7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 1 Pilot Run - Status and Plans PXD9-6 Rainer Richter for the MPG Halbleiterlabor.

Slides:



Advertisements
Similar presentations
2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Advertisements

SOFI R EVIEW M EETING - C ONFIDENTIAL 1 CONFIDENTIAL SOFI : WP3 - Silicon Chips SOFI meeting – 20 January Rome.
CALICE meeting, Montreal, 10 th May 2006Václav Vrba, Institute of Physics, AS CR ECAL Si sensors status and plans May 2006 V.Vrba.
R. H. Richter et al - VERTEX 2002 Kailua-Kona, DEPFET sensors for a LC vertex detector (1) »DEP(leted)F(ield)E(ffect)T(ransistor) operation.
EE143 –Ali JaveySlide 10-1 Section 10: Layout. EE143 –Ali Javey Layout Design Rules (1) Absolute-Value Design Rules * Use absolute distances (2) -based.
1 Compilation. 2 Laser Anneal Verification Test Batch 1 Wafer 14 Dices 3 and 5 14-Oct-2010 to 15-Oct-2010.
Project Title Name : University: Guide :. Introduction Project – what is new / what are you analyzing from this work – Example: Solar cell – increase.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
7 th and 8 th Grade Math Stetson Hills School Miss Gilbert Welcome Back!
Lesson 4 Objective: Use multiplication to calculate volume
EE141 © Digital Integrated Circuits 2nd Manufacturing 1 Manufacturing Process I Dr. Shiyan Hu Office: EERC 518 Adapted and modified from Digital Integrated.
Status and outlook of the Medipix3 TSV project
1 States report for readout system 1.PHENIX readout system overview 2.High speed data link 3.Digital pilot ASIC 4.Schedule Hiroyuki
Weekly Group Meeting Report Renjie Chen Supervisor: Prof. Shadi A. Dayeh.
G. Parès – A. Berthelot CEA-Leti-Minatec GU project status.
Metallization: Contact to devices, interconnections between devices and to external Signal (V or I) intensity and speed (frequency response, delay)
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
MPI Stuttgart Max-Planck-Institut fuer Festkoerperforschung Stuttgart, Germany R. Sordan, K. Balasubramanian, M. Burghard WP2(A): Single fullerene transistor.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
LPICM slides for WP3 Wanghua Chen and Pere Roca i Cabarrocas
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Fab - Step 1 Take SOI Wafer Top view Side view Si substrate SiO2 – 2 um Si confidential.
Side ViewTop View Beginning from a silicon wafer.
DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor Lessons learned from EMCMs assembly status - next steps.
Thinning and Interconnection DEPFET Meeting, Valencia, Sept Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples for thermal mock-ups.
H.-G. Moser, MPP project review, December 17, 2012 Belle & Belle II 1 Belle: ongoing analyses, papers Belle II: accelerator upgrade status Belle II detector.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
VXD Workshop, Valencia, Jan Ladislav Andricek, MPG Halbleiterlabor 1 pilot module assembly - lessons learned -
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Jelena Ninković Testing PXD6 - summary and plans Jelena Ninkovic for the HLL team.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
ELECTRICAL MULTI-CHIP MODULE testing status 3 rd Belle II PXD/SVD Workshop and 12 th International Workshop on DEPFET Detectors and Applications Wetzlar,
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
PXD ASIC Review, July 2015 Ladislav Andricek, MPG Halbleiterlabor Belle II PXD ASIC Review, the 2 nd …….. 1.
SOI for Belle II PXD DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples for thermal mock-ups 
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
Yield measurements on PXD9-7 after 2nd metal Paola Avella, Daniel Klose, Christian Koffmane, Jelena Ninković, Rainer H. Richter for the MPP/HLL team.
B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.
DEPFET Workshop, May 2016 Ladislav Andricek, MPG Halbleiterlabor 1 o Documentation o Transition to “Production Mode” o Please update docu and place it.
Switcher (SWB) bumping
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Testing PXD6 - testing plans
New Mask and vendor for 3D detectors
Pilot run – matrix measurements after first metal
Thinning and Plans for SuperBelle
Schedule So far: academic exercise to check if all makes sense
The CSOI approach for integrated micro channels
Manufacturing Process I
Ladder Assembly All tools and jigs produced Glue dispensing works
The SOI Issue – Material for PXD9
1) Wafer Cleaning Oxidizing – Field Oxide
CMOS Process Flow.
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
LHCb electronics, 12th June 2014
Report from CNM activities
SCUBA-2 Detector Technology Development
FACTORY LOT STATUS - MESA
31/08/ GaAs and 5629 GaAs growth 5622 GaAs,
Lecture #25 OUTLINE Device isolation methods Electrical contacts to Si
Manufacturing Process I
Manufacturing Process I
Presentation transcript:

7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 1 Pilot Run - Status and Plans PXD9-6 Rainer Richter for the MPG Halbleiterlabor

7th PXD/SVD Workshop, Prague, January 2015Rainer Richter, MPG Halbleiterlabor 2 Pilot run wafers Batc h WTypeContacts Testing status I24dummyto poly, poxn, noxnongoing I25dummyto poly, poxn, noxnongoing I26dummyto poly, poxn, noxnongoing I27dummyto poly, poxn, noxnongoing II23dummyallfrom II30hotallfrom II35hotallfrom II36hotallfrom

7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 3 - first metal (al1n) Al deposition, lithography, etching done first electrical measurements (talks by Paola and me) - metal1 metal2 vias (co2n) lithography and etchingdone - second metal (al2n) Al deposition (all wafers)done lithography and etching (dummies) done lithography and etching (project wafers)done (still in inspection) -Break for intense measurements can start next week PXD9-6 production status

Module label 7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 4 Containing: Wafer number and module type -> unique labels 150µm height -> magnifying glass

7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 5 PXD9-6 production (pilot run) is running smoothly and in time 1 week ahead of schedule first electrical measurements (after metal 1) look promising (see next talks) Now: metal 2 is finished Top side of the DEPFET matrix is ‚ready‘ (does not need copper) Intense measurements are planned in the next 2-3 weeks Summary

PXD9 Pilot production (iii) 7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 6 Cons - Risk to loose of 2 or 3 (2nd grade) PXD9 wafers if we finally find still a severe bug on EMCM modules - No time to wait with the remaining wafer on the results of fully equipped and tested modules But we could wait with the first batch for the intermediate tests of metal1/metal2 And we could stop before Copper in order to be able to react in the third metal layer on unforeseen results (e.g. Gated Mode)