HCM Analysis of Active Transportation and Demand Management Strategies Progress Report January 21, 2012 1 Dowling Associates Cambridge Systematics Rick.

Slides:



Advertisements
Similar presentations
Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
The 2010 Highway Capacity Manual
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
North Carolina’s Integration of 511 and Workzone Information Jo Ann Oerter State Technology Implementation and Maintenance Engineer North Carolina Department.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
Part 3 – Markings. Dotted (not broken) lane lines shall be used for non-continuing lanes:  Lane drops  Auxiliary lanes  Deceleration lanes  Acceleration.
Enhanced Safety Prediction Methodology and Analysis Tool for Freeways and Interchanges James A. Bonneson August 2012 NCHRP Project
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
Congestion Reduction Using Intelligent Transportation Systems Ben Sperry University of Evansville University of Evansville MESCON March 25, 2006.
Highway Capacity Software (HCS) – Part II
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
CE 578 Highway Traffic Operations Freeway Merge and Diverge Segments.
Automatic loading of inputs for Real Time Evacuation Scenario Simulations: evaluation using mesoscopic models Josep M. Aymamí 15th TRB National Transportation.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Mobile Barriers and MUTCD Typical Applications 2010 Annual Meeting National Committee on Uniform Traffic Control Temporary Traffic Control Technical Committee.
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
Transportation leadership you can trust. presented to Talking Freight Seminar presented by Richard Margiotta Cambridge Systematics, Inc. September 21,
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
Hcm 2010: work zones.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Roles of TMCs in Incident Management on Managed Lanes INTRODUCTION AND OVERVIEW MICHAEL TANTILLO VHB.
Integrated Travel Demand Model Challenges and Successes Tim Padgett, P.E., Kimley-Horn Scott Thomson, P.E., KYTC Saleem Salameh, Ph.D., P.E., KYOVA IPC.
How would a truck get through? Any suggestions?. No parking allows access.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Robert Brydia Project Lead, I-35 Traveler Information During Construction Texas A&M Transportation Institute WORK ZONES & LARGE TRUCKS THE CENTRAL TEXAS.
Traffic Flow Parameters Surface Street Application.
Phase 2: Data Collection Findings and Future Steps.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Problem 4: Okeechobee Road Stopped Control Analysis.
Understanding Work Zones
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
SHRP2 C05: Understanding the Contributions of Operations, Technology, and Design to Meeting Highway Capacity Needs Freeway Data Freeway data has been collected.
The New 2010 Highway Capacity Manual An Overview.
Maintenance and Temporary Traffic Control
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
The HCM Update & NCHRP 7-22 – The Planning & Prelim. Eng. Applications Guide January 2014.
NCHRP 7-22 Planning & Preliminary Engineering Applications Guide for the HCM Kittelson & Associates 01/12/15 1 Status Report.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
L08: INCORPORATING RELIABILITY INTO THE HCM FREEWAY AND MULTILANE SUBCOMMITTEE JANUARY 22, 2012 Kittelson & Associates, Inc. Cambridge Systematics Dowling.
Integrated Dynamic Travel Models: Recent SHRP2 Projects
Signalized Intersections
San Mateo Countywide Transportation Plan update
HCM – Sixth Edition What’s New in the HCM Sixth Edition
MODULE 2: TSMO Strategies
School of Civil Engineering
HERO UNIT Training Module
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
MODULE 2: TSMO Strategies
Presentation transcript:

HCM Analysis of Active Transportation and Demand Management Strategies Progress Report January 21, Dowling Associates Cambridge Systematics Rick Dowling - Richard Margiotta -

Project Purpose To develop updated methodologies, data sets, and content on the evaluation of active transportation and demand management (ATDM) strategies for the Highway Capacity Manual. Fill out Chapter 35 of Volume 4 with analysis methodologies and example problems. 2

Scope & Status (complete) Prepare Draft Methodology Guidebook ◦ May 2011, revised August 2011 Develop Software ◦ FREEVAL-ATDM – Nov Present Guide at Workshops ◦ DC, Chicago, San Francisco – complete 3

Scope & Status (in progress) Coordinate with SHRP2-L08 Develop New Analysis Methodologies ◦ Work Zone Management Strategies ◦ Incident Management Strategies ◦ Variable Speed Limits Update Software Additional Workshops and Info Briefs Update Chapter 35 4

Schedule Methodology development – March nd Round Workshops – April 2012 Draft Final Report – May 2012 Draft Updated Chapter 35 – June

Workshop Results Chicago & San Francisco ◦ State DOT’s eager for a method to evaluate ATDM strategies. ◦ Some concern over simplifying assumptions employed by method.  Especially modeling incidents. ◦ Software tools are still primitive. 6

Overview - ATDM Analysis Method 7 Challenge the System -Special Events, Weather, -Incidents, Work zones The ATDM Plan Responses - Traveler info - Dynamic Lanes/Shoulders - Ramp Metering, Signal Timing Compute Performance -Highway Capacity Manual -Micro/Meso-simulation Feedback

The ATDM Analysis Method 8 Performance With ATDM Performance With ATDM Start Compute Reliability Compute Reliability Before Performance Before Performance D/C Scenarios Operations Analysis Operations Analysis ATDM Plan Responses ATDM Plan Responses Before After Feedback

The ATDM Analysis Method 9 Performance With ATDM Performance With ATDM Start Compute Reliability Compute Reliability Before Performance Before Performance D/C Scenarios Operations Analysis Operations Analysis ATDM Plan Responses ATDM Plan Responses Before After Feedback

Performance Analysis Using Ops Tool Performance Analysis Using Ops Tool Performance Analysis Using Ops Tool Maintenance of Traffic Plans (MOTP) Decision Rules 30+ Scenarios Date Demand Weather Incident Date Demand Weather Incident Date Demand Weather Incident Scenario #V Demand = X Weather = Y Incident = Z 30+ Scenarios Compute Capacity and Speed Reductions Compute Capacity and Speed Reductions Compute Capacity and Speed Reductions Compute Capacity and Speed Adjustments Performance Analysis Using Ops (HCM) Tool Revise WZ/I MOTP’s Decision Rules Input Actions Results Work Zone Characteristics Work Zone & Incident MOTP’s ATDM Response – Work Zone/Incident Management VSL etc.

Maintenance of Traffic Plan Construction Approach ◦ Staging, sequencing, lane and ramp closure alternatives, alternative work schedules (night, weekend) Traffic Control Operations ◦ speed limit reductions, truck restrictions, signal timing (coordination and phasing), reversible lanes, physical barriers 11

MUTCD Typical Applications 12 Work Within the Traveled Way of a Freeway or Expressway (see Section 6G.14) Lane Shift on a FreewayTA-36 Double Lane Closure on a FreewayTA-37 Interior Lane Closure on a FreewayTA-38 Median Crossover on a FreewayTA-39 Median Crossover for an Entrance RampTA-40 Median Crossover for an Exit RampTA-41 Work in the Vicinity of an Exit RampTA-42 Partial Exit Ramp ClosureTA-43 Work in the Vicinity of an Entrance RampTA-44 Temporary Reversible Lane Using Movable BarriersTA-45

MUTCD TA’s – Urban Streets 13 Work Within the Traveled Way of an Urban Street (see Section 6G.11) Lane Closure on a Minor Street TA-18 Detour for One Travel Direction TA-19 Detour for a Closed Street TA-20 Work Within the Traveled Way at an Intersection and on Sidewalks (see Section 6G.13) Lane Closure on the Near Side of an IntersectionTA-21 Right-Hand Lane Closure on the Far Side of an IntersectionTA-22 Left-Hand Lane Closure on the Far Side of an IntersectionTA-23 Half Road Closure on the Far Side of an IntersectionTA-24 Multiple Lane Closures at an IntersectionTA-25 Closure in the Center of an IntersectionTA-26 Closure at the Side of an IntersectionTA-27 Sidewalk Detour or DiversionTA-28 Crosswalk Closures and Pedestrian DetoursTA-29

MUTCD Typical Application 14

ATDM Aspects of MOTP Public Information ◦ Pre-trip (511, newspapers, meetings, websites, cctv), on-site (VMS, HAR) Incident Management and Enforcement ◦ Incident management plans, traffic management centers, ITS, emergency service patrols, enhanced police enforcement. Travel Demand Management (TDM) ◦ incentives for alternative modes, park and ride. 15

ATDM Decision Rules Demand ◦ Peak Hours, cease activity, re-open lanes. ◦ Special event, cease activity, re-open lanes. Weather ◦ Bad weather, cease activity, re-open lanes. Incidents ◦ VSL, pre-positioned FSP, enforcement, etc. 16

Capacity Effects of ATDM/MOTP 17

HCM 2010 Table – Work Zones Not sensitive to ATDM actions 18

Capacity Adjustment (WZ) CAP WZ = N WZ * CPL WZ * g/C * F FFS * F DIS ◦ CAP WZ = Capacity of work zone ◦ N WZ = Number of lanes remaining open ◦ CPL WZ = The adjusted capacity of work zone per lane (From eqns. 10-9, of HCM 2010) ◦ g/C = Percent of time lanes open through work zone ◦ F FFS = Change in free-flow speed factor ◦ F DIS = Distractive effects factor 19

Distractive Effects of WZ 20 No. of Work Zone Lanes Freeway Multilane Highway 2-Lane Highway Urban Street 179%TBD 281%TBD 383%TBD 485%TBD 5+87%TBD Freeway adapted from Exhibit 10-17, 2010 HCM. TBD = To be determined by further research.

Capacity Effects of FFS Reduct. 21 Facility TypeFreeway Multilane Highway 2-Lane Highway Urban Street Capacity Reduction per 5 mph FFS Reduction 2.1%TBD Range of Validity 70 to 55 mph TBD Source: Exh HCM 2010 TBD There is no freeway capacity reduction for speeds between 70 and 75 mph. TBD = To be determined by further research.

Enforcement Adjustment Factors to Free-Flow Speed (FFS) Enforcement Measure Enforcement Adjustment Factor (F ENF ) Static Signs 50% Flagmen 70% Dynamic Feedback Signs 80% Visibly Present Enforcement Personnel 90% Feedback Signs plus Visibly Present Enforcement 100% 22 FFS WZ = FFS NWZ + [PSL WZ -PSL NWZ ] * F ENF PSL = posted speed limit

Adapting HCM to WZ and Inc. 23

Arterial WZ Filtering Effects Check if work zone will: ◦ Filter arrivals at downstream signal ◦ Cause demand starvation at downstream signal Check if work zone queue will impact upstream signal operation Check if downstream signal queue will affect work zone capacity 24

25

Traveler Info and TDM Effects 26 T 0 = The “Before” travel time equivalents (min) V 0 =The “Before” demands (veh) T =The “Work Zone” travel time equivalents (min) V =The “Work Zone” demands (veh) β=Beta, travel time elasticity. γ=Gamma, route diversion parameter. MP = Market Penetration (% aware).. R= Resonance of message factor. A= Anticipation factor (advance notice of event). TDM=Expected reduction in demand due to TDM incentives

Wrap Up Suggestions/Comments? Comments/Questions to: ◦ Jim Hunt, FHWA, ◦ Rick Dowling, 27