods Be able to translate construction details into written and graphical instructions.

Assessment and Grading Criteria

Assessment and Grading Criteria

Assessment and Grading Criteria

Assessment Assignment 1: (P1, P2, P3, P4, P5, M1, M2, D1) Design Processes, Procedures and Communications Assignment 2: (P6, P7, P8, M3, D2) Construction Methods Interpretation of given drawings, details, schedules and specifications

BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering

Factors Influencing the Design Process Let’s think about what it means to design and construct a successful building… Construction technology and design needs careful thought, planning and the ability to overcome problems that arise in the building of complex structures. There are many things that will influence the outcome of the building and whether or not it will be a success.

Factors Influencing the Design Process The client’s brief Communication between the design team Choice/specification of materials Design compatibility Nature of the site Location Health & Safety Procurement method

Factors Influencing the Construction Process Adverse weather conditions Shortage of skilled labour Poor communications between design/ construction teams Poor workmanship Delays in completing construction work Strikes or industrial disputes Accidents on the construction site during works

Introductory Activity Influences on the design and building process Think about a structure such as a large industrial unit or a retail outlet suitable for a superstore. IN GROUPS Consider all the things that may have a negative influence on the design and the building process. Identify what negative influences could impact on whether the design and construction is successful. Write the examples that you identify in the NEGATIVE area on the sheet provided Now re-write some agreed influences on post-it notes Place your post-its in the negative area on screen

NEGATIVE

Introductivity Activity Influences on the design and building process IN GROUPS Consider the things that have been identified as having a negative influence on the design and the building process. Identify what can be done in order to improve the NEGATIVE to ensure that construction is successful and write your views into the UPPER area on the sheets provided. Write up your comments on more post-its and explain in detail to the class by moving the on screen post-its to the POSITIVE area.

POSITIVE - What can be done in order to move items from the NEGATIVE into the POSITIVE area?