CAPITAL BUDGETING DECISIONS Should we build this plant? Sovraj Gautam.

Slides:



Advertisements
Similar presentations
11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
Advertisements

9-0 Chapter 9: Outline Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal Rate of Return The Profitability.
Chapter 11: Capital Budgeting: Decision Criteria Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability Index.
Should we build this plant? Lecture Twelve Capital Budgeting The Basics.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
B280F Introduction to Financial Management
I. M. Pandey, Financial Management, 9th ed., Vikas.
Ch9. The Basic of Capital Budgeting Goal: To understand the advantage and disadvantage in different investment analyzing tools Tool: - Net Present Value.
CAPITAL BUDGETING TECHNIQUES
CAPITAL BUDGETING DECISIONS
CapitalBudgeting Payback Net present value (NPV)
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
CHAPTER 10 The Basics of Capital Budgeting 1. Payback Period 2. Discounted Payback 3. Net Present Value (NPV) 4. Internal Rate of Return (IRR) 5. Modified.
Net Present Value and Other Investment Criteria
0 Net Present Value and Other Investment Criteria.
Chapter 10 - Capital Budgeting
Chapter 9 INVESTMENT CRITERIA Pr. Zoubida SAMLAL GF 200.
Net Present Value RWJ-Chapter 9.
9 - 1 Copyright © 2001 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
Copyright © 2002 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
GBUS502 Vicentiu Covrig 1 The basics of capital budgeting (chapter 11) Should we build this plant?
1 Chapter 11 The Basics of Capital Budgeting: Evaluating Cash Flows.
Should we build this plant? The Basics of Capital Budgeting.
1 Chapter 13 Capital Budgeting: Decision Criteria.
1 Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability.
Key Concepts and Skills
Key Concepts and Skills
10-1 CHAPTER 10 The Basics of Capital Budgeting Should we build this plant?
CHAPTER 10 The Basics of Capital Budgeting Omar Al Nasser, Ph.D. FIN
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
CAPITAL BUDGETING. CAPITAL EXPENDITURES AND THEIR IMPORTANCE The basic characteristics of a capital expenditure (also referred to as a capital investment.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
10-1 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large.
Copyright © 2001 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
Chapter 10: The Basics Of Capital Budgeting. 2 The Basics Of Capital Budgeting :
Chapter 11: THE BASICS OF CAPITAL BUDGETING Should we build this plant?
Good Decision Criteria
Capital Budgeting Chapter 11.
Chapter 13 Capital Budgeting Techniques. Learning Objectives After studying Chapter 13, you should be able to: Understand the payback period (PBP) method.
Capital Budgeting Decisions. What is Capital Budgeting? The process of identifying, analyzing, and selecting investment projects whose returns (cash flows)
11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
10-1 The Basics of Capital Budgeting Should we build this plant?
Chapter - 8 Capital Budgeting Decisions. 2 Chapter Objectives Understand the nature and importance of investment decisions. Distinguish between discounted.
1 Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows.
10-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
CHAPTER 11 The Basics of Capital Budgeting
Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
Ch10. The Basic of Capital Budgeting Goal: To understand the advantage and disadvantage in different investment analyzing tools Tool: - Net Present Value.
Net Present Value and Other Investment Criteria By : Else Fernanda, SE.Ak., M.Sc. ICFI.
Capital Budgeting: Decision Criteria
What is capital budgeting? Analysis of potential projects. Long-term decisions; involve large expenditures. Very important to firm’s future.
Basics of Capital Budgeting. An Overview of Capital Budgeting.
The Basics of Capital Budgeting: Investment Criteria and
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
13-1 Chapter 13 Capital Budgeting Techniques © 2001 Prentice-Hall, Inc. Fundamentals of Financial Management, 11/e Created by: Gregory A. Kuhlemeyer, Ph.D.
ALL RIGHTS RESERVED No part of this document may be reproduced without written approval from Limkokwing University of Creative Technology 1-1 Chapter 8.
Capital Budgeting Tools and Technique. What is Capital Budgeting In “Capital budgeting” capital relates to the total funds employs in an enterprise as.
Live as if you were to die tomorrow & Learn as if you were to live for ever.
10-1 CHAPTER 10 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions;
1 CHAPTER 5 Capital Budgeting Techniques. 2 Introduction to capital budgeting Payback period Discounted payback period Net Present value (NPV) Profitability.
DMH1. 2 The most widely accepted objective of the firm is to maximize the value of the firm. The financial management is largely concerned with investment,
CHAPTER 10 The Basics of Capital Budgeting
16BA608/FINANCIAL MANAGEMENT
The Basics of Capital Budgeting
The Basics of Capital Budgeting
CHAPTER 10 The Basics of Capital Budgeting
CHAPTER 10 The Basics of Capital Budgeting
Presentation transcript:

CAPITAL BUDGETING DECISIONS Should we build this plant? Sovraj Gautam

CAPITAL BUDGETING DECISIONS The investment decisions of a firm are generally known as the capital budgeting, or capital expenditure decisions. The firm’s investment decisions would generally include expansion, acquisition, modernisation and replacement of the long-term assets. Sale of a division or business (divestment) is also as an investment decision. Decisions like the change in the methods of sales distribution, or an advertisement campaign or a research and development programme have long- term implications for the firm’s expenditures and benefits, and therefore, they should also be evaluated as investment decisions.

TYPES OF INVESTMENT DECISIONS One classification is as follows:  Expansion of existing business  Expansion of new business  Replacement and modernisation Yet another useful way to classify investments is as follows:  Mutually exclusive investments  Independent investments  Contingent investments

AN EXAMPLE OF MUTUALLY EXCLUSIVE PROJECTS BRIDGE vs. BOAT to get products across a river.

TYPES OF CASH FLOWS Normal or Conventional Cash Flow :  One change of signs.  Cost (negative CF) followed by a series of positive cash inflows. Non-normal or unconventional Cash Flow:  Two or more changes of signs.  Most common: Cost (negative CF), then string of positive CFs,then cost to close project.  Example: Nuclear power plant, strip mine.

CAPITAL BUDGETING DECISIONS These are generally: Long-term decisions; involving large expenditures. Have long term consequences. Difficult or expensive to reverse.

Capital Budgeting Methods Discounting Criteria NPVBCRIRR MIRR PBPARR DPBP Non Discounting Criteria

NET PRESENT VALUE NPV of a project is the sum of the present values of all the cash flows positive as well as negative that are expected to occur over the life of the project. The formula for NPV is:

NET PRESENT VALUE Where,  C t = cash flow at the end of year t  n = Life of the project  k = discount rate (given by the projects opportunity cost of capital which is equal to the required rate of return expected by investors on investments of equivalent risk).  C 0 = Initial investment  1 / (1 + k ) t = known as discounting factor or PVIF i.e present value interest factor.

CALCULATING NET PRESENT VALUE Assume that Project X costs Rs 2,500 now and is expected to generate year-end cash inflows of Rs 900, Rs 800, Rs 700, Rs 600 and Rs 500 in years 1 through 5. The opportunity cost of the capital may be assumed to be 10 per cent.

ACCEPTANCE RULE OF NPV Accept the project when NPV is positive NPV > 0 Reject the project when NPV is negative NPV < 0 May accept or reject the project when NPV is zero NPV = 0 ( A project will have NPV = 0, only when the project generates cash inflows at a rate just equal to the opportunity cost of capital ) The NPV method can be used to select between mutually exclusive projects; the one with the higher NPV should be selected.

ADVANTAGES OF NPV METHOD It considers time value of money. It is a true measure of profitability as it uses the present values of all cash flows (both outflows & inflows) & opportunity cost as discount rate rather than any other arbitrary assumption or subjective consideration. The NPVs of individual projects can be simply added to calculate the value of the firm. This is known as “Principle of value additivity”. It is consistent with the shareholders wealth maximization principle as whenever a project with positive NPV is undertaken, it results in positive cash flows and hence the increase in the value of the firm.

DISADVANTAGES OF NPV METHOD It is difficult to estimate the expected cash flows from a project. Discount rate to be used is very difficult to determine. Since this method does not consider the life of the projects, in case of mutually exclusive projects with different life, the NPV rule, tends to be biased in favour of the longer term project. Since NPV is expressed in absolute terms rather than relative terms it does not consider the scale of investment.

BENEFIT COST RATIO It is calculated as: Benefit-cost ratio = PVB / I Where, PVB = present value of benefits I = Initial investments

ACCEPTANCE RULE FOR BCR BCR > 1 = Accept BCR = 1 = Indifferent BCR < 1 = Reject

EVALUATION OF BCR METHOD Advantages of BCR method: Since it considers the investment in the project, it is considered to be preferable to NPV method. Disadvantages of BCR method: It does not provide for a means through which a number of smaller projects can be combined to be compared to a bigger project.

Internal Rate of Return: IRR 0123 CF 0 Cost CF 1 CF 2 CF 3 Cash Inflow IRR is the rate of return that equates PV of cash inflows with investment outlay of a project. This is the same as forcing NPV = 0.

INTERNAL RATE OF RETURN METHOD The internal rate of return (IRR) is the rate that equates the investment outlay with the present value of cash inflow received after one period. This also implies that the rate of return is the discount rate which makes NPV = 0. The formula for calculating IRR is:

INTERNAL RATE OF RETURN METHOD Where,  C t = cash flow at the end of year t  n = Life of the project  r = discount rate  C 0 = Initial investment  1 / (1 + r ) t = known as discounting factor or PVIF i.e present value interest factor.

CALCULATION OF IRR Level or even Cash Flows:  Let us assume that an investment would cost Rs 20,000 and provide annual cash inflow of Rs 5,430 for 6 years.  The IRR of the investment can be found out as follows: IRR = 16% approx.( Refer to PVAF for 6 yrs

NPV Profile and IRR

CALCULATION OF IRR Uneven or non–normal Cash Flows: Calculating IRR by Trial and Error  The approach is to select any discount rate to compute the present value of cash inflows. If the calculated present value of the expected cash inflow is lower than the present value of cash outflows, a lower rate should be tried. On the other hand, a higher value should be tried if the present value of inflows is higher than the present value of outflows. This process will be repeated unless the net present value becomes zero.

CALCULATION OF IRR A project costs Rs and is expected to generate cash inflows of Rs. 8000, Rs.7000 & Rs.6000 at the end of each year for next 3 years.

ACCEPTANCE RULE FOR IRR Accept the project when r (IRR) > k (WACC). Reject the project when r (IRR) < k (WACC). May accept the project when r = k. In case of independent projects, IRR and NPV rules will give the same results if the firm has no shortage of funds. In case of projects with equal IRR & different NPV, select project with higher NPV as it is consistent with firm’s wealth maximisation objective.

ADVANTAGES OF IRR METHOD It considers time value of money. It is a true measure of profitability as it uses the present values of all cash flows(both outflows & inflows) rather than any other arbitrary assumption or subjective consideration. In case of conventional independent projects NPV & IRR methods gives the same decision. Whenever a project with higher IRR than WACC is undertaken, it results in the increase in the shareholder’s return. Hence, the value of the firm also increases.

PROBLEMS WITH IRR Lending & Borrowing projects: Project with initial outflow followed by inflows is a lending type project whereas a project with initial inflow followed by outflows is a borrowing project. Since IRR does not differentiate between lending and borrowing projects, a higher IRR may not always be a desirable thing. Multiple IRR: In case of projects with non-normal or unconventional cash flows more than one IRR are generated which are misleading. Mutually Exclusive projects: In case of mutually exclusive projects the results of NPV & IRR methods may conflict each other. This is because the IRR method does consider the scale of investment.

PROBLEMS WITH IRR Different short term & Long term interest rates: Since the cash flows are discounted at the opportunity cost of capital, there arises a confusion regarding what rate is to be used for discounting, if the short term and long term lending rates are different.

LENDING & BROWING PROJECTS Lending projects: Project with initial outflow followed by inflows is a lending type project. Borrowing projects: Project with initial inflow followed by outflows is a borrowing project. Cash Flows (Rs.) ProjectCoCo C1C1 IRRNPV at 10% X %0 Y %0

LENDING &BORROWING PROJECTS Cash Flows (Rs.) ProjectCoCo C1C1 IRRNPV at 5% X %4.72 Y %-4.72 Cash Flows (Rs.) ProjectCoCo C1C1 IRRNPV at 15% X %-4.3 Y %4.3

PROBLEM OF MULTIPLE IRRS A project may have both lending and borrowing features together. IRR method, when used to evaluate such non-conventional investment can yield multiple internal rates of return because of more than one change of signs in cash flows.

Case of Ranking Mutually Exclusive Projects Investment projects are said to be mutually exclusive when only one investment could be accepted and others would have to be excluded. Two independent projects may also be mutually exclusive if a financial constraint is imposed. The NPV and IRR rules give conflicting ranking to the projects under the following conditions:  The cash flow pattern of the projects may differ. That is, the cash flows of one project may increase over time, while those of others may decrease or vice-versa.  The cash outlays of the projects may differ.  The projects may have different expected lives.

RANKING MUTUALLY EXCLUSIVE PROJECTS (Timing of Cash Flows) Discount RateProject MProject N

% 10%15% 20%25%30% NPV Discount Rate NPV INR 276/- ___ Project M ---- Project N RANKING MUTUALLY EXCLUSIVE PROJECTS (Timing of Cash Flows) 10% discount is k/as Fisher’s intersection.

RANKING MUTUALLY EXCLUSIVE PROJECTS (Scale of Investment)

RANKING MUTUALLY EXCLUSIVE PROJECTS (Project Life Span)

Modified Internal Rate of Return (MIRR) The modified internal rate of return (MIRR) is the compound average annual rate that is calculated with a reinvestment rate different than the project’s IRR. Both NPV & IRR methods assume that the entire cash flow generated during the life time of the project is reinvested at project cost of capital (i.e k) & internal rate of return (i.e r) respectively in each of the above two methods. But, in MIRR the cashflows are assumed to be reinvested at cost of capital ( k) instead of internal rate of return ( r )as in IRR method.

PAY BACK PERIOD It is the number of years required to recover a project’s cost, or how long does it take to get the business’s money back?

= CF Cumulative Payback 2+30/80 = years PAY BACK PERIOD -30

Strengths of Payback: 1.Provides an indication of a project’s risk and liquidity. 2.Easy to calculate and understand. Weaknesses of Payback: 1.Ignores the time value of money. 2.Ignores CFs occurring after the payback period. 3.It is a measure of capital recovery & not profitability. PAY BACK PERIOD

DISCOUNTED PAYBACK PERIOD (DPBP) CF t Cumulative Discounted payback /60.11 = 2.7 yrs Discounted Payback: Uses discounted rather than raw CFs. PVCF t =

ACCOUNTING RATE OF RETURN The accounting rate of return is the ratio of the average after-tax profit divided by the average investment. A variation of the ARR method is to divide average earnings after taxes by the original cost of the project instead of the average cost.

ACCEPTANCE RULE OF ARR This method will accept all those projects whose ARR is higher than the minimum rate established by the management and reject those projects which have ARR less than the minimum rate. This method would rank a project as number one if it has highest ARR and lowest rank would be assigned to the project with lowest ARR.

ACCOUNTING RATE OF RETURN The ARR method has certain advantages as:  It is very simple to understand.  Dependency on accounting data which is readily available.  Shows the profitability of the project.

ACCOUNTING RATE OF RETURN The disadvantages of ARR include:  It is based on accounting profit rather than cash flows.  Time value of money is ignored.  It is inconsistent in the sense that the numerator represents the profit belonging to equity and preference shareholders whereas the fixed assets used in denominator rarely if ever represents contribution equal to equity & preference shareholders.