PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010.

Slides:



Advertisements
Similar presentations
Mountainside Sports & Recreation Center. 1 What does the author mean by Scheduled league events may periodically limit public availability? Ο A. Softball.
Advertisements

Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
ALL CANDIDATES MEETING TUES. SEPT. 28TH. AGENDA 1. WELCOME 2. GROUND RULES FOR MEETING (2 Min.) 3. SPORT KAWARTHA PRESENTATION (20 Min.) 4. CANDIDATES.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
The Parks of the City of Fredericksburg. Parks Staff The Parks Maintenance Division is currently staffed with: –One Division Manager –One Supervisor of.
Walker Park Master Plan Community Workshop No. 1 City of Galt June 13, 2014 project specific image(s)
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
Rio Grande Vision Concepts. Overview The Rio Grande Vision is a conceptual plan for the future of the Rio Grande and Bosque with a goal of bringing the.
Fletcher Park Renovations 1. Existing Conditions.
Loxton Playground Working Group Loxton Playground Working Group Proposal to Loxton Waikerie District Council Proposal to Loxton Waikerie District Council.
Louisiana Yards and Neighborhoods For the Right Place Selecting the Right Plant.
Introduction Who we are - Team Intro Riverwalk part of overall revitalization of downtown area.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
Landscape Design Basics Or When Plants and People Collide.
Garden City Urban Renewal Agency  Independent public body serving the city of Garden City  Established by the City Council in 1995  Currently has one.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Pittsford :: Erie Canal Area Master Plan Public Workshop Welcome! Thank you for being here May 26, 2010 This presentation was prepared for the New York.
Parks & Recreation Department
Community Meeting Number One Former Fuchs Mizrachi School Site Master Planning University Heights, Ohio.
TH 100 Visual Quality Advisory Process VQAC Meeting One 6 December 2012.
“Down the Drain” Ecole St. Avila’s Sustainability Project Sustainability: Educating for ACTion Conference November 15 & 16, 2012 Manitoba Association of.
Campus Physical Development Plan Author: Warren Denny Workshop 4 Observations Phase Historic Development Natural Systems Built Systems Benchmark Institutions.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
The Perfect Park to Visit On Parents Weekend!. Come, sit, relax and have a family picnic at Lehman Park.
LANGHAM CREEK FAMILY Y Winter Youth Sports Coach Orientation.
Langham Creek Family YMCA Youth Sports Winter
Proposal to Renovate the Gunter Park By Brooke Hogan By Brooke Hogan.
Session Learning Objectives Facilities and Grounds by Harry Lorick Identify the benefit of facilities and grounds to the public Analyze the requirements.
Pleasant Grove. The Task What items must be included/addressed in the Master Plan of Pleasant Grove that the County will undertake?
Tyler Park Master Plan 21 May 2009 Tyler Park Master Plan City of Louisville, Kentucky Olmsted Parks Conservancy MetroParks environs, inc. landscape architecture.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
 Have you ever been to Hyde Park?  What did you see?  What did you do?  Have you ever travelled by train?  Where did you go?  Who did you go with?
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
FINALIZATION OF MASTER PLAN STEGE ELEMENTARY SCHOOL PRESENTATION MAY 14, 2013 POWELL & PARTNERS, ARCHITECTS.
Access and Inclusion 4th April 2008 Play Pathfinder and Playbuilder Start-up.
Playground Design Process © 2011 Project Lead The Way, Inc. Design and Modeling.
The Importance of the Parks Department in Aspen Falls.
Coleshill Memorial Park
A perfect place to grow…. Presentation Outline Mission Overview Budget Parks Programs Special Events Projects Future Questions.
Landscape Design Basics Or When Plants and People Collide.
Community Development Department Holland Park Renovations Playground & Splash Park Design.
Task Force Meeting #1 August 5, 2010 Indian Mounds Regional Park Master Plan Saint Paul Department of Parks and Recreation.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Unit 3: Neighborhood News Theme 5: My Neighborhood
South Greenville Recreation Center and Park Master Plan.
Ford Site Open Space Work Group Meeting #4: November 15, 2010.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
March 30, Introduction to St. Paul Blackhawks Hear from our coaches, players and community Blackhawks Partnership with SPPR & Orchard Rec Center.
CHAPEL HILL PARKS & RECREATION Comprehensive Parks Plan Chapel Hill Greenways Master Plan.
Chapter 6 6 Maintenance C H A P T E R Brent Beggs.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016.
Capital Improvement Recommendations October 27, 2016.
Bond Project Update September 2017
Neighborhood Project Funds
WHITING LAKEFRONT PLAN
MEMORIAL PARK DONATIONS AND NAMING OPPORTUNITIES
Capital Construction Bond Program
Salk Neighborhood Park & Joint Use Development
Facilities Update governing Board meeting
Uses of Technology for Teaching and Learning: The Gallery Walk
2017 Florida Redevelopment Awards Capital Projects/Beautification
Good Morning. Thank you for your time.
District 4 Community Park Meeting Nov
Competency: Create site plan drawings
Council Agenda Item #5 February 4, 2019
Cascadia College UW Bothell Parking
FY Budget Workshop Meeting
A Healthy and Vibrant Edgewood
Presentation transcript:

PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010

Welcome to the presentation of the Draft Master Plan for Pleasant View Park. Agenda  Welcome & Introductions  Review  Parks History  Public Process  Design Workshop Review & Results  Presentation of Draft Master Plan  Phasing & Costs  Next Steps  Public Comment  Comment Form & Plans PLEASANT VIEW PARK DRAFT MASTER PLAN

Design Workshop Review and Results

PLEASANT VIEW PARK DRAFT MASTER PLAN Design Workshop Review  Guiding Principles  Goal = Consensus  All may not agree 100% but all can support enough to not sabotage.

PLEASANT VIEW PARK DRAFT MASTER PLAN Design Workshop Review  Basic Assumptions

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work VALUES  Something For Everyone (4 dots)  Safety (3 dots)  Aesthetics (2 dots)  Public (1dot)  Diversity (1dot)  Themed (1dot)

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work INTERESTS  Neighborhood – Picnic Areas (7 dots)  Hikers – Thru Trails (5 dots)  Dog Folks – Neat & Contained (5 dots)  Families & Kids – Rec. at Park not HGS (4 dots)  Sports – Established Facilities Needed (4 dots)  Kids – Play (4 dots)

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work DESCRIPTIVE WORDS  Water feature – fountain, drinking fountain (7 dots)  Trees (7 dots)  Walking Trails (4 dots)  Multi Use (3 dots)  Relaxing (2 dots)  Meadow-like (2 dots)

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work IMPORTANT QUESTIONS  Plan of action  Schedule  Costs  Funding  Safety  Facilities

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Blank Plan

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 1

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 2

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 3

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 1 Plan

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 2 Plan

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 3 Plan

PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Kid’s Workshop

PLEASANT VIEW PARK DRAFT MASTER PLAN

Project Phasing Phase 1  Final Design & Construction Drawings  Demolition & Salvage  Grading & Drainage  Create berms & mounds  Walkways  Irrigation  Turf & Trees

PLEASANT VIEW PARK DRAFT MASTER PLAN Project Phasing Phase 2 – Completion  Final Design & Construction Drawings  Fence  Gazebo & Restrooms  Tennis & Multi-sport Courts  Backstop  Playground Infrastructure, Equipment & Fall Zone  Park Furnishings  Trees & shrub beds

PLEASANT VIEW PARK DRAFT MASTER PLAN

Thank you for participating Please: Fill out a Comment Form Make Comments on the master plans provided PLEASANT VIEW PARK DRAFT MASTER PLAN