CEC COMPUTER TECHNICAL FEASIBILITY, COST EFFECTIVENESS, AND SCHEDULE IMPACT ROBERT WHITE, DELL APRIL 26, 2016.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

Atlas Copco Group Q4 Results February 2, Q4 - highlights  Order growth continued  Record operating profit –All business areas above 20% operating.
Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
Mammography Industry: Review of Proposed Accessibility Standards U.S. Access Board May 8, 2012 Atlanta, Georgia.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
Chapter 23: Competitive Markets Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 13e.
Multi-scale Planning and Scheduling Under Uncertain and Varying Demand Conditions in the Pharmaceutical Industry Hierarchically Structured Integrated Multi-scale.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Session Objectives Examine the Financing challenges in road construction. Session outcome: By the end of the session trainees should be able; To identify.
80 years of excellence Commercial Buildings Tax Deduction Ed Gray Director, Energy Infrastructure National Electrical Manufacturers Association.
Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Enabling High Efficiency Power Supplies for Servers : Update on industry, government and utility initiatives Brian Griffith System Power Architect Intel.
HEPiX 21/05/2014 Olof Bärring, Marco Guerri – CERN IT
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Page 1 January 2002 doc.: IEEE 802.RR-02/018A-d5 IEEE 802 IEEE 802 proposal relating to DFS and JPT5G proposal.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
Pressure and Speed Limits
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
International Civil Aviation Organization Colloquium on Environmental Aspects of Aviation Aircraft Noise - The Way Forward Willard Dodds, Chairman ICCAIA.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Appliance Measure Updates Danielle Gidding Bonneville Power Administration.
Chapter 6 Control Using Wireless Throttling Valves.
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Fourth CTC Reset Compliance Filing Fall 2009 Customer Meetings.
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
Location planning and analysis
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Rigid Plastic Packaging Container (RPPC) Informational Update Permitting and Compliance Committee Meeting February 17, 2009.
FORS 8450 Advanced Forest Planning Lecture 11 Tabu Search.
California Environmental Protection Agency AIR RESOURCES BOARD Public Transit Bus Fleet Rule and Emission Standards for New Urban Buses California Air.
PAT Market Information for Food Security Analysis Session 1.3 WFP Markets Learning Programme Price Analysis Training.
1 Comments on the Ste 3 gearshift calculation tool from validation 2 participants Heinz Steven WLTP WLTP-DHC
A Tire Industry Perspective on Tire Rolling Resistance Tracey Norberg Rubber Manufacturers Association Presentation to the California Energy Commission.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
1 Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Diploma in Procurement & Supply Business needs in Procurement & Supply Session 1 Business Needs and Procurement Decisions.
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
EEC3 – The Way Forward Presentation to NIA Annual Conference 12 December 2006 By Iris Rooney, Defra.
Inventory Management The goal of effective inventory management is to “meet or exceed your customers’ expectations of product availability with the amount.
Lalit Panda, SVP SC and IT, Harman Consumer Group, Inc. ProcureCon July 14 th 2008 KPI Based Supply Chain Management.
Summary of Previous Lecture In our lecture about Cash and Marketable Securities Management we studied the following topics. Key variables that should be.
California Energy Commission Staff Workshop: Computers, Computer Monitors, and Signage Displays PCs – Framework/Methodology Stephen Eastman Shahid Sheikh.
SCOPE AND DEFINITION RESPONSE. Product Scope and Category Definitions CEC requested key stakeholders to develop computer categories Joint effort with.
Insights into Google's PUE Results Spring Published Google PUE Results.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
Businesses and the Costs of Production Theory of the Firm I.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
Manufacturing Processes
Enabling High Efficient Power Supplies for Servers
Integrated Resource Plan 2016
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 3 Supply Chain Drivers and Obstacles
Affordable Energy Production from Renewable Fuel
Graduation Project (II): Operations Improvement at Mhanna Factory
Economic Operation of Power Systems
Chapter 3 Supply Chain Drivers and Obstacles
Lower Makefield Township Community Meeting
Chapter5: CPU Scheduling
Stevenson 5 Capacity Planning.
Chapter 3 Supply Chain Drivers and Obstacles
US Industry Segments (Fluorocarbons)
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

CEC COMPUTER TECHNICAL FEASIBILITY, COST EFFECTIVENESS, AND SCHEDULE IMPACT ROBERT WHITE, DELL APRIL 26, 2016

TEC improvement potential & shipment impact Technical feasibility Cost effectiveness (BOM plus other costs) Schedule impact 2

Desktops - Technical Feasibility Product development cycles do not allow enough time to redesign product to meet a January 1, 2018 effective date. A 24 month grace period between publication of the final rule aligns with a January 1, 2019 effective date The proposed single category of 50 kWh TEC limit is too stringent and is 19 kWh lower than Category 0 (entry level) in ENERGY STAR 6.1 framework that provides 6 categories for DT’s ITI has collected power data for 170 currently shipping platforms, the 50 kWh limit only allows ~10% pass rate, most of those platforms utilize notebook parts and provide limited expandability 3

Margin to CEC Limit – Desktop – All systems CEC D2 Limit – Measured TEC = TEC Margin Value Positive Margin Passes CEC Limit, Negative Fails Majority of systems have a margin of -25 to -100 Most systems are 50% to 200% over the limit PASSING SYSTEMS FAILING SYSTEMS 4

5 Industry Estimates - $11 $255 $16 ??? - $150 $60 Platinum - $1 - $5 $24 - $10 Mobile ?? Industry Estimates $0 $16 $10 $24 $60 $110 CEC BOM cost estimates -Key Issues: Issue 1: We are far apart on pricing. CEC & Industry must agree on projected cost impacts Issue 2: Industry requires multiple vendors for each component, manufacturing variability requires designs to be more efficient than specified limits which increases costs CEC Cost Effectiveness 300W vs. 350W PSU??? Cost effectiveness remains the biggest gap (CEC vs. Industry Estimates)

Preamble Highlighting 4 slides industry previously presented related to cost and schedule Want to understand why industry input wasn’t considered? 6

System & Chipset Costs As previously stated in TN# Related to Costs and schedule impacts Lack of categories or appropriate adders will leave mobile parts as only option to meet limit – Between $40.00 and $ per unit to change Based on i5 / i3 processor and chipset prices currently on Intel.com website Minimum price Average Price and Maximum price of available listed processor and chipsets are compared 7

Hard Drives Capabilities As previously stated in TN# related to Hard Drive Idle Power Summary Although we have discussed Idle and Standby drive states, it is not possible to achieve platform standby state power levels with the drive in “Idle” state (as defined in drive spec sheets) – HDD idle states in spec sheets have platter spun down. This is not possible for main disk in idle test methods without developing new/changed operating systems. Main Takeaway 2.5” drives will be able to meet a 1W idle power goal 3.5” drives will not be able to meet a 1W idle power goal – Motor technology is very mature such that further power reductions are unlikely – Larger disk mass, higher motor bearing friction and windage contribute to higher motor power at idle when compared to 2.5” drives – None of the power reduction enablers discussed previously will allow us to reach the 1 W power goal 8

$ of changing to 2.5in HDD in a Desktop Cost neutral only applies to limited range of capacities 2.5in systems do have lower performance in some applications 3.5in Efficient drives still have size and performance tradeoffs Customers needing large Capacity will experience between $50.00 and per unit cost increase or have to add drives after initial purchase As previously stated in TN# related to 2.5” vs 3.5” Hard Drive Costs 9

Power Supply Design Schedules Insufficient number of existing PSU's to support all platforms being shipped into California. Demand of these PSU’s would exceed supply. As previously stated in TN# Related to Power Supply Redesign Schedules Short Term 12-­‐24 mo. – Use existing PSU’s on the market selecting good low load eff., (will not provide enough margin) – Transition to single output PSU (Common now but not pervasive) Medium Term 24-­‐36 mo. – Low load optimization of existing PSU’s using existing system architecture Low load Eff. optimization – may sacrifice high load Eff. Implementation costs still being evaluated Long Term 36mo. Plus – Low load optimization of PSU’s requiring silicon changes Variable frequency / pulse skipping … Evaluate Light load indication system to PSU – PSU redesign plus 6-9 mo. min to evaluate opportunities for light load indication Implementation costs still being evaluated Variability of light load efficiency in production may be significant – PSU losses become dominated by parameters insignificant in normal operation – Aggressive limits may drive significant yield loss driving up costs 10

Improving low-load efficiency Increasing efficiency below 20% load is a long-term project In the December 16, 2015 EPRI and Ecova report named Test Results for Low Power Testing of Computer Power Supplies - stated “lower leakage currents and switching losses as well as new techniques for addressing emissions through better filter designs or switching algorithms would be required” Because the loading point varies based upon the maximum output wattage (200W vs. 500W), specifying efficiency at a fixed loading point is not sufficient Industry needs time to work with our suppliers and EPRI/Ecova to investigate a global standard that comprehends the technical difficulties and recognizes/awards best practices 11

Schedule Impacts Manufacturers cannot update design criteria until a final (locked) regulation is published 1 year between publication and effective date does not provide adequate time to redesign shipping models nor introduce design changes to models that are undergoing global Safety, EMI, and Environmental certifications and have not been placed on the global market Major motherboard and chipset design changes typically require a minimum of 24 months to verify, implement and certify for the global marketplace Industry requests models that are already on the market on/after the effective date be grandfathered from the 50 kWh Desktop TEC limits New models introduced to the market after the effective date would comply to all CEC criteria 12

Additional Schedule Impacts Manufacturers adhere to technology roadmaps that incorporate new technology enhancements To further reduce idle mode power, additional modifications to those designs must include – New Power Supply’s – New CPU’s/Chipsets/Motherboards – 2.5” or SSD hard drives – Discrete Graphics cards with reduced idle power – Expandability cards (NIC, Sound, TV tuner, etc.) – Operating Systems enhancements to allow computers to remain in lower-power idle state (schedule/delay background tasks) – Anti-virus, Spyware, Malware, and other Security enhancements – Global EMI, Safety, Environmental, and other certifications A minimum months is necessary 13

END