Lower Allegheny River Stakeholders Meeting June 15, 2006.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
Mark Williams Facilities Engineering Manger Mike Joyner Project Manager - Power Services.
Dam Safety Act for Alabama. Baldwin Hills Dam Disaster
Waterway O&M Issues RRVA Briefing to Mississippi River Commission 13 April 2011.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on Engineering Risk Assessments (ERA) for USACE Civil Works.
Port of Pittsburgh Commission James R. McCarville Met Coke Conference – Pittsburgh November 2, 2010 Welcome to the Port of Pittsburgh.
Washington Port Issues Washington State Freight Advisory Committee Seattle, WA December 9, 2013.
Tailing Dams – A Consultants Perspective
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Coop Training : Central Heavy Equipment Department In Aramco King Fahd.
When a Water Main Breaks Presentation to: AWWU Board of Directors November 5, 2014.
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
1 Low-Income Housing Tax Credit Legislative Update Robert Rozen Washington Council Ernst & Young June 2011.
ANRC AACD Arkansas Conservation Districts Training Program Power Point 12 Arkansas Natural Resources Commission.
AIR COMPRESSORS & STEAM CLEANERS. Pressurized air is produced by an air compressor. Air compressors are used daily in automotive shops. They are used.
The In's and Out's of Locking Through a Dam By RiverBill.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
Griner Drilling Service
Pacific Northwest Waterways Association 2008 MID-YEAR MEETING Inland Project Report: Little Goose, Lower Monumental, the PSMP and the Five Year Funding.
Watershed Dams Maintenance Renovation/Rehabilitation.
1 State of Good Repair Research Vincent Valdes Associate Administrator for Research, Demonstration, and Innovation July 9, 2009.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
USACE Civil Works Program Development, Defense & Execution Gary Loew, Chief, Programs Integration Division Directorate of Civil Works U.S. Army Corps of.
BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
ORSANCO Technical Committee Erich Emery USACE Great Lakes & Ohio River Division 11-Oct US Army Corps of Engineers BUILDING STRONG ®
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Dam Safety Case History Columbia Lock and Dam March 8, 1997 “A number of courageous people worked in sometimes dangerous circumstance to perform their.
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
USACE Northwestern Division Leadership
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
IRRIGATION AKA ECONOMIC DEVELOPMENT.  Double the value of agriculture by  Add 500,000 acres of irrigation.  Assist local producer in efforts.
U.S. Army Corps of Engineers Why Asset Management? “Short list” 1000 Coastal Structures 600 Dams 2500 Recreational Areas 250 Locks 75 Hydropower
3.00 Understand employment, agency, environmental, energy, and intellectual property law environmental and energy law.
One Team: Relevant, Ready, Responsive, Reliable 1 Hannibal L/D Ohio River - Quoin Block Failure 110-ft x 1200-ft Main Lock Sep & Nov 2005 Pittsburgh District.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
US Army Corps of Engineers Great Lakes & Ohio River Division US Army Corps of Engineers Great Lakes & Ohio River Division Achieving Navigation Systems.
Budget Informational Meeting Great Falls Council of Councils Meeting May 27, 2014.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
ROTARY/KIWANIS/LIONS CLUBS CAMDEN, AR AUGUST 13, 2013 Mike Dumas President Ouachita River Valley Association.
Public Works 1 FY 2013 Sources and Uses. Public Works 2 FY 2013 Sources and Uses.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
1 Coal Handling & Storage Conference 2015 Paul Rohde, Vice President Waterways Council, Inc.
Solving Significant Surge and Water Hammer in a Large Wastewater Lift Station at Fort Bragg, North Carolina November 16, 2015 Randall L. Foulke, PE, BCEE,
1 Smart Rivers Conference September 15, 2011 New Orleans, Louisiana “Status of Inland Waterways Infrastructure Funding”
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
Inland Navigation - A National Perspective Jim Walker USACE, Headquarters November 8, 2007.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Inland Waterways Challenges 1. Campbell Transportation Company, Inc. and C & C Marine Maintenance Company.
“If you think we’ve got problems now... and …what can we do about it” Transportation Day-Pittsburgh May 17, 2007 James R. McCarville Port of Pittsburgh.
Port of Pittsburgh Commission James R. McCarville Met Coke Conference – Pittsburgh November 2, 2010 Welcome to the Port of Pittsburgh.
AVTC Model Based Design Curriculum Development Project.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
WATER SYSTEM WORKSHOP February 27, 2012
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
1 Presented to the City Council by Horatio Porter, Budget Officer September 15, 2009 Overview of FY2010 Budget.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
Novomet. BOOSTER PUMPING SYSTEM.
Small Sites Planning & Scheduling
Infrastructure, Innovation and Standardization
USACE Standardization of Navigation Infrastructure
Illinois Waterway 2020 Consolidated Closure
ACEC Environmental Business &
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Presentation transcript:

Lower Allegheny River Stakeholders Meeting June 15, 2006

Resource Personnel Port of Pittsburgh Commission –James R. McCarville, Executive Director –Mary Ann Bucci, Marketing Director Waterways Association of Pittsburgh –Mark Devinney, Freeport Terminals and Nicholas Enterprises, Inc. USACE –Col. Steve Hill, District Engineer –Rich Lockwood, Director of Operations

Success of Other PPC Stakeholder Efforts PPC stakeholders’ group for the Monongahela and Ohio Rivers (new construction) In the FY07 President’s budget and the House Appropriation bill, there is: –$62.3M for the Lower Mon Improvement Program (New Construction) –$17M for Emsworth Dam (Emergency Repairs) The House has added $1.3M for EDM study Coordination with Waterways Council, Inc

Historical Problem Statement USACE’s O&M funding history for Locks and Dams over past 30 years –Aging infrastructure requires more M, but –Personnel costs have inflated, and O&M funding has been flat USACE rationed O&M funds to high use rivers (tons, ton-miles on river) Allegheny River has had little or no M over the past 10 years.

Recent Events USACE-LRP has taken a serious reduction in force USACE-LRP and LRD have demonstrated leadership in promoting the need to consider “risk and reliability” factors in allocating maintenance funds

FY08 Guidelines USACE is expanding the criteria to: –“Must-have” basic service maintenance –Tons, ton-mile and average cost/ton-mile –Refuge, safety and security –Research and Development –Risk and Reliability –Consequences (if maintenance is not done) THIS IS THE AREA THE STAKEHOLDERS CAN HAVE THE GREATEST IMPACT

Next Steps After reviewing the condition of Allegheny Lock 2, CW Bill Young and Lock 4 Document what would be the consequences if any of these locks were out for an extended period of time Determine if this group wants to be active in seeking additional funding for the maintenance of the Lower Allegheny

LOCK 2 - Allegheny River Condition of concrete on the vertical face of the lock chamber showing missing corner armor and exposed rebar.

Condition of concrete under the grating on the lower land wall valve pit. LOCK 2 - Allegheny River

Wear in the gears of the tow haulage equipment. LOCK 2 - Allegheny River

Wear in the gears of the tow haulage equipment. LOCK 2 - Allegheny River

Three pipe clamps to stop one hole in the deteriorated oil lines. LOCK 2 - Allegheny River

Bent strut on the lower land wall draining valve alters a proper seal of the valve. LOCK 2 - Allegheny River

CW Bill Young Lock - Allegheny River This is a picture taken from the river wall pipe gallery of a monolith joint showing a hole through the wall into the lower draining valve pit.The ladder in the picture is the ladder inside the valve pit.

This is water leaking from the valve pit into the pipe gallery while on high pool. CW Bill Young Lock - Allegheny River

Condition of the concrete at the upper river wall gate machinery pit. CW Bill Young Lock - Allegheny River

Condition of oil line in pipe gallery with a pipe clamp placed over a leak. CW Bill Young Lock - Allegheny River

Oil leaking into the river at the tail race area.

CW Bill Young Lock - Allegheny River Deteriorated oil lines in pipe gallery.

CW Bill Young Lock - Allegheny River Water leaching over electric lines and oil pipe in pipe gallery.

LOCK 4 - Allegheny River Maintenance issues at Lock 4 include: 1)Presently the valve interlocks are out of operation. This is due to number one filling valve of operation. We actually have 2 filling valves out of operation. The bushings on the valves are wearing, the blades are dropping and causing the blades to rub or bind on the valve liners. This causes the motors to burn up. Need the repair party for this repair. This could continue to occur with more of the valves as time goes on. 2) We started experiencing problems with the variable frequency drive units (VFDs) which control the speed of the lock gates. Apparently the life expectancy of the VFDs are coming to an end (approx. 12 years) and are in need of being overhauled. It is a matter of sending them out and reinstalling them. It does not take us out of operation but eliminates our control over the speed of the gates.