ASTM Committee F06 F2170 In-situ RH Test Depth Study on Metal Decking (Round II) F2170 Probe Insertion Study Study Location: American Engineering Testing.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Chapter 24 ECONOMIC AND PRODUCT DESIGN CONSIDERATIONS IN MACHINING
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
Lecture #13 Properties of Hardening Concrete Curing.
Modeling Geologic Columns With Sand Art By Debra Rockey Wellsburg Middle School 1.Prepare the plastic tube. One end should be permanently sealed. If necessary,
A VISUAL AID TO PYROMETRY COMPLIANCE (A Guide To An Acceptable TUS Report) February 2010.
CONDOMS A series of presentations developed by TGPSH/GTZ and PSI-TANZANIA.
NOISE EXPOSURE SURVEY NOISE EXPOSURE SURVEY. Either the Mine Operator Or MSHA Can conduct a noise exposure survey on You. This presentation describes.
Engine Tune-Up Chapter 47.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
B Persson, LTH Building Materials, University of Lund, Lund, Sweden ON THE TEMPERATURE EFFECT ON SELF-DESICCATION OF CONCRETE Experimental setup: l 250.
1- Pipsqueak Engine Millwork on uprights and base.
Meteorological Measurement Error Analysis based on ANSI/ANS-3.11 (2005) Kenneth G. Wastrack Tennessee Valley Authority NUMUG 2005.
Selection of measuring instruments
Operational Quality Control in Helsinki Testbed Mesoscale Atmospheric Network Workshop University of Helsinki, 13 February 2007 Hannu Lahtela & Heikki.
Body Composition Assessment (BCA)
Calibration (Qualification) of Centrifuge
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
1 Class #26 Civil Engineering Materials – CIVE 2110 Concrete Material Concrete Compressive Strength, f’ c Cracking Aging, Maturity Fall 2010 Dr. Gupta.
By Narain Hariharan Aishwarya Baranikumar
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
V. Rouillard  Introduction to measurement and statistical analysis ASSESSING EXPERIMENTAL DATA : ERRORS Remember: no measurement is perfect – errors.
ASTM Ball Task Force Update SGMA Annual Meeting Dallas, Texas, October 2, 2003 Lloyd Smith, Washington State University.
WELCOME TO Gas Tester Training O2, LEL Monitoring
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
DAQ Systems and Instruments for Hx Performance Testing and Periodic Monitoring.
Arsine Detection using Chemcassette ® Technology.
OSHA Regulation 29 CFR , Occupational Noise Exposure Hearing Conservation 1.
Measuring Techniques. Unit 4-2. Measuring Techniques The measurement of part and product size is important in technological design and production activities.
SUMMARY FROM ACI 224.1R-93. When anticipating repair of cracks in concrete, it is important to first identify the location and extent of cracking. The.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
ENGINEERING NOTES KID WIND By: Luis.C Miguel.M. Materials List  Screws……………….. ( base attachment )… …..#26  Nails………………….. ( Base attachment ) #10.
Estimation of the heat evolution during the hydration of concrete, mix design of hot concrete, drying and coating of concrete structures Exercise 6.
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
L Berkley Davis Copyright 2009 MER301: Engineering Reliability Lecture 9 1 MER301:Engineering Reliability LECTURE 9: Chapter 4: Decision Making for a Single.
VVSG: Usability, Accessibility, Privacy 1 VVSG, Part 1, Chapter 3 Usability, Accessibility, and Privacy December 6, 2007 Dr. Sharon Laskowski
Evaluation of the WVSS-II Sensor Using Co-located In-situ and Remotely Sensed Observations Sarah Bedka, Ralph Petersen, Wayne Feltz, and Erik Olson CIMSS.
Measurement Equipment
Manual Density Business Today
Theory of Errors in Observations Chapter 3 (continued)
Harry’s Queue Patterns Chris Meyer: Joe Stinolis: Mark Burchnall
Plate No. 5. Make the Border line and Title Block – (5 Minutes ONLY) Divide the workspace and find the reference point – (5 Minutes ONLY) Draw the Isometric.
May 2002[NUMUG] Listening to the Wind1 of 17 LISTENING TO THE WIND TVA Experience with Installation and Operation of Ultrasonic Wind Sensors Kenneth G.
Soumen Kar 1,2, Xiao-Fen Li 1, Venkat Selvamanickam 1, V. V. Rao 2 1 Department of Mechanical Engineering and Texas Center for Superconductivity University.
? Training removes doubt, instills confidence, and lays the foundation for everyone’s skill and experience level.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
2016/6/11 1 Moisture Adjustment. 1. Objectives 2. Collection and Preconditioning of Grain Reference Samples 3. Arrangement of Moisture Content 4. Homogenization.
Calibration of a Thermistor Voltage Divider Portland State University Department of Mechanical Engineering ME 121: Engineering Problem Solving.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
National Institute Of Standards and Technology Technology Administration, U.S. Department of Commerce Power Loading Effects in Precision 1  Resistors.
Date - 01/02/2003 San Juan Coal Company Thermal Coal Customer Sector Group 1 #BHP Roof Control Jeopardy.
3rd INFORMAL WORKING GROUP MEETING 2015 – 2016 Lithium Batteries and UN Manual of Tests and Criteria March 30 – April 1, 2016 Bordeaux, France Agenda.
Last results from tests
TEMPERATURE DISTRIBUTION ACROSS THE EXTENDED SURFACE
Gas Analysis for the Recreational and Technical Diver
Structural drawing.
Business Development Manager
Cutting Speed, Feed, and Depth of Cut
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
MACH 112: Cutting Tools & Measurement
CHAPTER 6 Tools and Equipment.
MEASUREMENT AND INSPECTION
Conducting Preliminary Noise Assessments in the Workplace
Roof Control Jeopardy.
Chapter 1 Introduction.
Stream Crossing Bootcamp
Presentation transcript:

ASTM Committee F06 F2170 In-situ RH Test Depth Study on Metal Decking (Round II) F2170 Probe Insertion Study Study Location: American Engineering Testing – St. Paul, MN Test Date & Time: TBA Version May 3, 2016

F2170 In-situ RH Test Depth Study on Metal Decking Currently when testing the internal relative humidity (RH) of a concrete slab on corrugated (fluted) metal decking, tests are taken at 40% of the deepest section of the slab. Without the use of specialized depth sensing equipment it is challenge for most who perform in-situ relative humidity tests in slabs on metal decking to ensure that the tests are being performed in the deepest portion of the concrete. A formula for establishing an average test depth is being proposed for inclusion in the F2170 test method such that it would no longer be necessary to ensure that tests were conducted in the deepest portion of a slab on metal deck. The following test program is intended to help determine if the proposed formula can be validated. Objective:

F2170 In-situ RH Test Depth Study on Metal Decking Photos of new test panel: New Slab Formwork Normal Weight Concrete Placed February 24, 2016

New Test Slab: 1.5” 12” 12” 12” 1.5” 36 ” 3” 3.25” 6.25” Crete Claw Exposed width 32 -3/4” Exposed length 7’-4” Formwork 2 x 8 cut to 6.25” ¾” plywood Vulcraft VLI 3” Decking Slab: Normal Weight w/c /4” Aluminum tape

Test Setup: 1.5” 12” 12” 12” 1.5” 36 ” 6.25” 3” Proposed Average Depth Formula: Depth of thinnest section (3.25”) + ½ depth of flute (3.0”) x 40% = 3.25” ½ of 3.0” = 1.5” ” = 4.75” X 40% = 1.9” 40% of 6.25” = 2.5” Formula tests : 1.9” ( Not to scale ) 2.5” Aluminum tape Test RH Level c: 85%

F2170 Probe Insertion Study Currently the F2170 test method permits one to insert the probe immediately following insertion of the hole liner into the drilled hole, or to wait the specified equilibrium period, insert the probe and record the measurement when the drift does not exceed 1% in 5 minutes. Observations made by a number of experienced testing technicians, and several equipment manufacturers suggest that RH measurements are consistently higher when the probe is inserted immediately after the liner is installed, and left in for the entire test period as compared to inserting the probe into the liner at the end of the required exposure period and recording a measurement after 1 or 2 hours. Objective:

F2170 Probe Insertion Study 1. Calibration accuracy (deviation of sensors against a high precision reference) 2. Hysteresis ( Sensor memory) 3. Long term drift ( Affect of sensor age on sensor drift) 4. Creep ( Drift of RH measurement upward in higher RH environments) Factors that affect RH sensor measurements

F2170 Probe Insertion Study A B C D E F A & B: New probes installed immediately and left in entire time. Measurements recorded at 24, 48 and 72 hours. C: Dummy plugs installed after holes are drilled and lined. Probe from A removed and allowed to stabilize with ambient RH. Probe from A installed after liner has been in 24, 48 and 72 hours. Dummy plug removed, probe inserted and RH measurements taken at 1,2,3 & 4 hours after insertion of probe. D: Dummy plugs installed after holes are drilled and lined. New probe installed after liner has been in 24, 48 and 72 hours. Dummy plug removed, probe inserted and RH measurements taken at 1,2,3 & 4 hours after insertion of probe. E: Probe from B is removed and allowed to stabilize with ambient RH. Probe installed into hole liner E which did not have a dummy plug and has been in place 24, 48 and 72 hours. RH measurements taken at 1,2,3 & 4 hours after insertion of the probe. F: New Probe installed into hole liner F which did not have a dummy plug and has been in place 24, 48 and 72 hours. RH measurements taken at 1,2,3 & 4 & hours after insertion of the probe. Probe Probe BNew probe New Probe Three sets of each condition 3A, 3B, 3C, 3D, 3E & 3F

F2170 Probe Insertion Study 72 hrs 48 hrs 24 hrs A B C D E F Hole liners with dummy plugs Capped, open hole liners New probes 12 New Probes & 18 Hole Liners

END