Managing Quality & Risk Week 2 - 17 September 2015 - The Properties of Risk Management Module leader – Tim Rose.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Joanne Cunningham Trinity College Dublin
Pearson Education Ltd. Naki Kouyioumtzis
Failure Mode and Effect Analysis
Failure Effect Mode Analysis
Risk Identification Chapter 6.
Overview Lesson 10,11 - Software Quality Assurance
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 COMP201 Project Management.
Overview and Introduction
By: Ashwin Vignesh Madhu
Computer Security: Principles and Practice
Project Management Hoang Huu Hanh, Hue University hanh-at-hueuni.edu.vn.
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
Quality Risk Management ICH Q9 Annex I: Methods & Tools
ISO 9000 Certification ISO 9001 and ISO
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Risk Management
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 5 Slide 1 Chapter 5 Project Management Modified by Randy K. Smith.
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 19 Failure prevention.
Equity Housing Group Risk Management. 05 August 2002 © MazarsEquity Housing Group: Risk Management 2 Agenda Introduction: what is Risk Management? The.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
Mark Piekarz, Ian Jenkins and Peter Mills
Module 3. Session DCST Clinical governance
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
CAKE Q3 BARRIER MANAGEMENT. CAKE Q3: BARRIER MANAGEMENT A barrier can be a technical, operational or organizational element that either separately or.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
© 2009 On the CUSP: STOP BSI Identifying Hazards.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Risk & Opportunity Management Putting theory into Practice Susy Austin MQM Business Consultant.
Bank Audit. Internal Audit Internal audit is an independent, objective assurance activity and can give valuable insight in providing assurance that major.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
1 Risk Management 2 n IEEE defines risk as: “the likelihood of an event, hazard, threat or situation occurring and its undesirable consequences” [Std.
Software Engineering, 8th edition. Chapter 5 1 Courtesy: ©Ian Sommerville 2006 Oct 13 th, 2008 Lecture # 6 Project management.
The effect of peer feedback for blogging on college Advisor: Min-Puu Chen Presenter: Pei- Chi Lu Xie, Y., Ke, F., & Sharma, P. (2008). The effect of feedback.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Copyright 2013 John Wiley & Sons, Inc. Chapter 3 Monitoring and Controlling the Transformation System.
1 Chapter 13 Managing and Improving Quality. 2 Quality Management  Total Quality Management (TQM)  Customer/client focus  Total organizational involvement.
Tax Administration Diagnostic Assessment Tool
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
Total Productive Maintenance Dr Neil Towers Fashion Operations Management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Project management 1/30/2016ICS 413 – Software Engineering1.
CHAPTER 23 Managing the Project. Managing the research project A project is: ‘ A set of activities which has a defined start point and a defined end state,
TOTAL PRODUCTIVE MAINTENANCE
Failure Modes and Effects Analysis (FMEA)
Quality Improvement Tools for Intervention Determination Presenters: Kris Hartmann, MS Healthcare Analyst, Performance Improvement Projects Don Grostic,
Managing Quality & Risk Week 6 – 15 October Quality Monitoring and Controlling Processes Module leader – Tim Rose.
Contemporary Business Issues Layers of Business Strategy Module Tutor: Nigel Bryant Session 3 28th January 2016.
Managing Quality & Risk Week September The Properties of Quality Management Module leader – Tim Rose.
Contemporary Business Issues Change Management Theory Module Tutor: Nigel Bryant Session th February 2016.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4: Project management l Organising, planning and scheduling software.
Managing Quality & Risk Week September Introduction to Module & Topic Module leader – Tim Rose.
Managing Quality & Risk Week 8 – 12 November Risk Management Systems [2] Module leader – Tim Rose.
Managing Quality & Risk Week 4 – 01 October Risk and Failure Module leader – Tim Rose.
References: Supply Chain Saves the World. Boston, MA: AMR Research (2006); Designing and Managing the Supply Chain – Concepts, Strategies and Case Studies;
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
1 Project management Organising, planning and scheduling software projects.
Managing Quality & Risk Week 5 – 08 October Risk and People Module leader – Tim Rose.
FMEA PROCESS FLOW Causes/ failure mechanisms Product definition
FMEA PROCESS FLOW Determine Causes/ mechanisms failure
Project Risk Management
Failure Mode and Effect Analysis
Risk Assessment PMO Briefing 31st January 2018.
Chapter 14 Risk and resilience.
Presentation transcript:

Managing Quality & Risk Week September The Properties of Risk Management Module leader – Tim Rose

Risky business…?

Module route map Semester 1Date (W/c)Content Week 107/09/2015Introduction to Module & Topic Week 214/09/2015The Properties of Risk Management Week 321/09/2015The Properties of Quality Management Week 428/10/2015Risk and Failure Week 505/10/2015Risk and People Week 612/10/2015Quality Monitoring and Controlling Processes 19/10/2015College closed for staff development 26/10/2014Reading week Week 702/11/2015Risk Management Systems [1] Week 809/11/2015Risk Management Systems [2] Week 916/11/2015Independent research Week 1023/11/2015Peer review Week 1130/11/20151:1 Tutorials Week 1207/12/2015Assignment workshop/ revision N/a11/01/2016Exam

Intended learning outcomes By the end this session you will:  Discuss the nature of identifying and assessing risk  List basic risk elements  Discuss scope and impact of risk  Explore risk management techniques (in relation to FAILURE).

Identifying and Assessing RISK - Activity  Split into three groups  Using one of the following techniques to identify and risk in an area of/ an organisation of your choice: 1. Risk Register (AKA Risk Assessment) 2. PESTLE 3. SWOT  Present your findings to the group  Evaluate the effectiveness of each approach.

Risk Elements - Group discussion  According to Sadgrove (2015), there are six types of Business Risk that require management –  Strategic  Operational  People  Technology  Financial  Compliance [Sadgrove, p.26 (2015), The Complete Guide to Business Risk Management]  In groups, consider the scope [i.e. sub-elements] and potential impact of each of these risk factors.

FAILURE

Mechanisms to detect failure  In-process checks  Machine diagnostic checks  Point of departure interviews  Phone surveys  Focus groups  Complaint/feedback.

Failure analysis  Accident investigation  Large scale national disasters  Failure traceability  Traced back to source  Complaint analysis  Timely, perception by the customer  Critical incident analysis  Gathering customer’s facts (positive & negative).

The three tasks of failure prevention & recovery Failure detection & analysis Finding out what is going wrong and why Improving system reliability Stopping things going wrong Recovery Coping when things do go wrong [Slack, et al (2007)]

FMEA – Failure Mode and Effect Analysis  Checklist to identify failures before they happen  3 key questions: 1. What is the likelihood that failure will occur? 2. What would the consequence of the failure be? 3. How likely is such a failure to be detected before it affects the customer?.

Learning outcomes from this session Throughout this session you have: Discussed the nature of identifying and assessing risk Listed basic risk elements Discussed scope and impact of risk Explored risk management techniques.

Out of class activity  Consider ‘failure’ in your organisation – what does it mean? On what level is this applicable to your role? Which failure management tool might best suit your audit task?  Suggested reading: Sadgrove, K (2015) The Complete Guide to Business Risk Management  Chapter 2: How to identify and Assess Risk  Explore