In Progress Queensland. Upcoming Events March 13thCIWG – OH&S at Bluescope; (920 Nudgee Rd. Banyo) Free to members and guests 13&14 th RCA problem solving;

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Copyright EMS Consulting Group, Inc Creating an Environment for Continuous Improvement Darren Dolcemascolo EMS Consulting Group,
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
CONTINUAL IMPROVEMENT
Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
A3 Reports. Aims & Objectives Target Audience : Anyone who has to write a report or proposal Purpose of Module : To confirm understanding and benefits.
Supplier Development Kaizen Implementation Kit
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Lean Manufacturing Cellular Manufacturing One Piece Flow for Workteams
Achieving Changeover Flexibility Brigham Young University Prepared by: Kortney J. Jurado.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Introduction to 6S.
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
MSE507 Lean Manufacturing
CONTINUOUS IMPROVEMENT PROGRAM
Introduction to 5S. What is 5S? An easy definition is: Finding a place for everything and putting everything in its place. 5S is also the foundation for.
Lean Organizational Structure Lean Leadership Series.
How to Effectively Implement Set-up Reduction in Any Organization.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Setup Reduction Module
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Quick Changeovers & SMED
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Group Exercise Instructions
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
JIT and Lean Operations
Single Minute Exchange of Dies
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Visual Management – an Overview. What is Visual Management? Visual Management is a set of techniques for creating a workplace embracing visual communication.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Home Public Training Courses Contact Us for public training courses on operational excellence through lean and six sigma Hands on Implementation Contact.
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Single Minute Exchange of Die OR Quick Changeover
Chart Your Course to Business Success On Target Business Intensive: Session 8 February 28, 2012 Advisors On Target 1.
“Without the Cost of Waste …”
2 Purpose, Content and Value The Purpose of the MLC Library is to provide members with lean training material and recommended knowledge resources for.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
1  Established in 1964  Located in Escondido, Ca Company Vision: To be the most dependable, diversified and efficient job shop, dedicated to unbeatable.
Manufacturing Advisory Service South-West Jon Hurrell.
Niblock & Associates, LLC ©2010 Niblock & Associates, LLC Christian M. Paulsen 1.
Continuous Improvement (CI) Overview A quick review of principles, methodology, and tools.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.
Yellow Belt Training 10 Step Kaizen Process
Phase II QS 627/727 Documentation-based Process Improvement.
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
5S Introduction – Workplace Organisation
Chart Your Course to Business Success On Target Business Intensive: Session 8 May 15, 2012 Advisors On Target 1.
Implementing Lean Accounting Making it happen © BMA Inc All rights reserved.
Work In Progress Queensland. TODAY’S AGENDA This is your meeting… amSafety Brief (Site representative) 9.05amIntroduction to LEAN and 5S principles.
Queensland Operations Excellence Work Groups Over 20 events annually “Focused on delivering outcomes” (2 seats per topic as part of membership) Leaders.
Top lean six sigma consulting strategies for businesses Lean Six Sigma Manufacturing Consulting By: Group50.com.
Productive and Lean Improvement Initiatives Team Champions Training 26 th July, :00 – 13:00 Parkland Hospital.
Lean operations and JIT
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Changeover Single Minute Exchange of Dies
5S BASIC TRAINING What is 5S and why do we want to do it?
Quick Changeover.
Total Productive Maintenance and Quick Changeover
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
5S BASIC TRAINING What is 5S and why do we want to do it?
Japanese Production Methods
Quick Changeovers Definitions Analysis and Methods GEOP 4316.
Quick Changeover Techniques
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Set-Up Technique
Quick Set-Up Technique
5S BASIC TRAINING What is 5S and why do we want to do it?
Presentation transcript:

In Progress Queensland

Upcoming Events March 13thCIWG – OH&S at Bluescope; (920 Nudgee Rd. Banyo) Free to members and guests 13&14 th RCA problem solving; Townsville 25% discount to members 20 th CIWG – OH&S at Parmalat; (35 Boundary Str. South Brisbane) Free to members and guests 22&23 rd Ron Moore – Reliability Leadership; (Novotel Brisbane) 25% discount to members 28 th Leaders Roundtable – Key Personnel Strategies Port of Brisbane Visitor Centre I seat free to members and guests Feedback required on agenda items for balance of 2012 please

Agenda 9.00amSafety Brief (site representative) 9.05amIntroduction to waste elimination – quick change over - Presentation by Gary Practical application of waste elimination - Presentation by Nufarm 10.30amMorning Tea 10.50am Factory Tour - High lights of waste elimination on the Nufarm site 12.15pmLunch 12.45pmWaste elimination workshop - Discovery and documentation of what we have learnt 2.00pm Close

Lean – Waste Elimination

LEAN Tools A model implementation is like building a house …… Start with the foundations Progressively work on building quality into the products and processes Ensure that processes are developed to eliminate waiting and queuing Through effective education, involvement and leadership the people have the capability to make this happen and develop a culture for continuous improvement

LEAN Pillars Quick Change Over-Can also be referred to as Single Minute Exchange of Dies (SMED); subject of today Single Piece Flow-Very small or single production runs versus large batch mentality, allowing significant flexibility to meet market demand Pull-Manufacturing system where production is based on market demand not manufacturing capacities (Push). Ensure that processes are developed to eliminate waiting and queuing

Quick Change Over or SMED (Single Minute Exchange of Dies)

Concept developed by Shigeo Shingo for Japanese Automakers in the 1950s SMED - The aim is to reduce change over times and increase frequency! What is SMED? Shigeo Shingo “Are you too busy for improvement? Frequently, I am rebuffed by people who say they are too busy and have no time for such activities. I make it a point to respond by telling people, look, you’ll stop being busy either when you die or when the company goes bankrupt.”

The time from the last good piece produced at the standard production rate to the first good piece produced, again, at the standard production rate. Run Down Stopped Ramp Up Time Rate Changeover Time Lost Production Change Over Time

SMED is commonly used on the shop floor, but can be applied to any process…. SMED – Key Outcomes More Frequent Changeovers Customer Satisfaction Reduced WIP Reduced Lead Time Improved Quality Increased Profitability Reduced waste Increased Capacity Increased Flexibility

Product A Product B Identify Classify Convert Streamline Measure, Monitor & Standardize No cost Low cost Five Step Method

Quick Changeover Activity Sheet # InternalExternalActivity Elapsed Time Taken Go to office for paperwork Unbolt and remove fences Unbolt and remove guard Unbolt and remove cutters Go to tool room new cutters Set cutters into position Adjust into cutting circle Bolt fences into position sec Step 1 – Identify Activities

Document Process Flow

Quick Changeover Activity Sheet # InternalExternalActivity Elapsed Time Taken Go to office for paperwork Unbolt and remove fences Unbolt and remove guard Unbolt and remove cutters Go to tool room new cutters Set cutters into position Replace guard Bolt fences into position sec Step 2 – Classify Activities Classification Internal activities can only be performed when the process is stopped; while External activities can be performed without interrupting process and maintaining standard outputs.

Ask WHY 5 times Bring an independent person into the process to question every activity Step 3 – Convert Internal to External Activities

Quick Changeover Activity Sheet # InternalExternalActivity Elapsed Time Taken Go to office for paperwork Unbolt and remove fences Unbolt and remove guard Unbolt and remove cutters Go to tool room new cutters Set cutters into position Replace Guard Bolt fences into position sec Step 3 – Convert Internal to External Activities

Can an activity be streamlined through? Elimination Reduction Simplification Running in parallel Teamwork Combination Step 4 – Streamlining Activities

Management Principle “If you can’t measure it, you can’t control it.” Changeover Principle “If you don’t measure it, you won’t repeat it” Step 5 – Measure, Monitor, Standardise

Current Changeover Time Targeted Time Change Over Time Shadow board Standard Fasteners Hard Stops Quick Release Guards Layout Program Accessibility Implementation Step 5 – Measure, Monitor, Standardise

SMED is a process for achieving waste reduction or elimination, through documentation, brainstorming and standardisation; producing significant improvements in: Customer satisfaction Decreased lead times, increased flexibility, improved quality Employee satisfaction Increased efficiency, lower downtime, better work environment, lower operator risk Financial returns Lower downtime, increased capacity, reduced WIP, reduced stock holding, waste reduction Summary

Lean - Waste Elimination Nufarm’s approach to waste elimination!

 Tony Your Presentation will go in here….. 23 Waste Elimination

24 Factory Tour  Host to give run down on safety requirements for the factory tour….

Lean – Waste Elimination Key points from today Breakaway group activity

 Get foundations right first  Engagement of employees/management  Change over matrix  Identify waste streams/pie chart  Waste audits  Ecobiz network grants  Sustainability model (pacia)  5 whys – “look outside the box”  Different approach to lean  True cost of waste elimination  Communication critical  Break down tasks Key Points From Today

 SMED Activity  Split into 2 or 3 groups  Complete a basic SMED exercise to reduce the waste factor in a simple activity or process which you may have seen today or may currently be an issue in your workplace.  Utilise the 5 steps methodology  Brainstorm ideas on how to reduce or eliminate waste  Document the process and positive outcomes  Present and share with the group Exercise (Group Activity 30 mins & Presentation)

Exercise (Team A – Liquid Fill Line) Quick Changeover Activity Sheet #ActivityElapsed Time Time Taken (Seconds) InternalExternal 1Retract spill tray2 2Lower nozzle8 3Fill10 4Raise nozzle8 5Extend spill tray2 Total45 Options Retract as you fill Pressure fill Sterac nozzles Parallel fill

Exercise (Team B – Bottling & Labelling) Quick Changeover Activity Sheet #ActivityElapsed Time Time Taken (Minutes) InternalExternal 1Check Paperwork2 2Collect Labels5 3Retrieve empty bottles3 4QC check2 5Adjust machine10 6Run sample0.5 7QC test2 Total

Exercise (Team B – Bottling & Labelling) Activities Items 2 to 5 – Complete while previous job is running Item 6 – Standard settings, visual colour code, label toolkits, shadow boards, work instructions & training Item 7 – As is Item 8 – Rapid adjust guide Time reductions Additional considerations Improved scheduling Measure conformance Root Cause Waste – eg. Categories & time