Linac4 status and long-term schedule M. Vretenar, Project Meeting 1.10.15  status  timeline  open issues  status  timeline  open issues.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
Progress and Plan for Superconducting RF Cavity RF Group.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
4.0 Accelerator Physics & Pre-operations (1.10) Phil Martin, Stan Ecklund, Rick Baartman & Peter Limon 4.1Accelerator Physics Findings The hot spare.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
1 1. Some recent views ( ) 2 Linac tunnel
LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Linac4 Status 1 M. Vretenar sLHC public event
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
TBTS Test Program & Schedule G. Riddone
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
WBS2.11 Vacuum systems G.Vandoni …brainstorming presentation… VAT Technical & Scientific7 th July 2008.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
Linac4 status and perspectives
The CERN Linac4 history, performance, perspectives
Results of the Risk Analysis
Experience with beam instrumentation at Linac4
Updated with comments 22 may 2017 Updated again 29 June 2017
Linac4 M. Vretenar for the Linac4 design team
LIU Wire Scanner Milestones June 2017
Complementary ISTC Projects #3888, 3889p
AD consolidation activities in LS2
on behalf of the RF group
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Physics design on Injector-1 RFQ
Renovation of the 45-year old PS magnets
Linac4 RF System Operation for the Reliability Run in 2017
Update on Linac4 Status, Reliability Run and Modelling
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LINAC4 commissioning plans etc.
Ciprian Plostinar Workshop on Testing and Commissioning
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues

 The situation is not too bad: we are preparing for an important milestone, the 50 MeV beam (our objective #1), with many thanks to all those who have worked hard to come to this point. On top of that the new ion source operates steadily since August with a current sufficient for the 50 MeV tests. LINAC4 PROJECT OBJECTIVES :  50 MeV readiness (replacement of Linac2 with Linac4 protons): summer  160 MeV H- connection readiness (all equipment ready for connection): end  Actual connection during Long Shutdown 2. LINAC4 PROJECT OBJECTIVES :  50 MeV readiness (replacement of Linac2 with Linac4 protons): summer  160 MeV H- connection readiness (all equipment ready for connection): end  Actual connection during Long Shutdown 2.  It is time to look at the future and to present and discuss the next milestones and the steps that will bring us to the connection of Linac4 during LS2.  While the general communication in the project goes via the Monday morning Installation meetings, we need from time to time a general project meeting to discuss the medium-long term and to agree on the Masterplan. If you have comments please make them now (or never!).

Installed in accelerator tunnel about 75% of all components: ion source, RFQ, chopper line, 3 DTL tanks, 5/7 CCDTL tanks, 3/12 PIMS tanks, main beam dump, bendings, parts of transfer line. CCDTL (100 MeV) Main dump and bending to PSB DTL tank3

PhaseEnergyDuration (incl. HW test) 13 MeV – MeV – MeVOctober MeVFebruary MeVAugust 2016 diagnostic line Linac4 is commissioned in 5 stages of increasing energy: 12 MeV BREAKING NEWS : (more in Alessandra’s presentation)  The ion source is steadily delivering ~50 mA since early August.  The emittance is still larger than design but can be improved.  Beam tests at 3 MeV (RFQ) in last week: 46 mA source, 40 mA LEBT, 33 mA after RFQ. BREAKING NEWS : (more in Alessandra’s presentation)  The ion source is steadily delivering ~50 mA since early August.  The emittance is still larger than design but can be improved.  Beam tests at 3 MeV (RFQ) in last week: 46 mA source, 40 mA LEBT, 33 mA after RFQ. 107 MeV Expected October 2015 Measurement line with temporary dump

Planning by J. Coupard

Install Debuncher at the position of the HST, leave temporary dump in, send beam in first 3 bendings and in debuncher 6-month long reliability run (beam sent on the main dump) 8-month window for inteerventions and repairs after reliability run (eg. DTL2) 3-month beam testing after the repairs and interventions start connection activities After installation of new LBE and dump at PSB entrance, transport and measure the nbeam in LBE (PS closed)

 The last remaining endeavour of the Linac4 project is the construction of the PIMS (Pi-Mode Structure) cavities ( MeV). Components built in Poland. Metrology, assembly, re-machining, cleaning, EB welding, survey, vacuum and RF tests at CERN. Some delay (long time needed for the qualification of the production in Poland, some recent transport and brazing accidents). Is now on the critical path for reaching 160 MeV in time for the Half-Sector Test of PSB H- injection foreseen in Linac4 from August  Out of the 12 cavities, 3 are installed in tunnel and 2 are almost completed. 7 cavities are in production phase; (+ the debuncher). Last cavity should be ready for installation at beginning of June 2016.

 The CMAC Cost Review in March observed that «the large operating cost of the LHC could justify the acquisition of a spare RFQ to address this single-point failure item». This was already considered several times in the past (Linac2 has a spare RFQ, which was never used).  In June, we have done a risk analysis meeting with all persons involved in the construction and operation of the Linac4 RFQ. We analysed 9 possible RFQ failure scenarii, based on our experience and on the experience of other laboratories, and proposed a number of mitigations (more spare parts, interventions on upstream equipment to protect the RFQ).  Conclusion is that in all scenarii mitigations would allow to come back to normal operation in a time below 2 weeks (estimated as exchange time with a spare RFQ). Are there other failure scenarii that we did not consider?  The results will be presented at the sector level to take a common decision. Even if we do not have a spare RFQ, we could purchase the copper to build one or more RFQ modules in emergency (8 months delivery time). Electrode damage (sputtering of copper) due to beam loss at the RFQ entrance Electrode contamination due to Cs deposition / normal cesiation. Electrode contamination due to Cs deposition / cesiation accident. Damage of the RF power coupler (mechanical deformation or surface effects) Vacuum degradation due to a cooling circuit water leak (e.g. erosion of the brazed joints of water circuit caps Repeated sparking between vanes due to loss of LLRF control. Mechanical deformation of the RFQ. Vacuum contamination of the RFQ from hydrocarbons. Flanges for RF tuner or RF pick-up are broken because of mechanical stress. The 9 RFQ failure scenarii Report to be prepared by C. Rossi

One final worry: EVM  Looks like in the last 9 months we are spending a large amount of money but there is very little progress…  Is it the reality or simply you have stopped reporting your progress in EVM?  Please update your reporting (there are several late reports!) Late reporting: Buncher amplifiers, LLRF, power converters, survey, (BIDs?)

Every new accelerator must publish a Design Report (as CERN Yellow Report)  The only Linac4 complete reference is the old Technical Design Report published in 2007 (Linac4 is still double frequency and positioned in the PS South Hall…)  This is the right moment to work at the final Design Report, because: a) the design of the accelerator is completely defined; and b) we still (vaguely) remember what we have done.  The production of the report should not be too difficult because a lot of information exists in the form of EDMS documents, Workpackage Descriptions, Conference papers, etc. More than writing, we need to do copying, pasting and cutting.  The goal is to produce a small (100 pages) report with references (and links!) to existing documentation.  It should be both a Quick Reference Guide and an entry point to retrieve Linac4 information.

Editorial Board: S. Ramberger M. Vretenar C. Noels/J. Double

Each Section should contain: 1.Design choices 2.Description 3.Parameters 4.Schematics, drawings, photographs 5.Testing and commissioning 6.List of reference documents, with links Each Section should contain: 1.Design choices 2.Description 3.Parameters 4.Schematics, drawings, photographs 5.Testing and commissioning 6.List of reference documents, with links Deadlines: -Send mail and templates Contributions received First complete draft Revised draft Final version Ready for publication Deadlines: -Send mail and templates Contributions received First complete draft Revised draft Final version Ready for publication

 LaTeX or Word – but LaTeX preferred! TeXLive 2015:  Follow Guidelines:  Use the Templates: publishing.cern.ch/index.php/CYR/pages/view/templates Limit yourself to the available styles! Information from S. Ramberger