CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.

Slides:



Advertisements
Similar presentations
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Advertisements

Telecom Cabling Grounding and bonding.
EE4503 Electrical Systems Design
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
EET Survey of Electronics
SUBSTATION HIGH VOLTAGE COMPONENTS
Residential Wiring Facts
Dealer Certification Section 2: Building the Network Physical Planning & Documentation Power Sources & Distribution Voltage Drop Calculations Copyright.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
Operational and Technical Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Engineering Technology Division
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Preliminary Studies of the Electric Power Distribution for CLIC
ELECTRICAL SAFETY Part 1: Basic Electricity k groves /e haller.
Electrical Power J. Mitchell for AE-210. What Does Electrical Power Do? Provides Energy for Buildings Provides Energy for Buildings Usually all except.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Wiring and Grounding.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
NGfL CYMRU GCaD ELECTRICAL WORKS DISCLAIMER Neither WJEC or NGfL accepts any responsibility whatsoever for any injury, however caused,
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Grounding.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Installation of the T600 at Fermilab CSN2, September 22,
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
ESS Grounding System Concept Fundamentals and Requirements
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
Residential Wiring Unit 3 – Installation and Planning.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
ELECTRICAL INSTRUMENTS ( service and utilization )
PXIE Layout and Infrastructure Building, Cryogenics, Utilities… Rich Stanek On behalf of the CMTF Team PXIE Collaboration Meeting November 28, 2012.
Chapter 28 Sources of Magnetic Field Ampère’s Law Example 28-6: Field inside and outside a wire. A long straight cylindrical wire conductor of radius.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Grounding the Electrical System
Grounding.
2011 Changes Two Minute Drill
Shipboard Electrical Distribution
SBN Far Detector integration model overview
Grounding the Electrical System
Electrical Machine-I EE 2107 Dr. Md. Sherajul Islam
Electrical Gas Plumbing Heating & Cooling
Components of Substation
Unit 2.4 Electric Circuits
EHV Transmission Equipments
EET 323 – Electrical System Design Lecture 9: Grounding
Contactor A contactor is an electrically controlled switch (relay) used for switching an electrical power circuit. A contactor is typically controlled.
Smitty’s Two Minute Drill Grounding and Bonding
1-2 Grounding Principles and CF Infrastructure in Instruments Halls
Presentation transcript:

CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 A few quick notes about the CMTF Facility grounding plan; 1.The facility was designed primarily for Cryo-Module Testing and support of the He-superfluid plant. The decision to build an accelerator at CMTF was made well after the concrete had dried. 2.It is the object of the CMTF grounding system design to accommodate a “star” topology that will minimize ground loops and potential differences in the grounds as much as possible given the present plan, which calls for the main power switchboard and a majority of the electrical equipment to be separated by the PIP-II Cave. 3.The proposed layout is open for discussion and change

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 A few quick notes about the CMTF Facility grounding plan; 1.The entire building is ringed with 500MCM Bare Cu at 4’ below grade. Highlighted in Yellow in the next slide. 2.Approximately every second vertical support column is connected to the building grounding loop by 4-0 bare copper where the column wire is Cadwelded to the building loop there is a 12ft copper ground rod. 3.Additional ground rods are located at each corner of the building at 10 locations surrounding the transformer pad. These locations are not highlighted on the next drawing

500 MCM Bare Buried

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 A few quick notes about the CMTF Facility; 1.The CMTF facility receives electrical power at 13.8kV from the Master Substation on feeders 35 and The CMTF facility is equipped with four 1.5 MVA transformers which can be fed from either feeder system 3.Each of the transformers feed a separate 480-Volt 3-Phase 2,000-Amp switchboard. The designation of these switchboards are NL-15D, NL-15E, NL-15F and NL-15G 4.Switchboards NL-15E, F and G are only feeding the seven Helium Warm Compressors in the Engine room. 5.Switchboard NL-15D feeds all building “hotel” loads and the entire PIP-II/CMTF Test Cave technical loads.

SWBD NL15-D

SWBD – NL15 D

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 For the next year, a grounding topology for the PIP-II accelerator will exist that would feature a small group of racks nearby the cave, with a small number of magnet supplies located temporarily inside the cave; and two RF Power Amplifiers located immediately outside the West side of the cave.

Present Power Panels

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 The long-range plan calls for additional Distribution; 1.On order is a new 1200-Amp 480-Volt 3-Phase panel with power monitoring. 2.This panel will feed the first set of requirements for the PIP-2 Cave, and a new set of distribution for the mezzanine. 3.The plan will include running power duct and conduit across the access walk-way, due to the late arrival of the CCI Helium cold compressor system – this will be after June Power for the PIP-II Solenoid and Corrector Magnet supplies and the new solid state RF Power Amplifiers has been installed so that those systems can be powered prior to the CCI ColdBox installation

NE NEW POWER PANELS 1200-Amp DISTRIBUTION

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 Within the first half of 2014, it is expected that the cable trays and related 2-0 bare copper safety grounds would be completed to the area near the new distribution panel DHP-NL15D1-4 which will be located along the West wall of the CMTF building high-bay.

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 The location of the new DHP-NL15D Amp distribution on the west wall of the high-bay and related installation of the cross- over cable trays will create an additional building ground location and related cable tray grounding location to the building ground. Please note the location of the green symbols, on the next slide, indicating the location of the vertical steel columns which are directly connected to the building ground loop. Although not ideal for the instrumentation grounding, the electrical code will require bonding of the new Distribution panel to this building ground.

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 For the next year, a grounding topology for the PIP-II accelerator will exist that would feature a small group of racks nearby the cave, with a small number of magnet supplies located temporarily inside the cave; and two RF Power Amplifiers located immediately outside the West side of the cave. Within that year, it is expected that the cable trays and related 2-0 bare copper safety grounds would be completed to the area near the new distribution panel DHP-NL15D1-4 which will be located along the West wall of the CMTF building highbay.

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 In order to present a “ clean” beamline grounding topology for the PIP-II accelerator; I propose a 4” copper bar ground that would run the length of the accelerator along and below the beamline. This would present a low-inductance grounding path for the higher frequency noise, and would be in addtion to any other ground paths presented by connections to cable tray grounds, cryogenic or water piping and device shield connections. The plan would be that this grounding bus-bar would be insulated from other grounds once it leaves the area of the source until it is connected to the “holy bolt.”

Low- Inductance 4” Copper Bus Isolated from Supporting Tray

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 The proposed grounding system would be completed by the end of 2014……

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 Questions ? We do expect continued discussion

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013 Thank You

CMTF Grounding for PIP-II K. Carlson 19 Dec 2013